Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Western Water's Recycling Facility Recycled Water Pond Erosion Prevention Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Western Water's Recycling Facility Recycled Water Pond Erosion Prevention Project, managed by the Western Municipal Water District, focuses on providing permanent repairs and improvements to the deteriorating slopes of the Recycled Water Storage Pond. Located at 22751 Nandina Ave, March Air Reserve Base, California, the project aims to address existing erosion and prevent future occurrences. A critical requirement is that all activities must be performed without interrupting the operation of the storage pond to ensure continuous facility operation and the uninterrupted distribution of recycled water to customers. The project is structured in two phases: Phase 1 targets slope improvements near the secondary effluent equalization basin to protect the concrete liner and the slope between the recycled water and effluent ponds, while Phase 2 covers the remaining storage pond slopes. Depending on the selected slope protection alternative, such as riprap, the project may require the installation of a bypass system for a temporary berm. The work is guided by a Preliminary Design Report from Lee + Ro and a Geotechnical Investigation Report from Universal Engineering Sciences. Environmentally, the project is classified under CEQA categorical exemptions for existing facilities, replacement or reconstruction, and minor land alterations, and it remains consistent with the Public Facilities designation of the March Area Plan.

General Info

Western Municipal Water District will repair RW Storage Pond slopes without interrupting operations.

Agency

California → Western Municipal Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Western Municipal Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Western Municipal Water District
Office AddressN/A
Contacts
Zuzanna RandCIP Engineer
Boyana AngelovaCivil Engineer

Full Description

Show more
The project addresses the erosion of the RW Storage Pond slopes and aims to prevent future erosion. Its goal is to provide permanent repairs for the deteriorating slopes and improve them to prevent future issues. Activities will be performed without interrupting the operation of the RW Storage Pond to minimize disruptions to pond storage, facility operation, and recycled water distribution to customers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CRAg01 - Hawk Highwalls
Solicitation # CR-Ag-01
The Hawk Highwalls Reclamation Project (CR-Ag-01) is an abandoned mine land reclamation effort located in Augusta Township, Carroll County, Ohio. The project aims to eliminate safety hazards at a pre-law coal mine site by backfilling three dangerous highwalls, ranging from 30 to 58 feet in height, and addressing four hazardous water bodies with insufficient discharge structures. The scope of work includes clearing and grubbing, impoundment dewatering, earthwork to establish safe side slopes and positive drainage, and the installation of engineered catch basin risers, plunge pools, and sediment control structures. Following construction, the contractor must perform standard revegetation and a subsequent maintenance period involving the removal of temporary structures and final grading. The project is estimated at $2,029,473.00, with a construction completion date of September 25, 2027. The procurement process requires a mandatory pre-bid meeting on October 22, 2026, with bids due by November 5, 2026, via Bid Express. Award will be granted to the lowest responsive and responsible bidder based on experience, financial condition, and execution capability. Key compliance requirements include adherence to Davis-Bacon prevailing wage rates, a 5% EDGE business enterprise participation goal, and the provision of a performance bond in the amount of $26,622.50. The project follows ODOT Construction and Material Specifications (January 1, 2023) and requires compliance with the Ohio EPA Construction Site Stormwater General Permit. Payment is processed monthly through the Division's electronic system, with an 8% retainage on labor until the work is 50% complete.
ODNR-Division of Mineral Resources Management

POSTED

about 14 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Belle Fountain Ditch Cleanout Phase 2
Solicitation # W912EQ26BA002
Solicitation W912EQ26BA002 is a firm-fixed-price contract issued by the US Army Corps of Engineers, Memphis District, for the Belle Fountain Ditch Cleanout Phase 2 project in Pemiscot County, Missouri. The scope of work requires the provision of all plant, labor, and materials for channel cleanout of the Belle Fountain Ditch region, specifically covering the Bypass of Steele and Main Ditch. The project limits begin at the confluence of New Franklin Ditch and Bypass of Steele, extending north through Main Ditch and ending approximately 100 feet before the intersection of Main Ditch and County Rd. 442, roughly 2.5 miles south of Braggadocio. The estimated construction magnitude is between 1 million and 5 million dollars. This procurement is a set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 237990. Bidders must enter a National Institute of Standards and Technology score in the Supplier Performance Risk System to be considered responsive. Key requirements include the submission of pre- and post-construction surveys in Autodesk compatible files and the provision of a certified Construction Quality Management for Contractors manager. Awarded contractors must submit performance and payment bonds, a certificate of insurance, and approved accident prevention, environmental protection, and quality control plans within specified post-award timeframes. Progress payments will be made monthly via RMS based on work accomplished.
W07V Endist Memphis

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
KC-46A ADAL Apron and Hydrant Fueling Pits
Solicitation # W9127825RA068
Solicitation W9127825RA068 is a design-bid-build construction project for the KC-46A ADAL Apron and Hydrant Fueling Pits at MacDill Air Force Base, Florida. The scope of work includes replacing the north apron and taxilane pavement, upgrading the stormwater drainage system, and enhancing the fuel hydrant system to support the simultaneous fueling of four aircraft at 600 GPM each. Additional requirements include increasing the Motor Control Center capacity from 800 to 1000 amps and installing new airfield lighting, including apron edge lights and additional fixtures on existing and new poles. The estimated project cost ranges from 60 million to 120 million dollars. The contract will be awarded based on a best value source selection where non-priced evaluation factors are significantly more important than price. The primary evaluation factors are the prime contractor's past performance and the technical approach, while the small business approach is rated as acceptable or unacceptable. Price is evaluated using the Price Includes Variation Over Time method. Other than small business offerors must provide a subcontracting plan per FAR 52.219-9, Alternate II, to be eligible for award. Performance must begin within eight calendar days of award, and performance and payment bonds are required within ten calendar days. Proposals must be submitted electronically via the PIEE portal by October 23, 2026.
W074 Endist Mobile

POSTED

about 21 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is an Invitation for Bid issued by the National Park Service Denver Service Center for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. This Small Business Set-Aside project is a Firm-Fixed-Price contract with an estimated magnitude between $1 million and $5 million. The scope of work involves repairing and extending a seawall damaged by Hurricane Ian, specifically requiring selective demolition, the installation of weatherable rigid vinyl and FRP composite sheet pile walls, and comprehensive site restoration including soil backfilling, sodding, and the installation of limestone riprap. All work must be completed within a mandatory performance period of 259 calendar days, starting within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—including technical approach, schedule, and management approach—are significantly more important than price. Bids are due by November 6, 2026, and must be submitted via email. Contractors are required to provide a Job Site Safety Manager, a written Quality Control plan, and must adhere to the Archaeological Resources Protection Act of 1979 to protect soil deposits. Compliance with the Davis-Bacon Act and specific environmental standards, such as the use of biodegradable packaging and recycled materials, is mandatory. Payment requests must be processed electronically through the Invoice Processing Platform System following a seven-day draft review by the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 21 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS