Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project involves encasing approximately 320 feet of the CRA Casa Loma Siphon No. 1 Pipeline and 295 feet of the San Jacinto Pipeline with reinforced concrete to prevent flotation and exposure, with steel rebar installed both horizontally and vertically to ensure structural integrity. The project will not add new aboveground components or alter existing operational and maintenance conditions at the site. Work is scheduled to occur in San Jacinto, California, with a defined performance period from October 1, 2026, to February 15, 2028, broken into phases for vegetation removal, site preparation, excavation, infrastructure installation, and final site restoration. All contractor activities must comply with stringent environmental and regulatory requirements, including the implementation of a site-specific Stormwater Pollution Prevention Plan, adherence to California Air Resources Board emissions standards, use of certified low-emission equipment, and prohibition of non-biodegradable erosion control products. Equipment must be decontaminated and certified clean at project entry and exit points to prevent the spread of invasive species, soil, or vegetative matter, meeting standards aligned with USDA Forest Service guidelines and local air quality regulations. Noise control measures are mandated, requiring the use of mufflered equipment, adherence to local noise thresholds, and obtaining necessary variances. Contractors are also required to enact a rideshare plan for personnel and coordinate with landowners to avoid disruption to domestic animals. All submissions must be provided in two paper copies and one PDF electronic copy, and environmental documentation such as the SWPPP, species occurrence reports, site photographs, and floral compendium are referenced as attachments supporting regulatory compliance. The project is forecasted under the NAICS code 237120 by the Metropolitan Water District of Southern California, with environmental specialist Alfredo Aguirre designated as the point of contact; however, no contract value, pricing structure, payment details, or formal award evaluation factors are specified in the available information.

General Info

Encase 320 ft and 295 ft of pipelines in concrete, comply with environmental regs, work from Oct 2026 to Feb 2028 in San Jacinto.

Agency

Metropolitan Water District of Southern California

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Soboba Road and State Street, San Jacinto, CA, 92583

Set-Aside

NONE

Documents

(14)

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project IS-MND December 2025

PDFinitial-study-mnd

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project Notice of Completion

PDFnotice-of-completion

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project SCH Summary Form

PDFsch-summary-form

Appendix A - Metropolitan Standard Practices Environmental Compliance

PDFspecifications

Appendix I - San Bernardino Kangaroo Rat Trapping Focused Survey Report

PDFsurvey-report

Appendix D - Jurisdictional Delineation Report for Casa Loma Siphon Project

PDFjurisdictional-delineation-report

Appendix B - Casa Loma Siphon Air Quality and Greenhouse Gas Modeling Report

PDFsupporting-document

Appendix G - Least Bell's Vireo Protocol Survey Report for Casa Loma Siphon No. 1 and San Jacinto Pipeline Project

PDFenvironmental-survey-report

Appendix H - Rare Plant Survey Report for Casa Loma Siphon No. 1 and San Jacinto Pipeline Project

PDFreport

Appendix C - Biological Resources Assessment for Casa Loma Siphon No. 1 and San Jacinto Pipeline Project

PDFbiological-resources-assessment

Appendix F - Burrowing Owl Habitat Assessment and Focused Survey Results

PDFenvironmental-assessment-report

Casa Loma Siphon No. 1 and San Jacinto Pipeline Protection Project NOI

PDFnotice-of-intent

Appendix E - Bat Habitat Assessment and Focused Survey Results for Casa Loma Siphon Project

PDFenvironmental-assessment-report

Casa Loma Siphon No. 1 Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts2 people available
OfficeN/A
Organization / Agency
Metropolitan Water District of Southern California
Office AddressN/A
Contacts
Alfredo AguirreEnvironmental Specialist
Nicholas CarterEnvironmental Planner

Interested Companies (1)

Show more
Rincon Consultants
Fresno, CA

Full Description

Show more
The proposed Project includes the encasement of approximately 320 feet of the CRA Casa Loma Siphon No. 1 Pipeline and approximately 295 feet of the San Jacinto Pipeline to protect the pipelines from flotation and exposure. The encasement would consist of concrete poured around the existing pipelines, and both encasements would be reinforced with steel rebar placed both horizontally and vertically to ensure structural integrity. The Project would not result in the addition of new aboveground components or appurtenances. The Project would not result in changes to Metropolitan’s existing operation and maintenance conditions at the Project site.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,
FA3029 71 Ftw Cvc

POSTED

2 days ago

DEADLINE

in 17 days
View Details