Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project, managed by the Metropolitan Water District of Southern California, involves the permanent engineering reinforcement of critical water infrastructure in Riverside County. The project focuses on protecting pipelines from flotation, exposure, erosion, and seismic activity within the San Jacinto River. Specifically, the scope includes the concrete encasement of approximately 320 feet of the CRA Casa Loma Siphon No. 1 Pipeline and 295 feet of the San Jacinto Pipeline. These encasements will be reinforced with horizontal and vertical steel rebar, with the Siphon No. 1 encasement measuring 16 feet wide by 13 feet deep, and the San Jacinto Pipeline encasement measuring 12.5 feet wide by 10.7 feet deep. The project will not introduce new aboveground components or alter existing operation and maintenance conditions. The project is subject to rigorous environmental compliance and regulatory oversight, as detailed in an Initial Study-Mitigated Negative Declaration. Extensive biological assessments have been conducted to protect special-status species, including the San Bernardino kangaroo rat, Least Bell's Vireo, western burrowing owl, and various rare plants and bat species. The project site, covering approximately 6.7 acres, is located between Soboba Road and State Street. Contractors must adhere to strict standards regarding noise control, hazardous materials storage, and the protection of cultural and paleontological resources. The project was officially approved on April 14, 2026, following a public review period and coordination with agencies such as the US Army Corps of Engineers and the California Department of Fish and Wildlife.

General Info

MWD project reinforcing Casa Loma Siphon and San Jacinto pipelines via concrete encasement.

Place of Performance

Soboba Road and State Street, San Jacinto, CA, 92583

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts1 person available
OfficeN/A

Interested Companies (1)

Rincon ConsultantsVentura, California

Full Description

Show more
The proposed Project includes the encasement of approximately 320 feet of the CRA Casa Loma Siphon No. 1 Pipeline and approximately 295 feet of the San Jacinto Pipeline to protect the pipelines from flotation and exposure. The encasement would consist of concrete poured around the existing pipelines, and both encasements would be reinforced with steel rebar placed both horizontally and vertically to ensure structural integrity. The Project would not result in the addition of new aboveground components or appurtenances. The Project would not result in changes to Metropolitan’s existing operation and maintenance conditions at the Project site.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the US Army Corps of Engineers, Omaha District. The scope of work involves comprehensive upgrades to the fueling system, including upgrading tank Automated Tank Gauging (ATG), repairing dispenser and offload concrete, installing Emergency Fuel Shut-Off (EFSO) systems, and mounting leak detector probes on two diesel aboveground storage tanks. Additional requirements include replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man controls for truck loading, and modifying tank access platforms. The project also requires a comprehensive design signed by a licensed professional structural engineer, field surveys, and geotechnical investigations. This firm fixed-price contract has a period of performance of 410 calendar days, with a final delivery date of June 18, 2027. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on specialized experience, a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined technical approach. The project must adhere to strict quality control standards, including the Three Phases of Control, and comply with Davis-Bacon Act wage determinations and various federal cybersecurity and accessibility guidelines. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The contractor is responsible for providing all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards, and replacing them with new systems. Key deliverables include the installation of new above-ground storage tanks, concrete pads, side-mount dispensers, and the provision of temporary fuel tanks (500-gallon gasoline and 250-gallon diesel) for the duration of the project. All work must adhere to Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, and API standards 650, 620, and 1604. This is a Small Business Reserve Procurement, and the award is limited to certified small businesses. The procurement establishes participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-Owned Small Business Enterprises (VSBE). The contract will be awarded to the responsible bidder who submits the lowest responsive total bid. Required documentation for the bid includes a bid bond, MBE and VSBE utilization affidavits, and a comprehensive list of all anticipated subcontractors. Final project acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, and requires the submission of an approved electrical inspection certificate and a disposal manifest for tanks and contaminated soils.

POSTED

about 13 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237120
New
SLED
27-006 Gas Utility Installer
Solicitation # 27-006
The City of Commerce is seeking a gas utility installer for a one-year contract, with options to renew annually for up to three additional years. The scope of work focuses on the installation of gas mains using directional boring, specifically including 3-inch and 4-inch polyethylene gas mains and 3-inch tap, stop, or bottom out steel tie-ins. This is a solicitation for a SLED organization in Georgia, and there is no specified set-aside status for this opportunity. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet the timeline (5 points). The City reserves the right to select the response that is in its best interest. Payment is processed 30 days after the completion of construction and successful testing of all installed products, subject to available funds. Contractors must provide a bid bond of at least 5% and a performance bond equal to 100% of the construction contract amount upon completion. Required insurance includes general liability covering $1,000,000 per incident and Georgia-mandated workman's compensation. Additionally, the successful vendor must provide operator qualifications, a drug and alcohol testing plan, and submit PHMSA Drug and Alcohol Testing Data to the City on a quarterly basis. Submissions must be delivered in a sealed package by December 21, 2026.
City of Commerce

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
SLED
Restoration Projects Statewide Order Draft Program Environmental Impact Report
Solicitation # 2019100230
The State Water Resources Control Board is managing a series of statewide restoration projects under a Program Environmental Impact Report to enhance aquatic and riparian habitats for anadromous salmonids and native species. A primary focus of these efforts is the Sunset Weir and Pumps Fish Passage Project in Sutter County, which involves removing the existing Sunset Weir from the Feather River to restore fish migration, installing five fish screens at the Sunset Pumps intake, constructing a new wet well, replacing outdated water diversion infrastructure, and stabilizing the left bank with vegetated rock slope protection. Additionally, the project includes filling the downstream scour pool and capping it with spawning grade gravel to create suitable substrate. These initiatives are part of a broader set of restoration activities across California, including projects in Butte, Fresno, Madera, Siskyou, Shasta, Tehama, and Plumas counties. Key deliverables across these sites include the construction of fishways, floodplain excavation, and the creation of side channels and habitat units. All projects are conducted in compliance with the California Environmental Quality Act and the Public Resources Code, with various agencies such as the Wildlife Conservation Board and the Central Valley Flood Protection Board serving as lead or responsible agencies. Performance for specific sites, such as the Arroyo Canal project, includes long-term land use leases extending through 2045.
State Water Resources Control Board

POSTED

2 days ago

DEADLINE

N/A
View Details

More opportunities from Metropolitan Water District of Southern California

Same awarding agency

NAICS: 237990
SLED
Copper Basin Discharge Valve Replacement and Access Road Improvements Project
Solicitation # EPIMS-SBR-42438-R6
The Copper Basin Discharge Valve Replacement and Access Road Improvements Project, identified by agreement number EPIMS-SBR-42438-R6, is an infrastructure rehabilitation effort executed by the Metropolitan Water District of Southern California and approved by the California Department of Fish and Wildlife. The project scope includes the rehabilitation of the slide gate valve and replacement of the discharge valve within the Copper Basin Dam valve house, along with the installation of new conduit, electrical components, and three concrete pads located 250 feet southwest of the dam. Additional structural work involves replacing the dam face ladder, installing a new catwalk and stairs, and reconstructing two concrete weirs approximately 125 feet downstream. To ensure safe access to the dam base, the project also includes the rehabilitation of 1.66 miles of existing dirt access road around the perimeter of the Copper Basin Reservoir. The project is located in San Bernardino County, California, and is subject to strict environmental compliance under Fish and Game Code section 1602 and the California Endangered Species Act. Because the work may result in the incidental take of the fully protected Desert bighorn sheep, the California Department of Fish and Wildlife issued Incidental Take Permit No. 2081(b)-2025-066-06. The project was approved on December 15, 2025, following a Mitigated Negative Declaration which determined that the project would not have significant environmental effects within the jurisdiction of the responsible agency, provided that specific mitigation measures and a Monitoring Plan are implemented.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS