Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Milligan Parking Lot Project, specifically the Madera Residential Project Update 4 under solicitation SP20-019, is a Special Use Permit Amendment approved by the City of San Jose on December 3, 2025. The amendment modifies the project by changing the exterior material from fiber cement board to stucco on levels above the pedestrian level and extending Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 to reduce the project timeline by up to 90 days. These changes are consistent with the Downtown Strategy 2040 Final Environmental Impact Report and the Envision San Jose 2040 General Plan, with a Notice of Determination confirming that no new significant environmental impacts were identified. The broader development at 255 West Julian Street involves a mixed-use project featuring residential units and retail space. The construction schedule is estimated to span approximately 32 months, starting in early January 2026 and concluding in August 2028, covering phases from demolition and excavation to superstructure and final sitework. Key compliance requirements include adherence to the City's 2030 Greenhouse Gas Reduction Strategy, BAAQMD air quality thresholds, and ADA-compliant curb ramp reconstruction. Additionally, as a Level 2 project, it must submit annual Transportation Demand Management compliance forms and fees to the City Department of Transportation.

General Info

San Jose approved material changes and extended Saturday hours for Milligan Parking Lot Project.

Agency

California → City of San Jose

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Jose, CA

Set-Aside

NONE

Documents

(11)

Appendix D - Local Transportation Analysis and Transportation Demand Management Plan

PDFlocal-transportation-analysis

Arbor Mixed-Use Project Air Quality Assessment April 2025

PDFair-quality-assessment

Addendum SPA17-009-01 to San José Downtown Strategy 2000 and Envision San José 2040 EIRs

PDFaddendum

H24-049 SCC Environmental Filing Receipt and Notice of Determination

PDFenvironmental-filing-receipt

SPA20-019-04 NOD SCC Filing Receipt for The Madera Residential Project Update #4

PDFnotice-of-determination

Appendix B - 2030 GHGRS Compliance Checklist

PDFcompliance-checklist

SPA20-019-04 Notice of Determination for Madera Residential Project Update 4

PDFnotice-of-determination

Arbor Project Environmental Noise and Vibration Assessment March 2025

PDFenvironmental-assessment

H24-049 Notice of Determination for 255 West Julian Street Project

PDFdetermination-and-findings

H24-049 Addendum to San Jose Downtown Strategy 2040 FEIR

PDFaddendum

SP20-019-04 Extended Construction Hours Noise Analysis

PDFconstruction-noise-analysis

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jose
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Jose
Office AddressN/A
Contacts
Matt BernardisSenior Project Manager

Full Description

Show more
Special Use Permit Amendment to change the material of the exterior fiber cement board to stucco on the levels above the pedestrian level and to allow Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 (referred here as Modified Project). All other project details as previously approved in Planning File No. SP20-019, and subsequent amendments would remain unchanged.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS