Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Evergreen Water Production Well Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

E Capitol Expressway, Moss Hollow Drive, S Evergreen Loop, San Jose, CA, 95122

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jose
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of San Jose
Office AddressN/A
Contacts

Interested Companies (1)

Environmental Science AssociatesTampa, Florida

Full Description

Show more
The Project proposes construction of a new municipal groundwater production well and associated infrastructure to provide a supplemental and backup potable water supply for the City of San José’s Evergreen Service Area. The Project would be located on a City-owned, primarily undeveloped parcel along Capitol Expressway in San José and would include installation of a groundwater well with a pumping capacity of approximately 1,800 to 2,000 gallons per minute (gpm) and a maximum depth of 800 feet. Associated facilities would include aboveground electrical and control equipment, valves, piping, a secure fenced enclosure, and approximately 175 linear feet of water pipeline to connect the well to the existing potable water distribution system, as well as stormwater connections and related appurtenances. The Project would add approximately 0.15 acre of impervious surface and require removal of two trees. Construction would occur over approximately 26 months and include site preparation, drilling, well installation and testing, utility connections, and construction of ancillary facilities, with temporary 24-hour operations required during portions of drilling and well installation. Once operational, the well would provide supplemental water supplies during periods of peak demand, drought, maintenance activities, or interruptions in wholesale water deliveries. Routine operation and maintenance would be conducted by existing City staff, and all construction and operation activities would comply with applicable federal, state, and local environmental regulations.

More opportunities from California → City of San Jose

Same awarding agency

NAICS: 541620
SLED
Glider Residential Project
Solicitation # H23- 028, T23- 022 and ER23- 230
True Life Companies, LLC proposes the Glider Residential Project in San Jose, California, which involves the demolition of an existing school at 511 Cozy Drive to develop 80 residential units on a 9.51-acre site. The development will consist of 64 single-family detached homes and 16 single-family attached homes, with 11 units deed-restricted for lower-income households. The project includes the creation of a 0.68-acre public park featuring shade trees, picnic tables, and benches, along with 2.09 acres of public right-of-way. The City of San Jose serves as the lead agency, and the project has undergone a comprehensive environmental review process under the California Environmental Quality Act, including a Final Environmental Impact Report that identified significant unavoidable impacts regarding greenhouse gas emissions and transportation. The project performance period is scheduled from June 1, 2026, to November 17, 2028, beginning with demolition in June 2026 and concluding with architectural coating in November 2028. Technical assessments have been completed covering air quality, biological resources, cultural resources, geology, hydrology, and noise. A Phase I Environmental Site Assessment was conducted by Cornerstone Earth Group, Inc. to identify recognized environmental conditions. While the City Council approved the project on September 15, 2026, the development must adhere to specific mitigation measures and regulatory standards, including California Code of Regulations Title 22 for hazardous waste labeling and various ASTM standards for environmental site assessments.
Environmental Consulting Services

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1207 North Capitol Avenue Residential Project
Solicitation # 2025090597
The 1207 North Capitol Avenue Residential Project, solicitation number 2025090597, involves the demolition of a 3,680 square foot single-family residence to construct a five-story, 128-unit affordable housing development in San Jose, California. The project features a U-shaped building with a maximum height of 53 feet and two inches, consisting of low-income units and one market-rate manager's unit. Ground floor amenities include two lobbies, a fitness room, yoga studio, game room, community kitchen, offices, bike storage, and a package room. The site will include a courtyard with a 52-space surface parking lot, solar panels on the roof, and a new 24-foot wide right-in, right-out driveway on North Capitol Avenue. The project has undergone extensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration approved by the City of San Jose on December 15, 2025. Key environmental assessments identified lead contamination in shallow soil and potential chlorinated solvent impacts from off-site sources, requiring specific excavation and waste disposal protocols. Mitigation measures include Tier 4 engine requirements for construction emissions, protections for nesting birds, and adherence to Cal/OSHA and NESHAP standards for the removal of asbestos and lead-based paint. Transportation analysis confirms the project meets VMT and TDM screening criteria, though it requires a fair-share contribution toward safety corridor improvements on North Capitol Avenue.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Milligan Parking Lot Project
Solicitation # SP20-019
The Milligan Parking Lot Project, specifically the Madera Residential Project Update 4 under solicitation SP20-019, is a Special Use Permit Amendment approved by the City of San Jose on December 3, 2025. The amendment modifies the project by changing the exterior material from fiber cement board to stucco on levels above the pedestrian level and extending Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 to reduce the project timeline by up to 90 days. These changes are consistent with the Downtown Strategy 2040 Final Environmental Impact Report and the Envision San Jose 2040 General Plan, with a Notice of Determination confirming that no new significant environmental impacts were identified. The broader development at 255 West Julian Street involves a mixed-use project featuring residential units and retail space. The construction schedule is estimated to span approximately 32 months, starting in early January 2026 and concluding in August 2028, covering phases from demolition and excavation to superstructure and final sitework. Key compliance requirements include adherence to the City's 2030 Greenhouse Gas Reduction Strategy, BAAQMD air quality thresholds, and ADA-compliant curb ramp reconstruction. Additionally, as a Level 2 project, it must submit annual Transportation Demand Management compliance forms and fees to the City Department of Transportation.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS