SLPR-Arendsee Rock Revetment Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SLPR-Arendsee Rock Revetment Replacement Project, identified by solicitation number MND2024-016, is a shoreline protection effort managed by the San Diego Unified Port District. Located bayward of 407 and 409 First Street in Coronado, California, the project involves the removal and disposal of existing rock revetment and debris, the placement of new substrate and rock revetment, and final site cleanup and demobilization. Construction is scheduled to begin in early 2026 and is expected to take approximately three months to complete. The project is governed by a non-appealable Coastal Development Permit and must comply with the California Environmental Quality Act, the Coastal Act, and U.S. Army Corps of Engineers Section 10 approval. A Mitigated Negative Declaration has been issued, certifying that the project will not have a significant environmental effect provided that specific mitigation measures for noise and biological resources are implemented. Contractors are required to adhere to strict water quality standards to protect sensitive species like eelgrass and must comply with OSHA safety standards and U.S. Department of Transportation hazardous materials regulations for the movement of goods. Coordination with Caltrans is also required for any work involving their right-of-way or the use of hauling permits.

General Info

San Diego Port District shoreline rock revetment replacement in Coronado starting early 2026.

Agency

California → San Diego Unified Port District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

407 and 409 First Street and I Avenue, Coronado, CA, 92118

Set-Aside

NONE

Documents

(7)

NOD_SLPR Rock Revetment Replacement 2025

PDFnotice-of-determination

SLPR-Arendsee Rock Revetment Project ISMND August 2025

PDFenvironmental-initial-study-mitigated-negative-declaration

SLPR-Arendsee Rock Revetment Project NOC

PDFnotice-of-completion

Caltrans Comments on SLPR-Arendsee Revetment Replacement Project MND

PDFcomment

SLPR-Arendsee Rock Revetment Replacement Project Final Initial Study Checklist/Mitigated Negative Declaration

PDFmitigated-negative-declaration

SLPR Arendsee Rock Revetment Project SCH Summary Form

PDFenvironmental-summary

SLPR-Arendsee Rock Revetment Project Notice of Intent to Adopt Mitigated Negative Declaration

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Luis DuranSenior Planner
Thomas A. GilsonAttorney

Interested Companies (1)

Show more
Dudek
Encinitas, CA

Full Description

Show more
The project includes the replacement of existing rock revetment located bayward of homes at 407 and 409 First Street in Coronado. The project Applicants will be issued a Non-appealable Coastal Development Permit to allow the removal and disposal of existing rock revetment and debris, the placement of new substrate and rock revetment, and final cleanup and demobilization of the project. Project construction would begin early in 2026 and would take approximately 3 months to complete.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS