New Bullards Bar Dam Atmospheric River Control (ARC) Spillway Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The New Bullards Bar Dam Atmospheric River Control (ARC) Spillway Project, led by the Yuba County Water Agency, involves the construction, operation, and maintenance of a new spillway and associated facilities on the left abutment of the New Bullards Bar Dam in California. The primary objective of the project is to reduce flood risk within the Yuba-Feather River system. Key infrastructure includes a 500-foot-long approach channel, a gated control structure, and a concrete-lined spillway chute featuring a flip bucket designed to discharge 64,000 cubic feet of water per second toward the North Yuba River canyon. Additionally, the project includes a 690-foot-long excavated discharge channel, an operations platform, a gate control building, electrical monitoring systems, and permanent access features such as roads and maintenance benches. The scope of work also requires the relocation of a short segment of Marysville Road and an existing overlook site, as well as the establishment of a permanent disposal area for excavated soil and rock. Construction is expected to take approximately four years. The project has undergone environmental review, with an Environmental Impact Report approved and a Notice of Determination issued by the State Water Resources Control Board on June 12, 2026. The project is categorized under NAICS code 237990 and is managed by the Yuba County Water Agency.

General Info

Construct ARC spillway on New Bullards Bar Dam for flood control, with gated structure, concrete chute, roads, and infrastructure over four years.

Agency

California → Yuba County Water Agency

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Yuba County Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yuba County Water Agency
Office AddressN/A
Contacts
Adam CohenSenior Environmental Scientist (Specialist)
John JamesProject Manager

Full Description

Show more
The Project involves constructing, operating, and maintaining a new additional spillway and associated facilities on the left abutment of New Bullards Bar Dam. New Project facilities include: (1) a 500-foot-long approach channel excavated adjacent to the existing spillway to connect the spillway control structure and chute to New Bullards Bar Reservoir; (2) a gated control structure located directly downstream of the approach channel; (3) a concrete-lined spillway chute located downstream of the control structure equipped with a flip bucket directing flows toward the North Yuba River canyon; (4) a 690-foot-long excavated discharge channel that discharges to the North Yuba River; and (5) an operations platform and gate control building, electrical systems for gate operation and monitoring, and new permanent access features (e.g., roads, operations platform, overlook site access, and maintenance benches). The spillway chute will be an open channel designed with a freeboard capable of discharging 64,000 cubic feet of water per second from New Bullards Bar Reservoir for flood control. The ARC Spillway will mainly operate to reduce flood risk in the Yuba-Feather River system. The Project also requires relocation of an existing overlook site at New Bullards Bar Dam’s left abutment, relocation of a short segment of Marysville Road over the new spillway, and establishment of a permanent disposal area for excess excavated soil and rock associated with the Project’s construction. Construction is anticipated to occur over approximately four years.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS