Furman Park Stormwater Capture and Infiltration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Downey is proceeding with the Furman Park Stormwater Capture and Infiltration Project to enhance flood control, improve water quality, and replenish groundwater through regional stormwater capture. The project entails constructing a stormwater diversion structure and an underground infiltration basin, alongside the in-kind replacement of existing baseball field facilities and additional site enhancements. Work will be performed at Furman Park in Downey, California, with geotechnical investigations including soil borings up to 56.5 feet deep, percolation testing, and laboratory analysis to support foundation design, seismic evaluation, and earthwork recommendations. Construction is scheduled across multiple phases from January 2026 through November 2027, beginning with demolition and progressing through site preparation, installation of diversion pipes, excavation, construction of the underground storage system, and final field surface restoration. Inspection and acceptance occur on-site under the oversight of the City of Downey, with compliance required to the 2019 California Building Code and LACDPW GS200.1 for percolation testing, as well as ASTM standards for subgrade material testing and environmental regulations from SCAQMD and CARB. While the estimated contract value is not specified and no formal contract type is stated, the project is being advanced under a forecast notice with a posting date of December 11, 2025, and a prior approval date of December 9, 2025. The primary point of contact is Dan Mueller, Deputy Director of Public Works, reachable via email and phone. No federal procurement clauses, special contract requirements, or socioeconomic certifications are identified, indicating the project operates under local authority and environmental review mechanisms such as CEQA, rather than federal acquisition regulations. Submissions for related environmental documentation require both electronic and 15 physical copies, though formal bidding instructions, proposal formatting rules, or submission deadlines for contractors are not detailed in the available information.

General Info

City of Downey to build stormwater capture system at Furman Park from 2026–2027, replacing baseball fields and complying with state environmental codes.

Agency

California → City of Downey

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Rives Ave & Irwinggrove Dr, Downey, CA, 90241

Set-Aside

NONE

Documents

(12)

Furman Park Stormwater Capture and Infiltration Project Notice of Completion

PDFnotice-of-completion

Appendix E - Noise Calculations for Furman Park Stormwater Capture Project

PDFsupporting-document

Appendix C - Energy Calculations

PDFother

Appendix D2 - Geotechnical Report Addendum No. 1 for Furman Park Stormwater Project

PDFgeotechnical-report

NOI Furman Park Stormwater Capture Project 2025

PDFnotice-of-intent

Furman Park Stormwater Capture and Infiltration Project SCH Submittal Form

PDFother

Addendum No.1 to Geotechnical Design Report for Furman Park Stormwater Facilities

PDFgeotechnical-report

Furman Park Draft Initial Study/Mitigated Negative Declaration

PDFismnd

Notice of Determination for Furman Park Stormwater Capture and Infiltration Project

PDFnotice-of-determination

Appendix A - CalEEMod Outputs for Furman Park Project

PDFother

Caltrans Comments on Furman Park Stormwater Capture Project MND

PDFcomment-letter

Appendix B - Cultural Resources Record Search Results

PDFcultural-resources-record-search

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Downey
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Downey
Office AddressN/A
Contacts
Dan MuellerProject Manager
Jessica HitchcockProject Manager

Interested Companies (1)

Show more
Psomas
Riverside, CA

Full Description

Show more
The City of Downey proposes to construct a regional stormwater runoff capture facility within Furman Park to provide multiple benefits including improved flood control, water quality, and water supply (through infiltration to groundwater). The stormwater facility would involve a stormwater diversion structure, which would divert water from an existing LACFCD 96” RCP storm drain located along Florence Avenue and convey stormwater to an underground capture, treatment, and infiltration facility situated beneath the existing baseball fields. The Project would also provide in-kind replacement of the existing baseball field facilities due to the placement of the basin, which would provide the City an opportunity to rehabilitate these recreation facilities as part of the Los Angeles County Safe, Clean Water Program (SCWP). The Project would also include site enhancements, such as native landscaping and a new habitat garden trail, as a new passive recreation opportunity in the park. The proposed Project would be constructed in two phases lasting a total of approximately 18 months, beginning as early as January 2026. The Project is partially funded by the Los Angeles County SCWP, which aims to plan, build, and maintain multi-benefit watershed-based projects that improve water quality and increase water supply and/or enhance communities. The SCWP is developed in collaboration with public health, environmental groups, cities, businesses, labor, and community-based organizations. The Project site has the potential to provide significant benefits for the City, including treatment of a sizable drainage area of 475 acres, which can offer runoff storage and water quality benefits. The Project would also address the additional need for stormwater management identified to achieve compliance with Lower Los Angeles River Watershed Management Program, as the City is a member of the Lower Los Angeles River Watershed Management Group (LLARWMG).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
AL ROLLINS PARK IMPROVEMENTS RFP
Solicitation # PE-75552-NONST-2026-000000067
The City of Dalton is soliciting proposals for the construction of improvements to Al Rollins Park located at 521 Threadmill Road, including grading of existing baseball fields for artificial turf installation, concrete curbing, storm drainage systems, renovations to the press box and restroom building, soil and erosion control measures, new fencing, and construction of a new PE batting building. The contractor must provide all materials and labor necessary to complete the project in accordance with the Contract Documents and coordinate closely with the City on the scheduling and phasing of work. While the contractor is responsible for site preparation and infrastructure, the artificial turf system—including the turf, infill, stone base, nailers, and field drainage—will be supplied and installed under a separate contract by another party. All interested bidders are required to attend a mandatory Pre-Proposal Meeting on August 25, 2026, at 10:00 A.M. at the project site, with late arrivals not permitted. Proposals must be submitted in sealed envelopes to the City Finance Department at 300 W. Waugh Street by 10:00 A.M. on September 8, 2026. The City reserves the right to request additional information or conduct interviews with proposers and may shortlist firms prior to award. Short-listed contractors will be notified by the close of business on September 9, 2026, and interviews or presentations will take place on September 14 and 15, 2026. Evaluation will consider qualifications, experience, compliance with requirements, and proposed approach to the work. The solicitation number is PE-75552-NONST-2026-000000067, and all information and documentation related to the bid can be accessed via the provided online link. The point of contact for inquiries is Kenneth Harless, reachable at 706-529-5895 or KHARLESS@KRHARCHITECTS.COM.
City of Dalton

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
MRL Carrollton Phase III Storage
Solicitation # W912P8-26-B-A080
The U.S. Army Corps of Engineers New Orleans District is preparing to issue an Invitation for Bids under solicitation number W912P8-26-B-A080 for the construction of a new pre-engineered metal storage building at the Carrollton Phase III facility in New Orleans, Louisiana. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237990 with an estimated value between one and five million dollars. The work encompasses demolition, site clearance, excavation, backfill, utility relocations, construction of a reinforced concrete foundation and pavement, installation of the metal building, chain-link fencing with a gate, and all related incidental tasks necessary to complete a fully functional facility. The contract will be awarded on a Firm-Fixed-Price basis using commercial procedures, and all bids must be submitted in response to the formal solicitation expected to be posted on the System for Award Management website. Interested contractors must maintain an active SAM registration to be eligible for award, as paper copies of the solicitation will not be distributed and all documents, including amendments, will be available exclusively online through SAM. The solicitation is anticipated to be posted on or about the published date, with proposals due by September 21, 2026. Offerors are required to monitor the SAM website regularly for updates and changes. The primary point of contact for questions is Francesca DeBoer of the New Orleans District, with Christopher Nuccio listed as a secondary contact. No technical or contractual inquiries will be accepted or answered prior to the official issuance of the solicitation, and all information contained in this synopsis is subject to change.
W07V Endist New Orleans

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA
Solicitation # N4008526B0008
This solicitation, designated N4008526B0008, seeks qualified contractors for a Design-Bid-Build dredging project at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia, encompassing the Fuel Pier, Anzio Beach Sandbar, and Utah Beach Sandbar. The work includes dredging sediment using a standard clamshell bucket, transporting material via scow or barge, and depositing it in a near-shore area, as well as constructing Berm Areas #8, #9, and #10 through hydraulic unloading, dewatering, grading, debris and vegetation removal, offsite disposal, and vegetation planting for stabilization. The project is estimated to range between $10 million and $25 million in value and requires contractors to demonstrate experience completing dredging projects with a production rate of at least 2,500 cubic yards per day and handling approximately 200,000 cubic yards of sediment using conventional equipment. Offerors must submit detailed project data for three to five completed, similar projects within the last five years, with all experience limited to their own direct performance; subcontractor experience is not accepted except under specific exceptions. The procurement follows FAR Part 14 sealed bidding procedures and is unrestricted for full and open competition, though if subsequently set aside for small businesses, the contract will include the limitation on subcontracting clause requiring the small business to perform at least 15 percent of the contract cost using its own employees. All respondents must be registered in SAM, provide their UEI and CAGE code, confirm small business status if applicable, and submit bonding capacity information including surety name and maximum per-project and aggregate bonding limits. Proposals must be submitted electronically as a single PDF under 4MB to Angela Clifton at the designated Navy email address by the deadline of September 1, 2026 at 6:00 p.m. Eastern Time, with only registered contractors receiving notifications of amendments.
Navfacsyscom Mid-Atlantic

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237990
New
SLED
Fay Creek Culvert Debris RemovalIn early 2023, a severe storm caused the failure of a 15-foot-diameter culvert beneath Salmon Creek Road, leading to the collapse of the roadway and the deposition of debris—including the damaged culvert, concrete, asphalt, and woody material—into Fay Creek. This obstruction disrupted surface-water flow and blocked critical fish passage. Sonoma County responded by installing a temporary one-lane Bailey bridge to maintain road access, but the debris remains in the creek, impairing aquatic connectivity. To address this, Sonoma County plans to remove approximately 50 feet of the failed culvert and all associated debris from a 50- by 100-foot section of the creek, potentially including an unstable concrete abutment from a prior bridge structure. The removal effort will occur during the dry season using hand tools and heavy equipment staged on Salmon Creek Road, with a temporary access route constructed adjacent to the Bailey bridge to allow an excavator to reach the work zone without entering the wetted channel. No trees will be removed, and minimal vegetation will be cleared only as absolutely necessary for safe operations. The California Department of Fish and Wildlife will coordinate dewatering and fish relocation to protect aquatic life. After debris removal, the site will be graded to match surrounding topography and stabilized with native seed, biodegradable erosion-control fabric, and fiber rolls. All removed materials will be hauled off-site for recycling or proper disposal, and strict erosion and spill prevention controls will be enforced throughout the work to ensure environmental protection and full restoration of natural stream function and aquatic passage.
Sonoma County

POSTED

about 14 hours ago

DEADLINE

N/A
View Details