This Award Notice opportunity from California was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Restoration Projects Statewide Order Draft Program Environmental Impact Report

Awarded
2019100230State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build, firm-fixed-price solicitation issued by the US Army Corps of Engineers, Omaha District, for work located in Greenville, Kentucky. The comprehensive scope of work involves upgrading the automatic tank gauge (ATG) systems, repairing dispenser and offload island concrete, and installing emergency fuel shut-off (EFSO) systems and leak detector probes. Additional requirements include providing concrete circulation pavement and splash blocks, replacing canopy and fuel pipe coatings, installing dead man controls for truck loading, and performing various tank maintenance tasks such as replacing vents, repairing grounding for AST stairs, and modifying tank access platforms. All work must adhere to UFC, NFPA, ASTM, and MIL-STD-161H standards, with specific compliance required for ADA and ABA accessibility guidelines. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on relevant experience, a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined construction methodology. Submissions must be divided into a technical volume and a price volume. The project requires a strict quality control system with three phases of control and multiple completion inspections. Performance must commence within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Contractors must comply with the Davis-Bacon Act for labor rates and provide necessary performance and payment bonds.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total small business set-aside. The scope of work involves comprehensive repairs to AVGAS fueling systems, including the installation of sampling gauge hatches, mechanical gauges, and an automatic tank gauge system. Key construction tasks include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additionally, the project requires the demolition and replacement of the POL operation building, relocation of a generator with a new concrete pad, repair of remote containment basin drainage, and various asphalt and concrete pavement replacements. The procurement utilizes the Lowest Price Technically Acceptable (LPTA) source selection method, evaluating proposals based on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed project schedule. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements. Deliverables include design documents in English units, as-built drawings, and a multi-stage inspection process consisting of punch-out, pre-final, and final acceptance inspections. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

6 days ago

DEADLINE

in 23 days
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project, solicitation BPM059366, involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Gunpowder Falls State Park Hammerman Area in Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. Key deliverables include the installation of new storage tanks, concrete pads, and side-mount dispensers, as well as the provision of temporary gasoline and diesel tanks with metered dispensers for the duration of the project. All work must adhere to strict safety and environmental standards, including NFPA 30, 30A, and 78, API standards 650 and 620, and Maryland Department of the Environment regulations, with backfill compacted to a minimum of 95 percent. The contract is a Small Business Reserve Procurement, limiting the award to certified small businesses. The basis of award is the lowest responsive and responsible total bid. Procurement goals include a 15.00% MBE and 2.0% VSBE participation rate, with liquidated damages applicable for failure to comply with MBE requirements. The state reserves the right to apply reciprocal preference for resident bidders. Final acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, requiring the submission of an approved electrical inspection certificate, a disposal manifest for contaminated soils and equipment, and three sets of manufacturer manuals and as-built drawings. Invoices are to be submitted to the Maryland Department of Natural Resources in Annapolis, with payments typically issued within 30 days of receipt of a proper invoice.

POSTED

6 days ago

DEADLINE

in about 1 month
NAICS: 237120
New
International
Комплекс робіт за принципом «проєктуй-будуй» (вишукування, розроблення проєктно-кошторисної документації (стадія РП) з експертизою, виконання будівельних робіт) по об'єкту «Реконструкція Об’єкта № 24 із встановленням аварійно-резервної газової блочно-моду
Solicitation # UA-2026-11-05-006051-a
This contract involves a design-build project for the reconstruction of Object No. 24, which includes the installation of an emergency backup gas block module. The scope of work encompasses surveying, the development of design and estimate documentation at the working project stage including expert review, and the execution of all necessary construction activities. The project is managed by the Capital Construction Department of the Kherson City Council under the Government of Ukraine. The solicitation, identified by number UA-2026-11-05-006051-a, was posted on November 5, 2026. A critical requirement for the participant is the adherence to localization standards, for which a guarantee letter dated November 3, 2026, was provided to confirm the degree of local production for the equipment used. The primary point of contact for this initiative is Natalia Lobas.
Управління капітального будівництва Херсонської міської ради

POSTED

7 days ago

DEADLINE

N/A
NAICS: 237120
New
International
Комплекс робіт за принципом «проєктуй-будуй» (вишукування, розроблення проєктно-кошторисної документації (стадія РП) з експертизою, виконання будівельних робіт) по об'єкту «Реконструкція Об’єкта № 35 із встановленням аварійно-резервної газової блочно-моду
Solicitation # UA-2026-11-05-005491-a
This contract involves a design-build project for the reconstruction of Object No. 35, which includes the installation of an emergency backup gas block module. The scope of work encompasses the survey, development of design and estimate documentation at the working project stage with expert review, and the execution of all necessary construction activities. The project is managed by the Capital Construction Department of the Kherson City Council under the Government of Ukraine. The solicitation, identified by number UA-2026-11-05-005491-a, was posted on November 5, 2026. A critical requirement for the participant is the adherence to localization standards, for which a guarantee letter dated November 3, 2026, was provided to confirm the degree of local production for the equipment used. The primary point of contact for this initiative is Natalia Lobas.
Управління капітального будівництва Херсонської міської ради

POSTED

7 days ago

DEADLINE

N/A
NAICS: 237120
New
International
Комплекс робіт за принципом «проєктуй-будуй» (вишукування, розроблення проєктно-кошторисної документації (стадія РП) з експертизою, виконання будівельних робіт) по об'єкту «Реконструкція Об’єкта № 34 із встановленням аварійно-резервної газової блочно-моду
Solicitation # UA-2026-11-05-004893-a
This contract involves a design-build project for the reconstruction of Object No. 34, which includes the installation of an emergency backup gas block module. The scope of work encompasses the survey, development of design and estimate documentation at the working project stage including expertise, and the execution of all necessary construction activities. The project is managed by the Capital Construction Department of the Kherson City Council under the Government of Ukraine. The solicitation, identified by number UA-2026-11-05-004893-a, was posted on November 5, 2026. A critical requirement for the participant is the adherence to localization standards for the production of equipment, for which a guarantee letter dated November 3, 2026, has been provided to confirm the degree of local production. The primary point of contact for this initiative is Natalia Lobas.
Управління капітального будівництва Херсонської міської ради

POSTED

7 days ago

DEADLINE

N/A
NAICS: 237120
New
International
Комплекс робіт за принципом «проєктуй-будуй» (вишукування, розроблення проєктно-кошторисної документації (стадія РП) з експертизою, виконання будівельних робіт) по об'єкту «Реконструкція Об’єкта № 28 із встановленням аварійно-резервної газової блочно-моду
Solicitation # UA-2026-11-05-003463-a
This contract involves a design-build project for the reconstruction of Object No. 28, which includes the installation of an emergency backup gas block module. The scope of work encompasses surveying, the development of design and estimate documentation at the working project stage including expert review, and the execution of all necessary construction activities. The project is managed by the Capital Construction Department of the Kherson City Council under the Government of Ukraine. The solicitation, identified by number UA-2026-11-05-003463-a, was posted on November 5, 2026. A critical requirement for the participant is the adherence to localization standards, for which a guarantee letter dated November 3, 2026, was provided to confirm the degree of local production for the equipment used. The primary point of contact for this initiative is Natalia Lobas.
Управління капітального будівництва Херсонської міської ради

POSTED

7 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The State Water Resources Control Board is managing a series of statewide restoration projects under a Program Environmental Impact Report to enhance aquatic and riparian habitats for anadromous salmonids and native species. A primary focus of these efforts is the Sunset Weir and Pumps Fish Passage Project in Sutter County, which involves removing the existing Sunset Weir from the Feather River to restore fish migration, installing five fish screens at the Sunset Pumps intake, constructing a new wet well, replacing outdated water diversion infrastructure, and stabilizing the left bank with vegetated rock slope protection. Additionally, the project includes filling the downstream scour pool and capping it with spawning grade gravel to create suitable substrate. These initiatives are part of a broader set of restoration activities across California, including projects in Butte, Fresno, Madera, Siskyou, Shasta, Tehama, and Plumas counties. Key deliverables across these sites include the construction of fishways, floodplain excavation, and the creation of side channels and habitat units. All projects are conducted in compliance with the California Environmental Quality Act and the Public Resources Code, with various agencies such as the Wildlife Conservation Board and the Central Valley Flood Protection Board serving as lead or responsible agencies. Performance for specific sites, such as the Arroyo Canal project, includes long-term land use leases extending through 2045.

General Info

State Water Resources Control Board managing statewide fish habitat and river restoration projects.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more

Full Description

Show more
The Project is designed to reconnect a backchannel to the Sacramento River and restore and enhance native fish habitat and natural floodplain processes to the area. The Project consists of reconnecting approximately 2,500 linear feet of a historically active but disconnected backchannel. The Project will restore seasonal floodplain connectivity, improve juvenile salmonid rearing habitat, eliminate fish stranding hazards created by artificial barriers, and restore natural geomorphic and hydrologic processes within the Sacramento River floodplain. The Project will improve ecological function, increase habitat complexity and diversity, restore natural river processes, and support the recovery of native fish and wildlife species within the Sacramento River ecosystem. The Project intends to restore and enhance 1.65 acres of terrestrial and aquatic habitat.

More opportunities from California → State Water Resources Control Board

Same awarding agency

NAICS: 541620
SLED
Relicensing of Balch Hydroelectric Project
Solicitation # Project No. 175
The relicensing of the 131.52-megawatt Balch Hydroelectric Project, identified as FERC Project No. 175, is being managed by the State Water Resources Control Board in Fresno County, California. Proposed by Pacific Gas and Electric Company, the project involves the continued operation of the Black Rock Reservoir, Balch Diversion Dam, Balch Afterbay and Afterbay Dam, two powerhouses, and approximately 28 miles of transmission and distribution lines. Key objectives include the rehabilitation of recreation facilities, the designation of 14 miles of roads and 2.5 miles of trails as project assets, the decommissioning of the Black Rock Creek and Weir Creek feeder facilities, and the modification of the FERC project boundary to better define operational lands and waters. The project is primarily operated as a peaking facility for power demand and irrigation, with operations coordinated with the Haas-Kings River Hydroelectric Project. Environmental compliance has been addressed through a Mitigated Negative Declaration under the California Environmental Quality Act, which determined that the project will not have a significant environmental impact. This process included a comprehensive Initial Study and a public comment period ending in December 2025. Administrative requirements included a filing fee of 3,043.75 dollars paid to the California Department of Fish and Wildlife. The project is overseen by Project Manager Jessica Dyke and must adhere to the Federal Power Act and specific FERC license articles.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 221111
SLED
Relicensing of Helms Pumped Storage Project
Solicitation # 2025110960
The State Water Resources Control Board is overseeing the FERC relicensing of the 1,212-megawatt Helms Pumped Storage Project, operated by Pacific Gas and Electric Company (PG&E) in Fresno and Madera Counties, California. The project scope includes the continued operation of the facility, the rehabilitation and replacement of existing recreation facilities, and the formal designation of approximately 36 miles of roads and one mile of trails as project infrastructure. Additionally, the project involves modifying the FERC Project boundary to accurately define lands necessary for operation and maintenance and implementing new protection, mitigation, and enhancement plans. Environmental compliance has been managed through the California Environmental Quality Act (CEQA) process, resulting in a Final Mitigated Negative Declaration in July 2026. This determination concluded that the project would not significantly affect the environment, and no further mitigation conditions or monitoring plans were required. Key regulatory requirements include obtaining a water quality certification under section 401 of the federal Clean Water Act and adhering to CalGEM guidelines regarding the safety and abandonment of oil, gas, or geothermal wells within the project area. The project is supported by Stantec Consulting Services, Inc., and involves coordination with trustee agencies such as the California Department of Fish and Wildlife.
Hydroelectric Power Generation

POSTED

12 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS