Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Laton North Recharge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Laton North Recharge Project seeks approval for Permit No. 19917 under California Code of Regulations, Title 23, Article 3, Section 6, to construct a concrete diversion turnout with outfall structures through the north bank levee of Cole Slough for groundwater recharge purposes. The project includes two 60-inch diameter reinforced concrete conveyance pipelines with rubber gasket joints, encased in CLSM and protected by a seepage filter, along with two gatewells featuring slide gates for positive closure and a box metering stand to monitor flow. Approximately 41 feet of Class VI riprap, 24 feet wide and 2 feet deep, will be installed along the waterside to prevent erosion. The Kings River Conservation District serves as the nonfederal sponsor, operator, and maintainer of the levees and channels at the project site. The Laguna Irrigation District is the approving agency, with Scott Sills listed as the primary point of contact and Angela Nguyen-Tan as a senior environmental science liaison. The project forecast was posted in August 2026 and is located in California.

General Info

Construct concrete diversion turnout and pipelines for groundwater recharge through Cole Slough levee, managed by Kings River Conservation District.

Agency

California → Laguna Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Permit 19917 Notice of Determination for Laton North Recharge Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Laguna Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Laguna Irrigation District
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist

Full Description

Show more
Approval of Permit No. 19917, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct new concrete turnout with outfall structures through the right (north) bank levee of Cole Slough for groundwater recharge. The structure consists of a concrete diversion turnout with two (2) 60-in diameter rubber gasket-jointed reinforced concrete conveyance pipelines encased in CLSM with seepage filter, two (2) gatewells with slide gates for positive closure, and box metering stand. To install approximately 41-feet-long, 24-feet-wide, and 2-feet deep of Class VI riprap adjacent to the waterside structure for erosion control. Kings River Conservation District is the nonfederal sponsor, operator and maintainer of the levees and channels at this project location

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details