Well 34 and Well 19 Wellhead Treatment Project (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Well 34 and Well 19 Wellhead Treatment Project, managed by the State Water Resources Control Board Division of Drinking Water, involves critical water treatment system improvements in Montclair, California. The primary objective is to reduce 1,2,3-TCP and nitrate concentrations to levels within their respective Maximum Contaminant Levels. The scope of work includes excavation, the installation of approximately 10,586 square feet of concrete pads, and the deployment of four GAC vessels and two IX structures. Additionally, the project requires the installation of six aboveground storage tanks, consisting of two brine tanks and four waste tanks, the reconfiguration of well discharge piping, the addition of site lighting, and soil backfilling at the Well 34 site. The system will feature two parallel trains, each treating 1,000 gallons per minute, with additional concrete pad space reserved for a third train to treat Well 19. Construction will disturb approximately 0.87 acres of the 1.38-acre project site, and there will be no expansion of permitted water production from the wells. This project is classified under NAICS code 237990 and is exempt under California Code of Regulations sections 15301 and 15303. The State Water Board issued Permit Amendment No. 06-27-26A-005 on August 3, 2026, to authorize these improvements.

General Info

Water treatment system improvements in Montclair, California, targeting 1,2,3-TCP and nitrate reduction.

Agency

California → SWRCB, Division of Drinking Water

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

e/o Palo Verde St. & Camulos Ave, Montclair, CA (APN: 1009-182- 11), Montclair, CA

Set-Aside

NONE

Documents

(1)

NOE - Well 34 and Well 19 Wellhead Treatment Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Drinking Water
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Drinking Water
Office AddressN/A
Contacts
Hector CazaresDISTRICT ENGINEER
Justin Scott-CoeGeneral Manager

Full Description

Show more
The Project consists of water treatment system improvements to Well 34 and Well 19. The project includes excavation, addition of ~10,586 square feet of concrete pads, the installation of four GAC vessels to treat for 1,2,3-TCP followed by two IX structures to treat for nitrate, 6 aboveground storage tanks (2 brine tanks and 4 waste tanks), the reconfiguration of the well discharge piping, additional site lighting, and the backfilling of soil to restore the ground level at the existing Well 34 site. Each of the two parallel trains would treat 1,000 gallons per minute (gpm). Concrete pad space was included to allow a third train of GAC and IX to be installed to treat Well 19. This would result in the concentrations of 1,2,3-TCP and nitrate at levels within the respective MCL. Approximately 0.87 acres of the 1.38-acre Project Site would be disturbed over the course of construction. There will be no expansion of permitted use to produce water from Well 34 and Well 19.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
Retamal Dam Buoy System
Solicitation # 191BWC26R0006
The International Boundary and Water Commission (IBWC) is soliciting a firm-fixed-price design-build contract for the Retamal Dam Buoy System in Hidalgo County, Texas. The project aims to establish a new waterway barrier line featuring anchors, an alert system, and warning signs to prevent public access to dangerous hydraulics and reduce structural impacts from debris. The scope is divided into two phases: the preparation of design documents and the subsequent construction and commissioning of the system. The estimated project magnitude is between 5 million and 10 million dollars, with a total performance period of 485 calendar days from the notice to proceed. The procurement follows a two-phase design-build selection procedure under FAR Subpart 36.3, where award is based on a rational tradeoff between cost and non-price evaluation factors, including technical plans, past performance, and financial condition. Bidders must meet strict qualification requirements, including the submission of IBWC Form 245 and evidence of professional licensure for design engineers. Site access is restricted to specific working hours, and contractors must coordinate with Border Patrol and avoid US Fish and Wildlife property. Proposals must be submitted exclusively via a secure SharePoint portal by the extended deadline of September 16, 2026.
Internat Boundary And Water Commission

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS