Laton North Recharge Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Laton North Recharge Project seeks approval for Permit No. 19917 under California Code of Regulations, Title 23, Article 3, Section 6, to construct a concrete diversion turnout with outfall structures through the north bank levee of Cole Slough for groundwater recharge purposes. The project includes two 60-inch diameter reinforced concrete conveyance pipelines with rubber gasket joints, encased in CLSM and protected by a seepage filter, along with two gatewells featuring slide gates for positive closure and a box metering stand to monitor flow. Approximately 41 feet of Class VI riprap, 24 feet wide and 2 feet deep, will be installed along the waterside to prevent erosion. The Kings River Conservation District serves as the nonfederal sponsor, operator, and maintainer of the levees and channels at the project site. The Laguna Irrigation District is the approving agency, with Scott Sills listed as the primary point of contact and Angela Nguyen-Tan as a senior environmental science liaison. The project forecast was posted in August 2026 and is located in California.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
