Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Beaumont Stream Gage Installation Project

Awarded
2026060004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 15 hours ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The City of Beaumont has been contracted by the California Department of Water Resources to install four stream gaging stations as part of the California Stream Gage Improvement Program. The installations will occur at four specific locations: one on Cooper’s Creek at W. 4th Street, one on San Timoteo Creek at Potrero Blvd., and two on San Timoteo Wash at the San Timoteo Canyon Road and Eastside Ranch Road crossings. Each station will be equipped with a staff plate mounted on a T-post in the channel, a 2-inch diameter PVC stilling well extending to the channel invert, a conductivity and water level probe, a data logger with integrated telemetry, and an antenna. The stilling well will be secured to a T-post on the streambank, connected via flexible conduit to a separate PVC pipe housing the instrumentation away from the water flow. All equipment will be installed using only hand tools, with no heavy machinery permitted to minimize environmental impact. The project emphasizes precise instrumentation and durable, low-impact deployment methods to ensure reliable, continuous hydrologic data collection. The data logger will transmit real-time measurements remotely, enabling monitoring of stream levels and water conductivity across the watersheds. Installation will be completed in compliance with site-specific conditions, ensuring the integrity of the stream channels and surrounding environment. The primary point of contact for the State is Brian Humphrey, Senior Environmental Scientist, and for the City of Beaumont, Thaxton Van Belle, Director of Water Reclamation, with the contract publicly listed under the California environmental planning portal as of August 6, 2026.

General Info

City of Beaumont to install four low-impact stream gage stations with telemetry for real-time hydrologic data.

Agency

California Water Resources, Department of

Place of Performance

San Timoteo Canyon Road, Potrero Blvd., Beaumont, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Brian HumphreySr. Environmental Scientist (Specialist)
Thaxton Van BelleDirector of Water Reclamation

Full Description

Show more
As part of the California Stream Gage Improvement Program, the California Department of Water Resources has executed a contract with the City of Beaumont to install a total of four stream gages. One stream gage will be installed on Cooper's Creek at W. 4th Street (33.929545, -117.021603), one on San Timoteo Creek at Potrero Blvd. (33.941267, -117.017003), and two on San Timoteo Wash at San Timoteo Canyon Road crossing (33.986681, -117.134239) and Eastside Ranch road crossing (33.972931, -117.085200). Each gaging station will include a staff plate, 2-inch diameter PVC stilling well with flexible conduit, a conductivity and water level probe, data logger with integrated telemetry, and antenna. The staff plate will be installed in the channel attached to a T-post. The stilling well will be installed on the streambank and extend to the channel invert, where the water level and conductivity probe will be installed near the channel bottom. Flexible conduit will connect the stilling well to a ~2" diameter PVC pipe that will house the instrumentation outside the channel. The stilling well will be secured to a T-post driven into the streambank, while the data collection equipment and antenna will be secured to a T-post outside the channel or on the bridge structure at the San Timoteo Wash at San Timoteo Canyon Road. Installation will be limited to the use of hand tools with no use of heavy equipment.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS