Copper Basin Discharge Valve Replacement and Access Road Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Copper Basin Discharge Valve Replacement and Access Road Improvements Project, identified by agreement number EPIMS-SBR-42438-R6, is an infrastructure rehabilitation effort executed by the Metropolitan Water District of Southern California and approved by the California Department of Fish and Wildlife. The project scope includes the rehabilitation of the slide gate valve and replacement of the discharge valve within the Copper Basin Dam valve house, along with the installation of new conduit, electrical components, and three concrete pads located 250 feet southwest of the dam. Additional structural work involves replacing the dam face ladder, installing a new catwalk and stairs, and reconstructing two concrete weirs approximately 125 feet downstream. To ensure safe access to the dam base, the project also includes the rehabilitation of 1.66 miles of existing dirt access road around the perimeter of the Copper Basin Reservoir. The project is located in San Bernardino County, California, and is subject to strict environmental compliance under Fish and Game Code section 1602 and the California Endangered Species Act. Because the work may result in the incidental take of the fully protected Desert bighorn sheep, the California Department of Fish and Wildlife issued Incidental Take Permit No. 2081(b)-2025-066-06. The project was approved on December 15, 2025, following a Mitigated Negative Declaration which determined that the project would not have significant environmental effects within the jurisdiction of the responsible agency, provided that specific mitigation measures and a Monitoring Plan are implemented.

General Info

Infrastructure rehabilitation of Copper Basin Dam valves and access roads in San Bernardino.

Agency

Metropolitan Water District of Southern California

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

EPIMS-SBR-42438-R6 Notice of Determination for Copper Basin Project

PDFnotice-of-determination

Notice of Determination for Copper Basin Valve Replacement Project 2081(b)-2025-066-06

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts2 people available
OfficeN/A
Organization / Agency
Metropolitan Water District of Southern California
Office AddressN/A
Contacts
Alex MarksSenior Environmental Specialist
Edith MartinezSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed and issued Lake and Streambed Alteration Agreement No. EPIMS-SBR-42438-R6, pursuant to Fish and Game Code section 1602, to the project Applicant, The Metropolitan Water District of Southern California. The Project proposes to rehabilitate the slide gate valve and replace the discharge valve within the Copper Basin Dam valve house; install new conduit and electrical components within the valve house; install three new concrete pads and electrical components 250 feet southwest of the Copper Basin Dam; install and anchor-in-place approximately 250 feet of above-ground electrical conduit from the new concrete pads to Copper Basin Dam; replace the ladder on the dam face; install a new catwalk and stairs immediately downstream of and adjacent to the valve house; remove and reconstruct two existing concrete weirs approximately 125 feet downstream of Copper Basin Dam; and install electrical conduit and instrumentation from the two weirs along the catwalk to the valve house. Additionally, the Project will rehabilitate approximately 1.66 miles of the existing dirt access road around the perimeter of Copper Basin Reservoir to facilitate safe access to the base of Copper Basin Dam.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS