Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Van Sickle Bi-State Park Safety and Equitable Access Improvements Project

Forecast
2009042033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Van Sickle Bi-State Park Safety and Equitable Access Improvements Project, managed by the California Tahoe Conservancy and the Department of General Services, focuses on enhancing accessibility and infrastructure within a 15-acre area of the park in South Lake Tahoe, El Dorado County. This phase three project involves the construction of approximately 0.4 to 0.5 miles of Class 1 paved shared-use trails and unpaved hiking trails to connect the California day-use area to the park entrance and the state line monument. Additional deliverables include a new entrance plaza, two picnic areas with amenities, and the paving and upgrading of an unpaved parking lot to include stormwater facilities and snow storage for winter operations. All improvements must align with the Conservancy's 2018 ADA Self-Evaluation and Transition Plan to ensure equitable pedestrian and bicycle access. The project is subject to strict environmental and cultural compliance measures under CEQA and TRPA regulations. Key requirements include the implementation of a Stormwater Pollution Prevention Plan (SWPPP) and an Invasive Species Prevention and Management Plan featuring clean-equipment protocols to prevent the spread of noxious weeds. Biological protections require pre-construction nesting bird surveys from March to August and protocol-level special-status plant surveys by qualified botanists. Furthermore, archaeological surveys must be conducted by a qualified archaeologist and a member of the Washoe Tribe. In the event of a cultural discovery, work must cease within 100 feet of the find until the Conservancy and the Washoe Tribe provide direction for protection or preservation.

General Info

Infrastructure and accessibility improvements at Van Sickle Bi-State Park with strict environmental compliance.

Place of Performance

Montreal Rd/Lake Pkwy and Heavenly Village Way, CA, 96150

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tahoe Conservancy
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The proposed project, as phase three, proposes to construct several new elements within the California side of Van Sickle Bi-State Park, including approximately 0.4 miles of Class 1 paved trail, up to 0.5 miles of unpaved hiking trail, a new entrance plaza, two picnic areas with amenities, and improvements to several existing park features, and the unpaved parking lot, which would be paved and upgraded with snow storage, and stormwater facilities for future potential winter operations.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from California → Tahoe Conservancy

Same awarding agency

NAICS: 541620
SLED
Land Bank Pier Program
Solicitation # 117-060-018
The California Tahoe Conservancy, acting as the lead agency, manages the Land Bank Pier Program to facilitate the sale of coverage and restoration credits for the construction of structures providing access to piers and watercraft moorings within the shorezone of Lake Tahoe. This specific action involves the transfer of restoration credits from Conservancy-owned land to 2750 West Lake Blvd to satisfy Tahoe Regional Planning Agency permit requirements. The project entails the demolition and permanent removal of an existing single-use pier and all appurtenant structures at 2895 West Lake Blvd and the reconstruction of a new 10-foot wide by 100-foot long single-use pier at 2750 West Lake Blvd, which will include public access stairways. Under the California Environmental Quality Act, the Conservancy determined that the project will not have a significant effect on the environment and adopted a negative declaration. No mitigation measures, monitoring plans, or statements of overriding conditions were required for approval. This internal agency environmental compliance action is associated with solicitation number 117-060-018 and includes a paid environmental filing fee of 2,480.25 dollars to the California Department of Fish and Wildlife. The project is located in Tahoe City, California, and ensures consistency with the program guidelines adopted on November 8, 2021.
Environmental Consulting Services

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
South Tahoe Greenway Shared-Use Trail (Greenway) Project Modifications
Solicitation # 2006112070
The California Tahoe Conservancy is implementing modifications to the Dennis T. Machida Memorial Greenway, specifically focusing on the northern 1/3 mile of Phase 3 known as the Greenway-Van Sickle Connector in South Lake Tahoe. This project, identified by solicitation number 2006112070, involves refining the trail alignment between Chonokis Road and the Greenway terminus, adjusting boardwalk widths and footings, and substituting mitigation measure CUL-1. These changes are designed to ensure compliance with the Americans with Disabilities Act (ADA) and are intended to be constructed concurrently with the Van Sickle Bi-State Park Safety and Equitable Access Improvements Project to maximize efficiency. The project is governed by the California Environmental Quality Act (CEQA), with a Notice of Determination issued on June 18, 2026, stating that the project will not have a significant environmental impact. Compliance is managed through a Mitigation Monitoring and Reporting Plan that includes protections for raptor and migratory bird nests, sensitive plants, and wildlife. Additionally, the project adheres to TRPA Code section 61.3.7 for old growth protection and requires archaeological monitoring during ground-disturbing activities to protect historical and tribal cultural resources. Scott Cecchi serves as the Project Manager for the California Tahoe Conservancy.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS