NESWTF Chemical Storage Building & Ozone Filter Gallery Repairs

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno is soliciting project WC00021 for the NESWTF Chemical Storage Building and Ozone Filter Gallery Repairs at the Northeast Water Surface Treatment Facility located at 10120 N. Chestnut Ave, Fresno, California. The scope of work involves the removal and replacement of two sodium hypochlorite tanks and their pedestals, as well as one chemical transfer pump pedestal. Additionally, the project includes applying epoxy floor coatings in the chemical storage building to improve spillage safeguards and using epoxy grouting to repair concrete structures, specifically addressing non-structural surface cracking in the Ozone Gallery to prevent water ingress and repairing spalling on tank pedestals caused by chemical leaks. The project is categorized as exempt under California CEQA Guidelines Sections 15301/Class 1 and 15300.2, as it maintains existing operational capacity without expanding the facility. All epoxies that come into contact with water must comply with ANSI and NSF Standard 61 for drinking water system components. The project is managed by the City of Fresno Capital Projects Department, with Alan Simpson and Jesus Amador serving as primary points of contact. These repairs are essential for the continued distribution of clean drinking water to the residents of Fresno.

General Info

City of Fresno project for chemical storage building and ozone filter gallery repairs.

Agency

California → City of Fresno

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

North Chestnut Avenue and East Behymer Avenue, Fresno, CA

Set-Aside

NONE

Documents

(2)

WC00021 Ozone and Tank Pedestal CEQA-CatEx 11172025

PDFcategorical-exemption

WC00021 Notice of Exemption for NESWTF Chemical Storage Building Repairs

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Alan SimpsonLicensed Professional Engineer

Full Description

Show more
The proposed project activities are to take place at an existent public utility site and include the removal and replacement of two existing sodium hypochlorite tanks and corresponding pedestals, removal and replacement of one existent chemical transfer pump pedestal. application of epoxy floor coating in the project area within the existing chemical storage building to enhance spillage safeguards and the application of epoxy grouting to facilitate the repair of existing concrete structures. The beneficiaries of this project include the residents of the City of Fresno. as these repairs will allow for continued operation and distribution of clean drinking water.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS