Harbor-UCLA Medical Center Campus Master Plan Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

On July 21, 2026, the Board approved two change orders for the Harbor-UCLA Medical Center Replacement Program, authorizing the design and construction of an auxiliary generator yard at Surface Lot 2 along with a utility ductbank and bridge linking the new Central Utility Plant to the Surgery/Emergency Building. This work is being executed in full compliance with the Environmental Impact Report Addendum certified by the Board of Supervisors on February 8, 2022, which amends the original EIR certified on December 20, 2016. The project falls under the broader Harbor-UCLA Medical Center Campus Master Plan and is being managed by Los Angeles County Public Works, with performance focused in Lynwood, California, at the 90502 ZIP code. Public notice of the procurement action was issued on August 5, 2026, as a forecast, and all inquiries may be directed to Edrod Poblete, Document Controller, at the provided contact details.

General Info

Approved auxiliary generator yard and utility links for Harbor-UCLA Medical Center in Lynwood, CA, compliant with 2022 EIR addendum.

Agency

California → Los Angeles County Public Works

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Carson Street and Normandie Avenue, CA, 90502

Set-Aside

NONE

Documents

(1)

Harbor-UCLA Replacement Program - Construction Change Orders Notice of Determination

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Public Works
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Public Works
Office AddressN/A
Contacts
Edrod PobleteDocument Controller

Full Description

Show more
On July 21, 2026, the Board adopted two change orders for the Harbor-UCLA Medical Center Replacement Program. The approved change orders include design and construction of an auxiliary generator yard at Surface Lot 2 and the utility ductbank and the bridge connecting the new Central Utility Plant to the Surgery/Emergency Building. Work is in accordance with the Environmental Impact Report (EIR) Addendum certified by the Board of Supervisors on February 8, 2022 for the Harbor-UCLA Medical Center Replacement Project. The original EIR was certified on December 20, 2016.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details