Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Tuolumne River Regional Park Gateway Precise Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tuolumne River Regional Park Gateway Precise Plan, managed by the City of Modesto, involves the River Overlook Project located on the right bank of the Tuolumne River in Modesto, California. This project is situated within a Central Valley Flood Protection Board Designated Floodway and is governed by Permit No. 20076 under California Code of Regulations, Title 23, Article 3, Section 6. The scope of work includes the installation of a 171-foot elevated boardwalk supported by 16-inch diameter concrete piles embedded 15 feet deep, a concrete lookout platform with metal railing, and landscaping consisting of nine trees and fine fescue hydroseed. Additionally, the project requires the installation of an irrigation system featuring 476 feet of 3/4-inch drip lines and 260 feet of 1-inch schedule 40 PVC irrigation lines, both set to a minimum depth of 24 inches and equipped with a control box and shut off valve. The project received approval from the Central Valley Flood Protection Board on June 11, 2026, following a Mitigated Negative Declaration under the California Environmental Quality Act. Project management is led by Jason Ortega for the City of Modesto, with technical oversight provided by the Central Valley Flood Protection Board.

General Info

Modesto to build elevated boardwalk and irrigation system in Tuolumne River floodway with ecological enhancements.

Agency

California → City of Modesto

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

S. 9th Street and Tuolumne River, Modesto, CA

Set-Aside

NONE

Documents

(1)

Permit 20076 Notice of Determination for Tuolumne River Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Modesto
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Modesto
Office AddressN/A
Contacts
Jason OrtegaProject Manager
Angela Nguyen-TanSenior Environmental Scientist

Full Description

Show more
Approval of Permit No. 20076, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install an elevated boardwalk approximately 171 feet long supported by 16-inch diameter concrete piles embedded to a depth of 15 feet, a concrete lookout platform with metal railing, the planting of 9 trees, hydroseed with fine fescue, and 476 feet of 3/4-inch drip lines and 260 feet of 1-inch, schedule 40 PVC irrigation lines with control box and shut off valve. The irrigation lines will be set to a minimum depth of 24 inches. The project lies within the right bank of the Tuolumne River, a Central Valley Flood Protection Board Designated Floodway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 12 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS