Picacho New Water Tank

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Picacho New Water Tank project, managed by the California Department of Parks and Recreation's Ocotillo Wells District, involves the replacement of an aging water tank at Picacho SRA in Imperial County. To prevent previous erosion issues, the new 30,000-gallon tank, measuring approximately 24 feet wide, 17 feet long, and 12 feet tall, will be installed in a disturbed area near the park's fuel tank and storage yard. The scope of work includes performing a geotechnical survey with up to ten bores, which may necessitate the installation of a concrete pad under the new tank. Additionally, the project requires the construction of a 350-foot long trench to connect the new tank to the existing water inlet, the installation of a perimeter fence, and the decommissioning and staging of the old tank for eventual disposal. This project has been declared categorically exempt under CEQA Guidelines Class 3 and Class 11 for the new construction of small and accessory structures. The work must adhere to District standard project requirements. While specific contract pricing and solicitation numbers are not provided in the current documentation, the project is overseen by Senior Environmental Scientist Sara Lockett. The primary objective is to ensure reliable water storage through modern infrastructure while mitigating environmental concerns related to soil erosion and site stability.

General Info

Replace Picacho SRA water tank with 30,000-gallon unit, including trenching and geotechnical surveys.

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Picacho New Water Tank Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Sara LockettSenior Environmental Scientist

Full Description

Show more
The current water tank at Picacho SRA has reached the end of its service life. A replacement tank is proposed in a new location to avoid erosion issues that occurred near the old tank. A 30,000-thousand-gallon tan tank, approximately 24’ wide by 17’ long by 12’ tall, will be placed in a disturbed area near the park’s fuel tank and storage yard. A new 350-foot long trench will be made to connect the new tank to the existing water inlet, then backfilled once connected. Prior to placement a geotechnical survey will be performed; up to ten bores will be made during the survey. Depending on the results of the geotechnical report, a concrete pad may be installed under the location of the new tank. A fence will be installed around the water tank. The old water tank will be decommissioned in place and staged in a storage yard prior to disposal. District standard project requirements have been incorporated into the project description.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS