Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Happy Valley Boulder Barrier Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Oswit Land Trust is proposing to construct a 2,800-foot boulder barrier along the perimeter of its Happy Valley property in Indio Hills, California, to deter unauthorized off-road vehicle use and preserve the natural environment of the site, which includes APNs 750-130-006 and 750-130-008 on Dillon Road. Alongside the barrier, informational and regulatory signage will be installed to educate the public on property rules and local habitat conservation efforts. The project is administered by the Coachella Valley Mountains Conservancy, with Diana Rosas serving as the primary point of contact. The initiative is classified under a Class 4 categorical exemption under CEQA Section 15304, indicating it involves minor land alterations with no significant environmental impact and is therefore exempt from formal environmental review. The Notice of Exemption was signed on November 21, 2025, and must be filed with both the California Office of Planning and Research and the Riverside County Clerk’s office. There is no defined contract value, pricing structure, or detailed cost breakdown provided, and no federal acquisition regulations or standard contract clauses are applicable, as the project does not fall under federal procurement rules. The place of performance is clearly limited to the Happy Valley property, and submissions for related documentation must be mailed in hard copy by the November 21, 2025 deadline, with no electronic submission options specified. No packaging, preservation, labeling, or transportation requirements are outlined, nor are there any specifications for materials, installation standards, inspection criteria, or quality assurance measures. No key personnel, security clearances, contract options, or conflict of interest provisions are required, and the acquisition is not subject to small business set-asides or socioeconomic considerations. The lead agency remains responsible for ensuring compliance with CEQA exemption requirements, but no formal contracting officer, technical representative, or payment office details are provided.

General Info

Oswit Land Trust builds 2,800-foot boulder barrier in Indio Hills to deter off-road vehicles and preserve habitat under CEQA Class 4 exemption.

Agency

California → Coachella Valley Mountains Conservancy

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Indio Hills, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Happy Valley Boulder Barrier Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Mountains Conservancy
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Mountains Conservancy
Office AddressN/A
Contacts
Diana RosasAssociate Director

Full Description

Show more
The Oswit Land Trust (OLT) proposes to establish a boulder barrier for approximately 2,800 feet along the perimeter of OLT’s Happy Valley property (APN 750-130-006 and 750-130-008) on Dillon Road to prevent unauthorized off-road vehicle access and protect the natural state of the site. In addition to the barrier, signage would be installed to communicate property rules and provide information on habitat preservation efforts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details