Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Copper Basin Discharge Valve Replacement and Access Road Improvements Project

Forecast
EPIMS-SBR-42438-R6State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Copper Basin Discharge Valve Replacement and Access Road Improvements Project, identified by agreement number EPIMS-SBR-42438-R6, is an infrastructure rehabilitation effort executed by the Metropolitan Water District of Southern California and approved by the California Department of Fish and Wildlife. The project scope includes the rehabilitation of the slide gate valve and replacement of the discharge valve within the Copper Basin Dam valve house, along with the installation of new conduit, electrical components, and three concrete pads located 250 feet southwest of the dam. Additional structural work involves replacing the dam face ladder, installing a new catwalk and stairs, and reconstructing two concrete weirs approximately 125 feet downstream. To ensure safe access to the dam base, the project also includes the rehabilitation of 1.66 miles of existing dirt access road around the perimeter of the Copper Basin Reservoir. The project is located in San Bernardino County, California, and is subject to strict environmental compliance under Fish and Game Code section 1602 and the California Endangered Species Act. Because the work may result in the incidental take of the fully protected Desert bighorn sheep, the California Department of Fish and Wildlife issued Incidental Take Permit No. 2081(b)-2025-066-06. The project was approved on December 15, 2025, following a Mitigated Negative Declaration which determined that the project would not have significant environmental effects within the jurisdiction of the responsible agency, provided that specific mitigation measures and a Monitoring Plan are implemented.

General Info

Infrastructure rehabilitation of Copper Basin Dam valves and access roads in San Bernardino.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Alex MarksSenior Environmental Specialist
Edith MartinezSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed and issued Lake and Streambed Alteration Agreement No. EPIMS-SBR-42438-R6, pursuant to Fish and Game Code section 1602, to the project Applicant, The Metropolitan Water District of Southern California. The Project proposes to rehabilitate the slide gate valve and replace the discharge valve within the Copper Basin Dam valve house; install new conduit and electrical components within the valve house; install three new concrete pads and electrical components 250 feet southwest of the Copper Basin Dam; install and anchor-in-place approximately 250 feet of above-ground electrical conduit from the new concrete pads to Copper Basin Dam; replace the ladder on the dam face; install a new catwalk and stairs immediately downstream of and adjacent to the valve house; remove and reconstruct two existing concrete weirs approximately 125 feet downstream of Copper Basin Dam; and install electrical conduit and instrumentation from the two weirs along the catwalk to the valve house. Additionally, the Project will rehabilitate approximately 1.66 miles of the existing dirt access road around the perimeter of Copper Basin Reservoir to facilitate safe access to the base of Copper Basin Dam.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
W072 Endist Pittsburgh

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Metropolitan Water District of Southern California

Same awarding agency

NAICS: 237120
SLED
Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection ProjectThe Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project, managed by the Metropolitan Water District of Southern California, involves the permanent engineering reinforcement of critical water infrastructure in Riverside County. The project focuses on protecting pipelines from flotation, exposure, erosion, and seismic activity within the San Jacinto River. Specifically, the scope includes the concrete encasement of approximately 320 feet of the CRA Casa Loma Siphon No. 1 Pipeline and 295 feet of the San Jacinto Pipeline. These encasements will be reinforced with horizontal and vertical steel rebar, with the Siphon No. 1 encasement measuring 16 feet wide by 13 feet deep, and the San Jacinto Pipeline encasement measuring 12.5 feet wide by 10.7 feet deep. The project will not introduce new aboveground components or alter existing operation and maintenance conditions. The project is subject to rigorous environmental compliance and regulatory oversight, as detailed in an Initial Study-Mitigated Negative Declaration. Extensive biological assessments have been conducted to protect special-status species, including the San Bernardino kangaroo rat, Least Bell's Vireo, western burrowing owl, and various rare plants and bat species. The project site, covering approximately 6.7 acres, is located between Soboba Road and State Street. Contractors must adhere to strict standards regarding noise control, hazardous materials storage, and the protection of cultural and paleontological resources. The project was officially approved on April 14, 2026, following a public review period and coordination with agencies such as the US Army Corps of Engineers and the California Department of Fish and Wildlife.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS