Entrada Way Culvert Slip-out Bank Stabilization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Entrada Way Culvert Slip-out Bank Stabilization Project is a biotechnical infrastructure effort led by the San Mateo County Department of Public Works to repair progressive bank failure along the left bank of La Honda Creek. The project scope includes the removal of boulders from a 2017 emergency action and the construction of an engineered log cribwall and vegetated soil lifts to stabilize the bank. Key technical deliverables involve extending the existing culvert headwall by approximately 22 linear feet, realigning the creek thalweg to its original position, installing a new HDPE pipe for stormwater drainage, and performing site revegetation. The work area covers approximately 2.0 acres near the intersection of SR-84/La Honda Road and Entrada Way. The project is governed by several regulatory requirements, including the California Environmental Quality Act and the California Fish and Game Code. A Mitigated Negative Declaration has been filed, confirming that the project will not have a significant environmental effect provided that specific mitigation measures are implemented. These measures include strict concrete management protocols to protect the wetted channel, the relocation of aquatic wildlife prior to dewatering, and adherence to ADA standards for any impacted Caltrans facilities. Coordination with the California Department of Fish and Wildlife and Caltrans is required for permits related to lake and streambed alterations, transportation encroachments, and the maintenance of pedestrian and bicycle access during construction.

General Info

San Mateo County project to stabilize La Honda Creek bank using biotechnical infrastructure.

Agency

California San Mateo County Department of Public Works

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(10)

CDFW Comment on Entrada Way Culvert Slip-out Bank Stabilization Project MND

PDFcomment

Entrada Way Culvert Slip-out Bank Stabilization Project Summary Form

PDFenvironmental-summary

Caltrans Comment Letter on Entrada Way Culvert Slip-Out Project Draft IS/MND

PDFcomment-letter

Entrada Way Culvert Slip-out Bank Stabilization Project IS/MND December 2025

PDFinitial-study-mitigated-negative-declaration

Entrada Way Culvert Slip-out Bank Stabilization Project Notice of Completion

PDFnotice-of-completion

Supplemental Information for NOC form - Entrada Way Culvert Slip-Out Bank Stabilization Project

PDFother

Entrada Way Culvert Slip-Out Bank Stabilization Project IS/MND Notice

PDFpresolicitation

Entrada Way Culvert Slip-out Bank Stabilization Project Notice of Determination 2026

PDFnotice-of-determination

EPIMS-SMO-61382-R3 Notice of Determination

PDF2 pagesspecial-notice

Entrada Way Culvert Slip-Out Embankment Project Air Quality and Emissions Appendix

PDFappendix

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia San Mateo County Department of Public Works
Contacts2 people available
OfficeN/A
Organization / Agency
California San Mateo County Department of Public Works
Office AddressN/A
Contacts
Shannon HusbandEnvironmental Scientist
Julie CasagrandeLead Agency Contact

Interested Companies (1)

Show more
Montrose Environmental
Oakland, CA

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SMO-61382-R3), pursuant to Fish and Game Code section 1602, the project Applicant, San Mateo County Department of Public Works. The project involves stabilizing a road slip out on the left bank of La Honda Creek directly upstream from Entrada Way, including removal of rock boulders placed during an emergency action in 2017 and construction of an engineered log cribwall structure along the lower bank with vegetated soil lifts on the upper slopes above the cribwall. The existing culvert concrete headwall parallel to the Entrada Way roadway will be extended approximately 22 linear feet toward the left bank. The creek thalweg will be repositioned to be in line with the existing culvert. At the downstream end of the culvert, a new stormwater drainage feature will be installed, with a HDPE pipe conveying road runoff flows to the stream.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS