Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

1160 Hacienda Drive Townhome Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Vista

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Hacienda Drive, Pomelo Drive, Vista, CA, 92081

Set-Aside

NONE

Documents

(5)

1160 Hacienda Drive Townhome Project CEQA Summary Form

PDFenvironmental-summary

1160 Hacienda Drive Townhome Project Notice of Completion

PDFnotice-of-completion

1160 Hacienda Drive Townhome Project Draft Initial Study and Mitigated Negative Declaration

PDFismnd

Caltrans Comment Letter on 1160 Hacienda Drive Townhome Project MND

PDFcomment-letter

Notice of Intent to Adopt Mitigated Negative Declaration for 1160 Hacienda Drive Townhome Project

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vista
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Vista
Office AddressN/A
Contacts
Chris WintersSenior Planner
Jason RunyanSenior Environmental Project Manager

Interested Companies (1)

Show more
HELIX Environmental Planning
La Mesa, CA

Full Description

Show more
The project consists of 63 multi-family residential units in seven buildings. The units would range from 1,323 SF to 1,731 SF. The total project building area would be 136,191 SF. The unit mix would be comprised of 6 two-bedroom units, 32 three-bedroom units, and 25 four-bedroom units. Each unit would be constructed in a townhome style and include private outdoor space in the form of either a deck or a porch which would range from 71 SF to 132 SF. The project would provide private patio areas, a common seating area, common social area, and a lookout point with benches. The common social area would include an event lawn, picnic tables, and barbecue. Access to the project would be provided via one driveway located on Hacienda Drive approximately 550 feet west of the intersection of Pomelo Drive and Hacienda Drive, which would connect to a drive aisle located along the perimeter of the site and between the residential buildings. Resident parking would be provided via two-car garages attached to the townhomes and guest parking would be provided by surface parking along the drive aisle on the eastern edge of the site. The two-car garages would account for 126 parking spaces and would be pre-wired for electric vehicle charging, while the surface parking area would account for 13 parking spaces and would include one Americans with Disabilities Act (ADA) space. The project would include a riparian buffer adjacent to Buena Vista Creek which would reduce the buildable area of the project site from 4.6 acres to 4.0 acres. The project would include various hydromodification and pollutant control best management practices (BMPs) including a modular wetland system located in the eastern portion of the site near Buena Vista Creek, and a biofiltration basin and underground detention system in the northern portion of the site adjacent to Hacienda Drive. The project would include improvements within Hacienda Drive. These include connections to existing storm drains and sewer manholes, relocations of storm drain inlets and resurfacing of the roadway. Along the north side of Hacienda Drive, improvements would include a new six-inch curb, gutter, and sidewalk extension. Project construction activities would consist of site preparation, grading, installation of underground utilities, physical building construction, paving, and architectural coatings. Construction of the project is expected to take approximately 21 months. Site preparation would require the removal of approximately 12 truckloads of debris/vegetation. A net export of approximately 27,000 cubic yards of soil is anticipated during grading.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details