Entrada Way Culvert Slip-out Bank Stabilization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Entrada Way Culvert Slip-out Bank Stabilization Project is a locally administered infrastructure initiative by the San Mateo County Department of Public Works to address critical bank erosion along the left bank of La Honda Creek upstream of Entrada Way in the unincorporated community of La Honda, California. The project employs a biotechnical approach combining engineered log structures (cribwalls) along the lower bank with vegetated soil lifts on the upper slopes to stabilize the failing bank, which threatens the Entrada Way roadway, stormwater infrastructure, and overhead utility poles. To further mitigate erosion and restore natural channel dynamics, the creek’s thalweg will be repositioned to its pre-erosion alignment near the center of the channel, aligned with the culvert, while the existing culvert headwall will be extended approximately 22 linear feet toward the left bank. Additional work includes realigning an associated storm drain pipe to discharge downstream of Entrada Way and undertaking minor roadway improvements. The project was approved through a Final Initial Study/Mitigated Negative Declaration under CEQA, with environmental mitigation measures tied to specific identifiers such as P-43-000562 and CA-SCL-000567, though no formal federal contract clauses, acquisition regulations, or pricing details are included in the documentation. Construction is scheduled to begin on June 1, 2026, with all work performed on-site at the specified location near Highway 84 and APN 083-051-110. No formal contract value, solicitation number, or procurement structure has been established, as the documentation reflects an environmental compliance and project approval record rather than a federally governed acquisition. There is no specified contract type, payment office details, or invoicing methodology, and financial transactions tied to the project are limited to environmental review fees totaling $3,093.75 processed via county check. The County of San Mateo retains oversight through its Natural Resource Manager, Julie Casagrande, with public comments and submittals directed to the Department of Public Works in Redwood City. While site-specific mitigation and cultural resource assessments are referenced, no federal procurement requirements such as FAR clauses, COR/COTR assignments, offeror certifications, or evaluation factors for award are applicable or present. Inspection and acceptance protocols are governed by CEQA guidelines and National Historic Preservation Act standards, with compliance monitored at the project site and formally reviewed through the County’s administrative offices. The project relies on local

General Info

San Mateo County stabilizes La Honda Creek bank near Entrada Way with log cribwall, vegetated lifts, and culvert extension starting June 1, 2026.

Agency

California San Mateo County Department of Public Works

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Entrada Way near Highway 84/La Honda Road and Entrada Way, CA, 94020

Set-Aside

NONE

Documents

(9)

CDFW Comment on Entrada Way Culvert Slip-out Bank Stabilization Project MND

PDFcomment

Entrada Way Culvert Slip-out Bank Stabilization Project Summary Form

PDFenvironmental-summary

Caltrans Comment Letter on Entrada Way Culvert Slip-Out Project Draft IS/MND

PDFcomment-letter

Entrada Way Culvert Slip-out Bank Stabilization Project IS/MND December 2025

PDFinitial-study-mitigated-negative-declaration

Entrada Way Culvert Slip-out Bank Stabilization Project Notice of Completion

PDFnotice-of-completion

Supplemental Information for NOC form - Entrada Way Culvert Slip-Out Bank Stabilization Project

PDFother

Entrada Way Culvert Slip-Out Bank Stabilization Project IS/MND Notice

PDFpresolicitation

Entrada Way Culvert Slip-out Bank Stabilization Project Notice of Determination 2026

PDFnotice-of-determination

Entrada Way Culvert Slip-Out Embankment Project Air Quality and Emissions Appendix

PDFappendix

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia San Mateo County Department of Public Works
Contacts2 people available
OfficeN/A
Organization / Agency
California San Mateo County Department of Public Works
Office AddressN/A
Contacts
Julie CasagrandeNatural Resource Manager
Zachary CornejoAssociate Planner

Interested Companies (1)

Show more
Montrose Environmental
Oakland, CA

Full Description

Show more
The County of San Mateo Department of Public Works (County) has prepared this Initial Study/Mitigated Negative Declaration (IS/MND) to provide the public, responsible agencies, and trustee agencies with information about the potential environmental effects of the proposed Entrada Way Culvert Slip-out Bank Stabilization Project (Project or Proposed Project). The Proposed Project involves a biotechnical approach to stabilize and repair the left bank of La Honda Creek directly upstream (north) from Entrada Way in the unincorporated community of La Honda in San Mateo County, California. The bank failure threatens existing infrastructure, including stormwater infrastructure, the Entrada Way roadway, and overhead utility poles located at the top of the bank. The Proposed Project includes construction of an engineered log structure (cribwall) along the lower bank with vegetated soil lifts (VSLs) on the upper slopes above the cribwall. The existing culvert headwall parallel to the roadway would be extended approximately 22 linear feet (LF) toward the left bank. The Proposed Project also includes repositioning the creek thalweg to its original pre-erosional alignment away from the left bank and closer to the center of the channel in line with the culvert. Other Project activities include realignment of an associated storm drain pipe to discharge downstream of Entrada Way and minor roadway improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details