Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Restoration Projects Statewide Order Draft Program Environmental Impact Report

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves comprehensive habitat restoration along the Feather River in Live Oak, California, with the primary goal of restoring unimpeded fish migration and enhancing aquatic ecosystems for anadromous salmonids, particularly Chinook salmon. Key activities include removing the existing Sunset Weir to eliminate a barrier to fish passage, installing five modern fish screens at the Sunset Pumps intake to meet current ecological protection standards, constructing a new wet well, replacing outdated water diversion infrastructure, filling a downstream scour pool with spawning-grade gravel to create viable spawning habitat, and stabilizing the left riverbank using vegetated rock slope protection. The work is part of a broader statewide initiative governed by the Statewide Restoration General Order Program Environmental Impact Report, designed to improve spawning, rearing, and migration conditions across Central Valley river systems including the Feather, San Joaquin, and Merced Rivers. All activities are subject to regulatory oversight under the California Environmental Quality Act (CEQA), with approval and acceptance authority resting solely with state agencies including the State Water Resources Control Board, the Central Valley Regional Water Quality Control Board, the California Department of Fish and Wildlife, and the State Lands Commission. The project has been determined to have significant environmental impacts, which are mitigated through approved measures outlined in the Program Environmental Impact Report, including a formal mitigation monitoring plan and a Statement of Overriding Considerations. There is no specified contract value, delivery schedule, or pricing structure, as the documentation reflects an environmental compliance framework rather than a traditional procurement contract. Key agency contacts responsible for administration and oversight include senior scientists and program managers from the State Water Resources Control Board and cooperating entities, with inspections and final acceptance conducted on-site at project locations. No federal acquisition regulations, packaging, marking, or personnel certification requirements apply, as the work is executed under state environmental permitting and not through competitive federal contract award mechanisms.

General Info

Restore Feather River habitat, remove Sunset Weir, install fish screens, create spawning gravel, stabilize bank under state environmental oversight.

Agency

California → State Water Resources Control Board

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(10)

CEQA Notice of Determination for Oroville Wildlife Area River Restoration Project

PDFnotice-of-determination

Notice of Determination for Arroyo Canal Fish Screen and Sack Dam Fish Passage Project

PDFnotice-of-determination

Notice of Determination for Above Henderson Park Habitat Rehabilitation Project A4995

PDFdetermination-and-findings

NOD 19984 Signed

PDF

Notice of Determination for Buffington Tract Salmonid Habitat Restoration Project Permit No. 19899

PDFdetermination-and-findings

PLU-50313-R2 Notice of Determination for Poplar Valley Hydrology Improvement

PDFnotice-of-determination

Notice of Determination for Arroyo Canal Fish Screen and Sack Dam Fish Passage Project

PDFdetermination-and-findings

5a06cr00082 Willow Bend Floodplain Reconnection Project Notice of Determination

PDFnotice-of-determination

5A45CR00684 Lower Battle Creek Side Channel and Backwater Restoration Project CEQA Notice of Determination

PDFceqa-notice-of-determination

Notice of Determination for Sunset Weir and Pumps Fish Passage Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts1 person available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Jessica DykeEnvironmental Scientist

Full Description

Show more
The Project aims to enhance fish passage at the Arroyo Canal and Sack Dam facilities on the San Joaquin River, prevent the entrainment of anadromous fish, and ensure effective fish passage at Sack Dam. The Project includes the following: (1) construction of a fish screen; (2) construction of a new 4,500 cubic feet per second channel around Sack Dam; (3) installation of new structures to control flow releases into the river channel; (4) construction of a fishway to provide salmonid passage; and (5) construction of a new maintenance building. Additionally, the Project will require the replacement of existing Pacific Gas and Electric Company gas and power lines.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,
FA3029 71 Ftw Cvc

POSTED

2 days ago

DEADLINE

in 17 days
View Details