Statewide Monitoring Network Modernization Project - Black Mountain Soil Probe Installation / Vegetation Removal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources is implementing the Statewide Monitoring Network Modernization Project at the Black Mountain Radar facility within the Los Padres National Forest in San Luis Obispo County. The project involves the installation of soil sensor probes to collect real-time soil moisture data, which will be made publicly available through the California Data Exchange Center website. The scope of work includes the excavation of a 3x3x3 foot temporary soil pit and the installation of buried cables in conduit via trenching up to 50 feet to connect the probes to the existing hydrometeorological station. All excavation and backfilling will be performed using hand tools. Additionally, the project requires the removal of chaparral vegetation within 100 feet of the station using hand tools and chainsaws to mitigate wildfire risks. This project is classified under NAICS code 237990 and was forecasted on August 4, 2026. It is managed by Brian Humphrey, a Senior Environmental Scientist. The work is conducted under CEQA Guidelines categorical exemptions 15301, 15304, and 15306, as the activities are considered minor alterations to land and information collection that will not significantly impact the environment. The performance site is located approximately 14 miles east of Santa Margarita.

General Info

Install soil sensors near Black Mountain station, clear chaparral within 100 feet, manual excavation, improve water and wildfire data.

Agency

California Water Resources, Department of

Place of Performance

Black Mountain Road (Forest Route 29S10), CA, 93453

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Brian HumphreySr. Environmental Scientist (Specialist)

Full Description

Show more
DWR is proposing to install soil sensor probes within 50 feet of the existing Black Mountain hydrometeorological station, located within the Los Padres National Forest. Installation of the soil probes would require the excavation of a 3' x 3' x 3' temporary soil pit where soil robes would be installed to collect soil moisture data. The soil probes would be connected to the existing station with buried cables in conduit, which would require trenching up to 50' from the proposed soil probes to the existing station. The temporary soil pit and associated trenching would be excavated and backfilled with the use of hand tools. In addition, Chaparral vegetation surrounding the existing station (up to 100') would also be removed with hand tools and chainsaws to minimize the risk of damage and spread of wildfire.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFP - Grappler Wharf Replacement
Solicitation # RFP - GWR10-26
The Alberni-Clayoquot Regional District (ACRD) has issued solicitation RFP-GWR10-26 for the Grappler Wharf Replacement project in Bamfield, British Columbia. The project involves replacing deteriorated floating dock infrastructure used for public access, public moorage, and Fire Service operations. The scope is divided into two primary parts: Component A, focusing on the Park Service Float Replacement, and Component B, covering the Bamfield Fire Rescue Float Replacement and Boathouse Extension. The contractor will be responsible for the removal and disposal of old materials and must maintain the existing footprint and operational function of the facility. Proposals are due by 2:00 pm Pacific Time on November 26, 2026, with an anticipated award date of December 09, 2026. The ACRD will evaluate submissions based on experience, qualifications, references, project understanding, approach, schedule, and social procurement practices. Award decisions will be based on the most advantageous proposal rather than the lowest cost. Successful proponents must provide a proposed construction schedule and milestone dates, as the district prefers completion at the earliest practical opportunity. Key administrative and regulatory requirements include maintaining 5 million dollars in general liability insurance and providing a WorkSafe BC Letter of Good Standing. The contractor must comply with the Navigable Waters Act and the provincial Wildlife Act, specifically regarding the timing of pile driving to protect breeding birds. Upon contract closure, the contractor is required to submit a GHG emission report and a quantifying spreadsheet template. Invoicing must be submitted separately for Component A and Component B. The designated point of contact for this procurement is Charity Hallberg Dodds.
Alberni-Clayoquot Regional District

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Orangegate Park Phase 1 Site Improvements
Solicitation # 2026-MPW-241
The Orangegate Park Phase 1 Site Improvements project, solicitation 2026-MPW-241, is a public works construction contract for the development of new park facilities in Tacoma, Washington. The scope of work includes the construction of a parking lot, restrooms, covered shelters, a playground, and trails, along with all necessary utilities and infrastructure. The project has an estimated value between 6 million and 6.7 million dollars, excluding Washington State Sales Tax. The successful contractor will be required to complete the work within 310 to 340 calendar days from the Notice to Proceed, with liquidated damages set at 1,700 dollars per day. The project requires extensive coordination with the Pierce County Parks Natural Lands Team and various authorities having jurisdiction, including TPU, Lumen, and Summit Water. Because the site is in a public area with a history of community use, the contractor must implement effective safety and security measures to delineate work areas while keeping as much of the park open to the public as possible. Technical requirements include compliance with the Build America, Buy America Act, ADAAG accessibility guidelines, and prevailing wage laws. Bids are evaluated based on responsiveness and responsibility, with the award going to the lowest responsive bidder. Required submittals include a 5 percent bid bond, a subcontractors list, and certifications regarding debarment and wage training. Once awarded, the contractor must provide 100 percent payment and performance bonds. Project administration will be managed through Procore, and final acceptance is contingent upon the completion of all contract obligations and the approval of all required permits.
Parks and Recreation

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
27-017-Abernathy Greenway Southside Improvements (Re-bid)
Solicitation # 27-017
The Abernathy Greenway Southside Improvement Project is a comprehensive initiative by the City of Sandy Springs, Georgia, to transform a greenspace park into an accessible, environmentally sensitive, and community-focused destination. The scope of work involves extensive site preparation, including erosion control, selective clearing, demolition, and grading, alongside the installation of infrastructure such as trails, storm drainage, stream restoration, water quality measures, and a nature preserve area. Additional requirements include the installation of hardscape, site furnishings, irrigation, landscape planting, the relocation of sanitary sewer lines, and the construction of a landscape storage facility. All work must adhere to Georgia Department of Transportation standard specifications, ADA and ASTM safety standards, and specific design documents provided by AtkinsRéalis. This solicitation is issued as an Invitation to Bid (ITB) using a Firm Fixed Price lump-sum award mechanism. Bidders must provide a Base Bid for improvements from Long Acres Drive to Wright Road, with three optional alternatives covering sanitary sewer improvements, two-year landscape maintenance, and further greenway improvements east of Wright Road. To be considered responsive, bidders must submit a Bid Schedule, a bid bond if the price exceeds 100,000 dollars, an equipment list, and references from similar projects completed within the last five years. Required certifications include E-verify, the Georgia Security and Immigration Compliance Act affidavit, and a drug-free workplace certification. Upon award, the contractor must provide performance and payment bonds, a certificate of insurance, and a key personnel list within specified timeframes.
City of Sandy Springs

POSTED

about 11 hours ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS