Milligan Parking Lot Project

Forecast
SP20-019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Milligan Parking Lot Project, specifically the Madera Residential Project Update 4 under solicitation SP20-019, is a Special Use Permit Amendment approved by the City of San Jose on December 3, 2025. The amendment modifies the project by changing the exterior material from fiber cement board to stucco on levels above the pedestrian level and extending Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 to reduce the project timeline by up to 90 days. These changes are consistent with the Downtown Strategy 2040 Final Environmental Impact Report and the Envision San Jose 2040 General Plan, with a Notice of Determination confirming that no new significant environmental impacts were identified. The broader development at 255 West Julian Street involves a mixed-use project featuring residential units and retail space. The construction schedule is estimated to span approximately 32 months, starting in early January 2026 and concluding in August 2028, covering phases from demolition and excavation to superstructure and final sitework. Key compliance requirements include adherence to the City's 2030 Greenhouse Gas Reduction Strategy, BAAQMD air quality thresholds, and ADA-compliant curb ramp reconstruction. Additionally, as a Level 2 project, it must submit annual Transportation Demand Management compliance forms and fees to the City Department of Transportation.

General Info

San Jose approved material changes and extended Saturday hours for Milligan Parking Lot Project.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jose
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of San Jose
Office AddressN/A
Contacts
Matt BernardisSenior Project Manager

Full Description

Show more
Special Use Permit Amendment to change the material of the exterior fiber cement board to stucco on the levels above the pedestrian level and to allow Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 (referred here as Modified Project). All other project details as previously approved in Planning File No. SP20-019, and subsequent amendments would remain unchanged.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
W072 Endist Pittsburgh

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → City of San Jose

Same awarding agency

NAICS: 541620
SLED
Glider Residential Project
Solicitation # H23- 028, T23- 022 and ER23- 230
True Life Companies, LLC proposes the Glider Residential Project in San Jose, California, which involves the demolition of an existing school at 511 Cozy Drive to develop 80 residential units on a 9.51-acre site. The development will consist of 64 single-family detached homes and 16 single-family attached homes, with 11 units deed-restricted for lower-income households. The project includes the creation of a 0.68-acre public park featuring shade trees, picnic tables, and benches, along with 2.09 acres of public right-of-way. The City of San Jose serves as the lead agency, and the project has undergone a comprehensive environmental review process under the California Environmental Quality Act, including a Final Environmental Impact Report that identified significant unavoidable impacts regarding greenhouse gas emissions and transportation. The project performance period is scheduled from June 1, 2026, to November 17, 2028, beginning with demolition in June 2026 and concluding with architectural coating in November 2028. Technical assessments have been completed covering air quality, biological resources, cultural resources, geology, hydrology, and noise. A Phase I Environmental Site Assessment was conducted by Cornerstone Earth Group, Inc. to identify recognized environmental conditions. While the City Council approved the project on September 15, 2026, the development must adhere to specific mitigation measures and regulatory standards, including California Code of Regulations Title 22 for hazardous waste labeling and various ASTM standards for environmental site assessments.
Environmental Consulting Services

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1207 North Capitol Avenue Residential Project
Solicitation # 2025090597
The 1207 North Capitol Avenue Residential Project, solicitation number 2025090597, involves the demolition of a 3,680 square foot single-family residence to construct a five-story, 128-unit affordable housing development in San Jose, California. The project features a U-shaped building with a maximum height of 53 feet and two inches, consisting of low-income units and one market-rate manager's unit. Ground floor amenities include two lobbies, a fitness room, yoga studio, game room, community kitchen, offices, bike storage, and a package room. The site will include a courtyard with a 52-space surface parking lot, solar panels on the roof, and a new 24-foot wide right-in, right-out driveway on North Capitol Avenue. The project has undergone extensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration approved by the City of San Jose on December 15, 2025. Key environmental assessments identified lead contamination in shallow soil and potential chlorinated solvent impacts from off-site sources, requiring specific excavation and waste disposal protocols. Mitigation measures include Tier 4 engine requirements for construction emissions, protections for nesting birds, and adherence to Cal/OSHA and NESHAP standards for the removal of asbestos and lead-based paint. Transportation analysis confirms the project meets VMT and TDM screening criteria, though it requires a fair-share contribution toward safety corridor improvements on North Capitol Avenue.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS