Foothill College Tennis Courts Renovations CEQA Exemption

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Foothill-De Anza Community College District is undertaking the resurfacing of existing tennis courts at its Los Altos Hills campus, located at 12345 El Monte Road, with the addition of pickleball lines and new lighting systems. The physical dimensions of the courts will remain unchanged, and there will be no increase in student enrollment, but the modifications will expand recreational capacity by enabling pickleball play alongside tennis, thereby increasing usage and utility of the facility. Public access to the courts will continue uninterrupted. The project is classified under NAICS code 237990 and is governed by a CEQA exemption, with environmental compliance focused on noise and vibration impacts from construction equipment such as dozers, loaders, cranes, and concrete saws. Assessments are conducted according to FTA guidelines, ensuring noise levels do not exceed 80 dBA Leq during daytime hours at residential receptors located 50 feet from the source or property line, and vibration remains within the FTA limit of 0.2 in/sec PPV. Measurement standards follow ANSI S1.4 for sound level accuracy and local town ordinances for compliance. The construction period is estimated at 13 weeks, commencing after CEQA approval and subsequent bidding. PlaceWorks is involved as the environmental consultant preparing the technical documentation, but no formal contracting officer, COR, COTR, or PCO roles are designated in the materials. Payment details, accounting codes, invoicing systems, contract value estimates, and procurement evaluation criteria are not provided. The project does not include federal contract clauses, packaging specifications, or socioeconomic requirements, and no bid submission instructions or deadlines are outlined. The primary objective is to enhance campus recreation offerings through modest infrastructure improvements while maintaining environmental and regulatory compliance.

General Info

Resurface tennis courts, add pickleball lines and lighting, no enrollment increase, comply with noise and vibration standards.

Agency

California → Foothill-De Anza Community College District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Los Altos Hills, CA, 94022

Set-Aside

NONE

Documents

(2)

Foothill College Tennis Courts Renovations CEQA Notice of Exemption

PDFnotice-of-exemption

Foothill College Tennis Courts Renovations CEQA Exemption Memo

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Foothill-De Anza Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Foothill-De Anza Community College District
Office AddressN/A
Contacts
David FischDirector, Capital Construction Program

Full Description

Show more
The District will resurface the existing tennis courts and add pickleball lines and lighting. The size of the courts will not change and there will be no change to student enrollment. The addition of pickleball courts will increase available capacity at the courts and provide another sport available to play on campus. The public will continue to have access to the courts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details