Furman Park Stormwater Capture and Infiltration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Downey is implementing the Furman Park Stormwater Capture and Infiltration Project, located at 10419 Rives Avenue, California. The project aims to improve flood control, water quality, and groundwater supply by constructing a regional stormwater runoff capture facility. Key infrastructure includes a diversion structure to redirect water from a 96-inch RCP storm drain on Florence Avenue into an underground capture, treatment, and infiltration basin situated beneath existing baseball fields. The scope also includes the in-kind replacement of baseball field facilities and site enhancements such as native landscaping, a habitat garden trail, fencing, and lighting. This initiative is partially funded by the Los Angeles County Safe, Clean Water Program. The project is expected to be executed in two phases over approximately 18 months, with construction anticipated to begin in early 2026. Technical requirements emphasize strict adherence to CalOSHA excavation regulations and the geotechnical recommendations provided by Tetra Tech, including daily shoring inspections and rigorous construction quality assurance for soil-structure interactions. Environmental compliance has been addressed through a Mitigated Negative Declaration under CEQA, with specific attention given to noise mitigation, air quality emissions, and the protection of tribal cultural resources. Project administration is led by Dan Mueller, P.E., Deputy Director of Public Works for the City of Downey.

General Info

City of Downey stormwater capture project at Furman Park starting early 2026.

Agency

California → City of Downey

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Downey, CA

Set-Aside

NONE

Documents

(12)

Furman Park Stormwater Capture and Infiltration Project Notice of Completion

PDFnotice-of-completion

Appendix E - Noise Calculations for Furman Park Stormwater Capture Project

PDFsupporting-document

Appendix C - Energy Calculations

PDFother

Appendix D2 - Geotechnical Report Addendum No. 1 for Furman Park Stormwater Project

PDFgeotechnical-report

NOI Furman Park Stormwater Capture Project 2025

PDFnotice-of-intent

Furman Park Stormwater Capture and Infiltration Project SCH Submittal Form

PDFother

Addendum No.1 to Geotechnical Design Report for Furman Park Stormwater Facilities

PDFgeotechnical-report

Furman Park Draft Initial Study/Mitigated Negative Declaration

PDFismnd

Notice of Determination for Furman Park Stormwater Capture and Infiltration Project

PDFnotice-of-determination

Appendix A - CalEEMod Outputs for Furman Park Project

PDFother

Caltrans Comments on Furman Park Stormwater Capture Project MND

PDFcomment-letter

Appendix B - Cultural Resources Record Search Results

PDFcultural-resources-record-search

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Downey
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Downey
Office AddressN/A
Contacts
Dan MuellerDeputy Director of Public Works

Interested Companies (1)

Show more
Psomas
Loveland, Colorado

Full Description

Show more
The City would construct a regional stormwater runoff capture facility within Furman Park to provide multiple benefits including improved flood control, water quality, and water supply (through infiltration to groundwater). The Project would involve a stormwater diversion structure and underground infiltration basin, in-kind replacement of the existing baseball field facilities, and additional site enhancements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS