Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Old and Middle River Pump Stations Water Quality Monitoring Instrumentation Improvements Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Contra Costa Water District will upgrade water quality monitoring equipment at its Old River and Middle River intakes in the Sacramento-San Joaquin Delta to mitigate risks posed by invasive golden mussels, which currently clog the existing two-inch piping used for sampling. The project involves installing two multiparameter sondes—one at each intake—encased in six-inch diameter HDPE stilling wells mounted on existing concrete cantilever platforms facing the fish screens. These larger-diameter wells will drastically reduce the likelihood of blockage and improve accessibility for maintenance. Data collected by the sondes will be transmitted via new and existing conduits back to the electrical buildings at each site, ensuring continuous, reliable water quality monitoring without disruption to current operations. Construction is scheduled for a three-month period between June and August 2026, with all activities confined to previously disturbed areas on CCWD property, including paved roads and parking zones within the pump station boundaries. No vegetation or tree removal, ground disturbance, or impact to river banks or beds is anticipated. Equipment installation will be performed from the cantilever platforms on land and via boat or barge in the water directly below, using crew trucks, a vessel, and power tools. The project will not affect natural resources or any known cultural or historic sites, and all equipment laydown and staging will occur within existing developed areas, minimizing environmental footprint.

General Info

Upgrade water monitoring equipment at two intakes to prevent mussel blockage, install new sondes, no environmental impact.

Agency

California → Contra Costa Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Contra Costa Water District
Office AddressN/A
Contacts
Cody EricksenAssociate Planner

Full Description

Show more
This Project consists of the installation of upgraded water quality monitoring equipment at CCWD’s Old River and Middle River intakes in the Sacramento-San Joquin Delta. Currently, water samples at these intakes are pumped out of wet wells that pass through two-inch diameter piping, which is at high risk of being blocked by the spread of invasive golden mussels (Limnoperna fortunei). The purpose of this project is to install new water quality monitoring equipment that will provide more reliable monitoring data and will decrease the risk of being blocked by golden mussels. A total of two multiparameter sondes will be installed, one at Old River and one at Middle River. Each sonde will be incased in a six-inch diameter HDPE pipe stilling well and mounted to the existing concrete cantilever platforms located in front of the fish screen at each intake, where they will extend into the water to collect water quality data. These larger diameter stilling wells will significantly decrease the risk of clogging due to golden mussels and will be easier to access and maintain. See Figure 1 for a Project vicinity map and Figures 2 and 3 for Project location maps. Data from these sondes will be transmitted back to the electrical building at each site through new and existing conduits. The Project is expected to take three months, with construction occurring between June and August of 2026. Equipment laydown and vehicle staging will occur in previously disturbed areas, such as paved roads and parking areas, within the boundaries of the pump stations on CCWD property. The following types of equipment are expected to be present at the project site: crew trucks, a boat or barge, and power tools. Project activities will occur in previously developed and disturbed areas on CCWD property. No vegetation removal or tree removal will occur. No ground disturbance will occur, and there will be no impact to the banks or beds of the rivers at either intake. Equipment installation will occur from land via the concrete cantilever platforms and from a boat or barge in the water immediately below the platform. The Project is not anticipated to adversely affect natural resources or areas of known cultural or historic resources.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS