Conn Creek Land Lab Pilot Project (Request No. 1652-2026-093-001-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Conn Creek Land Lab Pilot Project, managed by the San Francisco Bay Regional Water Quality Control Board, focuses on implementing biotechnical and rock bank stabilization measures in St. Helena, Napa County. The primary objective is to reduce bank erosion, sedimentation, and destabilization while enhancing native vegetation communities. Key deliverables include the installation of brush and gully packing, backfilled one log and rock dams, live plantings, and woody wattle measures. These activities will be performed primarily by hand, utilizing mini excavators, tracked utility vehicles, and water trucks, with a strict prohibition on using excavators or tracked vehicles within creek beds. Revegetation efforts will involve native species seeding, container planting, and the removal of invasive species to encourage native recruitment within the riparian transition zone. To ensure the success of these plantings and protect the riparian understory, the project includes the implementation of a grazing and exclusion plan. This project is classified as a small habitat restoration project covering less than five acres and has been granted a categorical exemption under Section 15333. The primary point of contact for the project is Environmental Scientist Alicia Pisani.

General Info

Stabilize eroding banks with native materials, hand-installed biotech measures, exclude livestock, enhance riparian habitat in St. Helena.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

St. Helena, CA

Set-Aside

NONE

Documents

(1)

Notice of Categorical Exemption - Conn Creek Pilot Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Alicia L. PisaniEnvironmental Scientist

Full Description

Show more
The Project will implement biotechnical and rock bank stabilization measures using a combination of native rock, woody debris, brush, and strategic vegetation placement in designs that include brush and gully packing, backfilled one log and rock dams, live plantings, and woody wattle measures at each action area to reduce bank erosion, sedimentation, and destabilization, and to increase native vegetation communities with functions and services greater than existing conditions. Measures will be installed primarily by hand, with mini excavators, tracked utility vehicles, and water trucks. Most materials will be sourced from uplands on-site or nearby properties (e.g. vine wood, oak and conifer limbs and brush, willow cuttings, rock, acorns, etc.). No excavators or tracked vehicles will be used in the creek beds. Revegetation efforts will consist of native species seeding, container planting, and selective competing species placement and invasive removal actions to encourage native species recruitment at the tops of banks and into the riparian transition zone between waters and the riparian corridor to increase the area's mix of herbaceous ground cover, understory shrubs, and trees native to the region and adapted to the area. The Project will also implement a grazing and exclusion plan to protect the riparian understory and new vegetation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Assunpink Creek Site 8 Dam Rehab – NRCS-New Jersey
Solicitation # 12FPC326Q0056
Solicitation 12FPC326Q0056 is a Request for Quotation issued by the USDA NRCS-NJ office for the rehabilitation of the Assunpink Creek Watershed Dam Site 8 in Hamilton Township, Mercer County, New Jersey. The primary objective is to rehabilitate the dam to meet or exceed state and federal dam safety criteria while maintaining existing flood protection levels. This is a Total Small Business Set-Aside under NAICS code 237990, with an updated size standard of 45 million dollars. The project scope includes site preparation, clearing and grubbing, structure removal, earthfill operations, the installation of drainage piping, and the use of roller compacted concrete. Work must be completed within 180 days after the notice to proceed is issued. The government will award the contract based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, ability to meet the schedule, and past performance regarding dam construction and roller compacted concrete installation. Quotations are due by September 21, 2026, at 1:00 PM ET, with a site visit having been scheduled for September 17, 2026. The contract is subject to the Davis-Bacon Act and requires the use of the Treasury's Invoice Processing Platform for monthly electronic invoicing. Key deliverables include a Temporary Traffic Control Plan due within 15 days of award and a detailed excavation plan submitted 30 days prior to the start of excavation.
Fpac Bus Cntr-Acq Division

POSTED

about 1 hour ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS