Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Guadalupe Quarry Redevelopment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Guadalupe Quarry Redevelopment Project entails the construction and operation of a light fabrication facility dedicated to assembling, processing, treating, and packaging goods, alongside supporting uses such as office spaces, research and development areas, storage, sales, and distribution functions. The project also includes a parking garage, amenity and utility zones, and a 49.9 megawatt electrical substation and switching station with overhead transmission lines that will interface with existing high-tension power infrastructure owned by Pacific Gas and Electric Company to the west of the site. Integral to the project is the closure and environmental reclamation of the Guadalupe Quarry, which involves the annexation of a portion of the quarry into the City of Brisbane, adjustments to the sphere of influence, subdivision of land parcels, and alignment with updated general plan land use and pre-zoning designations. Part of the development will preserve the upper benches and undisturbed areas of the former quarry as protected open space to maintain ecological integrity and comply with environmental stewardship goals.

General Info

Construction of fabrication facility, substation, and reclamation of Guadalupe Quarry with open space preservation.

Agency

California → City of Brisbane

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Quarry Road at South Hill Drive, Brisbane, CA, 94005

Set-Aside

NONE

Documents

(2)

Revised Notice of Preparation for Quarry Innovation Center Project

PDFpresolicitation

Notice of Completion for Guadalupe Quarry Innovation Center Project SCH#2022060358

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Brisbane
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Brisbane
Office AddressN/A
Contacts
Peter MyeSenior Project Manager
Ralph RobinsonContract Senior Planner
Tyler HigginsOrchard Partners

Interested Companies (1)

Show more
Panorama Environmental
San Francisco, CA

Full Description

Show more
The proposed Project includes construction and operation of a light fabrication building, including assembling, processing, treating, and packaging, with accessory uses including but not limited to office, research and development, storage, sales, and distribution; a parking garage; amenity/utility areas; a 49.9 megawatt electrical substation and switching station; and overhead electrical transmission service with associated improvements, which would connect to existing high-tension electrical transmission lines owned and operated by Pacific Gas and Electric Company (PG&E) to the west of the Project site. The Project would involve closure and reclamation of Guadalupe Quarry as a part of Project construction, as well as general plan land use and pre-zoning designations for land that is proposed for annexation into the Brisbane city limits, subdivision of parcels, sphere of influence amendment, and annexation of a portion of the existing quarry into the City of Brisbane, and preservation of habitat on the upper benches and undeveloped areas of the quarry as protected open space.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details