Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sandpiper Golf Course Renovation and New Clubhouse Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sandpiper Golf Course Renovation and New Clubhouse Project, managed by the City of Goleta, involves the comprehensive redevelopment of a 193-acre site at 7925 Hollister Avenue. The scope of work includes the demolition of a 9,305 square foot clubhouse and the construction of a new two-story replacement building with a basement, as well as the redesign and re-routing of the 18-hole golf course. Additional facilities include a new coffee shop, the adaptive reuse and restoration of the historic Barnsdall Rio Grande Gas Station, replacement maintenance facilities, and a new on-course restroom. Infrastructure improvements along Hollister Avenue will feature a new public trail, undergrounded utilities, a relocated bus station, and curb and sidewalk enhancements. The project is subject to strict environmental and regulatory compliance, including the California Environmental Quality Act and California Coastal Commission review. Key requirements include a five-acre easement dedication at Bell Canyon, adherence to ADA accessibility standards, and specific waste diversion rates of 98 percent for concrete cart paths and 65 percent for other materials. Technical specifications mandate ASTM D-1557 compaction standards for fill material and a repair-in-kind approach for historic preservation. Construction is anticipated to last 18 months, spanning from July 2026 to December 2027, with all staging occurring onsite and debris transported to the Taijigua Landfill.

General Info

City of Goleta project renovating Sandpiper Golf Course and clubhouse from 2026 to 2027.

Agency

California → City of Goleta

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Hollister Avenue and Cathedral Oaks Road, Goleta, CA

Set-Aside

NONE

Documents

(31)

Appendix Q Supplemental Letter to March 2025 BRA for Sandpiper Golf Course Project

PDFsupplemental-letter

Preliminary Water Demand Analysis for Sandpiper Golf Club Improvement Project

PDFother

Appendix H Paleontological Resources Inventory Letter Report Sandpiper Golf Course Redevelopment Project

PDFreport

Appendix B Civil Drawings - Sandpiper Golf Club Preliminary Improvement Plans

PDFspecifications

Sandpiper Golf Course Renovation Draft EIR Notice of Availability

PDFnotice-of-availability

Sandpiper Golf Course Renovation Notice of Determination

PDFnotice-of-determination

Appendix N Updated Traffic, Parking, and VMT Study for Sandpiper Golf Course Master Plan

PDFstudy-report

Appendix L Bluff Retreat Evaluation Report PRC 421 Decommissioning Project

PDFreport

SCH Summary Form for Sandpiper Golf Course Renovation Project

PDFenvironmental-summary

Appendix B_Landscape Plans_OCR

PDF

Appendix F Geologic Technical Reports for Sandpiper Golf Club Redevelopment

PDFgeologic-technical-report

CDFW Comments on Sandpiper Golf Course DEIR SCH No. 2024120923

PDFcomment-letter

Appendix P Bicycle Path Plans

PDFother

Notice of Preparation for Sandpiper Golf Course Renovation DEIR

PDFnotice-of-preparation

Notice of Competition & Environmental Document SCH # 202412093

PDFspecial-notice

Appendix M Noise Modeling Calculations for Sandpiper Golf Course

PDFnoise-modeling-calculations

Sandpiper Golf Course Renovation and New Clubhouse Project Draft EIR

PDFenvironmental-impact-report

Appendix B Irrigation Drawings

PDFspecifications

Appendix K Preliminary Water Service Determination Letter

PDFother

Appendix B_Architectural Drawings_OCR

PDF

Appendix B Lighting Plan

PDFspecifications

Appendix I - Hazardous Materials Technical Reports - Supplemental Site Assessment Sandpiper Golf Course

PDFsow

Appendix G-1 Preliminary Drainage Study for Sandpiper Golf Club

PDFhydrologic-technical-report

Appendix D_Biological Resources Technical Reports_OCR

PDF

Appendix B Fire Protection Plan

PDFother

Appendix C Air Quality and Greenhouse Gas Emissions Technical Memorandum for Sandpiper Golf Course Redevelopment Project

PDFtechnical-memorandum

Appendix B Photometric Drawings Fixture Schedule

PDFspecifications

Appendix B Landscape and Golf Course Layout Drawings

PDFother

Appendix E-1 Built Environment Inventory and Evaluation Report Sandpiper Golf Course

PDFtechnical-report

Sandpiper NOD Receipt 6

PDF

Appendix J Coastal Hazards Analysis Technical Memorandum for Sandpiper Golf Course Renovations

PDFtechnical-memorandum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Goleta
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Goleta
Office AddressN/A
Contacts
Mary ChangSupervising Planner
Steve WeltonPrincipal Planner

Interested Companies (1)

Show more
Rincon Consultants
San Diego, California

Full Description

Show more
The Project will result in modifications to an existing 18-hole golf course, such as: demolition of the existing clubhouse and construction of a replacement clubhouse; modifications to and re-routing of the existing golf course; the replacement of an on-course restroom facility with a similar facility; landscaping and irrigation improvements; replacement of existing maintenance facilities; construction of a new coffee shop adjacent to the historic Barnsdall Rio Grande Gas Station; adaptive reuse and restoration of the historic Barnsdall Rio Grande Gas Station; incorporation of the new clubhouse and restroom facility into the Sphere of Influence for the Goleta West Sanitary District; right-of-way vacation from the City; and improvements along Hollister Avenue, including revised entry points, a new public trail, undergrounding of electrical and utility lines, bus station relocation, and curb and sidewalk improvements. Application and City CEQA File Number: 22-001-CDPH (in concept); 22-0009-DPCUP; 22-0032-DRB

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS