Chagoopa Plateau Meteorological Station

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources plans to upgrade the Chagoopa Plateau hydrometeorological station by replacing an aging 17-foot wilderness pole with a new galvanized hinged fold tilt pole anchored to a buried ballast tray base measuring 8.5 feet by 8.5 feet by 16 inches. This new pole design improves safety during maintenance operations and will be transported to the remote site via helicopter. In addition to the pole replacement, soil probes will be installed within 30 feet of the station, requiring the excavation of a temporary 3-foot by 3-foot by 3-foot soil pit and a shallow conduit trench connecting the station to the probes. All work is intended to modernize data collection infrastructure and enhance operational safety without disrupting the surrounding wilderness environment. The project is publicly forecasted with a posted date of August 3, 2026, and the primary point of contact is Brian Humphrey, Senior Environmental Scientist at the California Department of Water Resources.

General Info

Replace aging pole with new galvanized hinged pole, install soil probes, helicopter transport, no wilderness disruption.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE_Form_Chagoopa_signed_2026

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Brian HumphreySr. Environmental Scientist (Specialist)

Full Description

Show more
DWR proposes to upgrade outdated data collection equipment and replace a 17-foot wilderness pole at the Chagoopa Plateau hydrometeorological station with a galvanized hinged fold tilt pole anchored to a buried ballast tray base (8.5' x 8.5' x 16"). The hinged fold tilt pole and ballast tray base would be transported by helicopter. Soil probes would also be installed within 30 feet of the station by excavating a 3' x 3' x 3' temporary soil pit and shallow conduit trench from the station to the probes. The proposed tilt pole would also address potential safety concerns with ongoing maintenance activities at the station.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details