Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

E-Group PS Solar Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The E-Group PS Solar Project is a large-scale renewable energy development located in Twentynine Palms, California, encompassing approximately 477 acres. The project involves the entitlement, construction, and operation of a 50 MW photovoltaic solar facility situated on an 184-acre portion of the site. The technical scope includes the installation of roughly 160,000 solar panels mounted on 720 ground-mounted racks, supported by 170 inverters and an on-site transformer. The facility will connect to the Southern California Edison Carodean Substation via a dedicated generation interconnection line. To facilitate this development, the project requires several regulatory actions, including two General Plan Amendments to establish a new Renewable Energy land use district and re-designate 60 acres for single-family residential use, two Rezones, a Development Code Amendment to establish development standards, a Conditional Use Permit for the solar construction, and a Development Agreement to address community benefit responsibilities. Environmental and technical studies conducted for the project address a wide range of regulatory and ecological considerations. Hydrological and geotechnical assessments have evaluated flood hazards, drainage patterns, and subsurface conditions to ensure site stability and compliance with the California Building Code. Biological and habitat management plans are in place to mitigate impacts on special-status species, including desert tortoises and burrowing owls, through relocation and native vegetation restoration across approximately 140 acres. Additionally, the project includes comprehensive plans for air quality, greenhouse gas emissions, glare analysis, cultural resource management, and stormwater pollution prevention. The proposed construction schedule is slated to begin with land clearing in early 2027, with major building construction phases continuing through mid-2029.

General Info

50 MW solar facility development in Twentynine Palms, California, starting construction in 2027.

Agency

California → City of Twentynine Palms

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

North of Two MileRoad and west of Noel Knolls Road, Twentynine Palms, CA, 92277

Set-Aside

NONE

Documents

(20)

Hydrology and Hydraulic Technical Study for E-Group PS Solar Project January 2025

PDFtechnical-study

Habitat Restoration Plan for E-Group PS Solar Project January 2025

PDFsow

Appendix D Biological Resources Technical Report E-Group PS Solar Project April 2025

PDFtechnical-report

Appendix J - General Plan and Zoning Text Amendment

PDFgeneral-plan-amendment

Preliminary Drainage Study E-Group PS Solar Project January 2025

PDFstudy

Appendix D.5 Desert Tortoise Survey Letter Report for E-Group PS Solar Project

PDFreport

2024021042_CDFW Comment on E-Group PS Solar Project DEIR

PDFcomment

Twentynine Palms Solar Project Notice of Completion

PDFnotice-of-completion

Appendix E - Cultural Resources Inventory and Evaluation Report for E-Group PS Solar Project

PDFcultural-resources-report

Phase I Environmental Site Assessment Report for Vacant Land Parcel 0612-201-05

PDFphase-i-esa-report

Appendix A - Notice of Preparation and Environmental Initial Study for E-Group PS Solar Project

PDFnotice-of-preparation

Appendix F - Preliminary Geotechnical Engineering Report for Proposed Solar Farm

PDFgeotechnical-report

Appendix D Burrowing Owl Relocation Plan E-Group PS Solar Project Jan 2025

PDFsow

Appendix C - Air Quality and Greenhouse Gas Report for E-Group PS Solar Project

PDFenvironmental-report

Twentynine Palms Solar Project SCH Summary Form

PDFenvironmental-summary

Appendix B - Glare Analysis Report for E-Group PS Solar Project

PDFglare-analysis-report

29 Palms Solar Project Draft Environmental Impact Report NOA

PDFspecial-notice

Appendix I - Storm Water Pollution Prevention Plan for E-Group PS Solar Project

PDFsow

29 Palms Solar Project Draft Environmental Impact Report

PDFenvironmental-impact-report

Aquatic Resources Delineation Report E-Group PS Solar Project January 2025

PDFreport

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Twentynine Palms
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Twentynine Palms
Office AddressN/A
Contacts
Keith GardnerCommunity Development Director
Nicole Sauviat CristeConsultant

Interested Companies (1)

Show more
Terra Nova Planning & Research
Palm Desert, CA

Full Description

Show more
The Project as a whole encompasses 477± acres, and will include two General Plan Amendments (GPA), two Rezones (REZ), a Development Code Amendment (DCA), a Conditional Use Permit (CUP), and a Development Agreement. The GPAs include 1) General Plan text and map amendments to add a new Renewable Energy land use district, and apply it to the northern 241 acres of the Project site on the Land Use Map, and 2) a General Plan map amendment to re-designate 60 acres of the southern 236 acres of the Project site from Rural Living (RL-5) to Single-Family Residential, 1 acre minimum (RS-1). The REZs include 1) adding a new Renewable Energy district, which also requires a DCA to create development standards and permitted uses, and applying it to the northern 241 acres of the Project site on the Zoning Map, and 2) a Zoning Map amendment to re-designate 60 acres of the southern 236 acres of the Project site from RL-5 to RS-1. The Conditional Use Permit is to allow the solar project to be constructed on the northern portion of the site. The Development Agreement is to address community benefit responsibilities of the applicant.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS