Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Permit No. 20095 – Chowchilla Subbasin Recharge Project 2

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Valley Flood Protection Board is seeking to construct a flow diversion system through the Chowchilla Eastside Bypass levee to enable groundwater recharge in the Chowchilla Subbasin. The project involves excavating a channel from the bypass to near the waterside levee toe, leading into a fish screen intake system that directs water through a 100-foot-long, 36-inch-diameter buried concrete culvert. The flow then reaches a gate control box equipped with a slide gate to allow for positive closure, ensuring precise control over water movement. The system continues through the levee to the landside, terminating at a concrete pump box where water is lifted into a distribution pipeline for targeted recharge. This engineered solution is designed to safely and efficiently channel excess surface water into aquifers while protecting aquatic life and maintaining levee integrity. The project is identified under Permit No. 20095 and is forecasted for public notice with a posted date of August 3, 2026. Primary contact points include Jennifer Calles, Senior Environmental Scientist at the Central Valley Flood Protection Board, and Stephanie Anagnoson, Director of Water and Natural Resources for Madera County. The work will take place in California, specifically within the Chowchilla Subbasin, and is part of broader efforts to enhance regional groundwater storage and flood management. No set-aside provisions or NAICS codes have been specified, and the initiative reflects a collaborative approach between state and county agencies to address water resource sustainability in the Central Valley.

General Info

Construct flow diversion through levee to recharge groundwater via culvert, gate box, and pump system in Chowchilla Subbasin.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

2026

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jennifer CallesSenior Environmental Scientist
Stephanie AnagnosonDirector of Water and Natural Resources

Full Description

Show more
To construct a flow diversion through the Chowchilla Eastside Bypass levee for groundwater recharge. The project will include an excavated channel from the Bypass to near the waterside levee toe, into a fish screen intake system, through a buried 36-inch diameter concrete culvert, approximately 100-feet-long, to a gate control box with slide gate for positive closure, through the levee to the landside of the levee to a concrete pump box where the water is pumped into a distribution pipeline.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details