Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Land Bank Pier Program

Forecast
117-060-018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Tahoe Conservancy, acting as the lead agency, manages the Land Bank Pier Program to facilitate the sale of coverage and restoration credits for the construction of structures providing access to piers and watercraft moorings within the shorezone of Lake Tahoe. This specific action involves the transfer of restoration credits from Conservancy-owned land to 2750 West Lake Blvd to satisfy Tahoe Regional Planning Agency permit requirements. The project entails the demolition and permanent removal of an existing single-use pier and all appurtenant structures at 2895 West Lake Blvd and the reconstruction of a new 10-foot wide by 100-foot long single-use pier at 2750 West Lake Blvd, which will include public access stairways. Under the California Environmental Quality Act, the Conservancy determined that the project will not have a significant effect on the environment and adopted a negative declaration. No mitigation measures, monitoring plans, or statements of overriding conditions were required for approval. This internal agency environmental compliance action is associated with solicitation number 117-060-018 and includes a paid environmental filing fee of 2,480.25 dollars to the California Department of Fish and Wildlife. The project is located in Tahoe City, California, and ensures consistency with the program guidelines adopted on November 8, 2021.

General Info

Conservancy transfers restoration credits for pier removal and reconstruction at Lake Tahoe.

Place of Performance

Sugar Pine Rd, CA, 96141

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tahoe Conservancy
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Daniel HuertaAssociate Environmental Planner

Full Description

Show more
The California Tahoe Conservancy acted as lead agency to adopt the land bank pier program guidelines and the negative declaration for the pier program on 11/8/2021. The program allows for the sale of coverage and restoration credits to construct structures that provide access to new and existing piers, existing watercraft moorings, and other structures within the shorezone of Lake Tahoe in California. As part of the program, staff evaluates the potential environmental effects of each individual pier project and ensures consistency with the guidelines and negative declaration. This transaction consists of the transfer of 101 square feet of restoration credits from Conservancy-owned land to 2750 West Lake Blvd., and will facilitate demolition and permanent removal of an existing single-use pier and all appurtenant structures at 2895 West Lake Blvd. and reconstruction of a new single-use pier at 2750 West Lake Blvd. The new pier will be 10 feet wide and 100 feet long and include public access stairways to allow the public to cross the pier. The restoration credit transfer will satisfy the Tahoe Regional Planning Agency permit requirements for access stairs to a new pier on Lake Tahoe. This is to advise that the California Tahoe Conservancy (Conservancy), acting as a lead agency, has approved the above described project and has made the following determinations: 1. The project will not have a significant effect on the environment. 2. The Conservancy adopted a negative declaration pursuant to the provisions of CEQA. 3. Mitigation measures were not made a condition of the approval of the project. 4. A mitigation monitoring or reporting plan was not adopted for the project. 5. A statement of overriding conditions was not adopted for this project. 6. Findings were not made pursuant to the provisions of CEQA. A copy of the negative declaration is available to the general public at: https://tahoe.ca.gov/wp-content/uploads/sites/257/2021/11/8_Pier-Program-Guidelines_Att3_IS-and-ND.pdf

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
On-Call Solid Waste Data Analysis and Economic Services
Solicitation # 26-202-S
Seattle Public Utilities is seeking an on-call consultant to provide expert solid waste data analysis and economic services to support the city's Zero Waste goals. This contract, with an estimated value of $625,000 and a duration of up to five years, focuses on leveraging extensive datasets to evaluate the effectiveness, equity, and feasibility of solid waste incentives, programs, and policies. The scope of work includes program evaluation using causal inference, economic modeling, demand forecasting, longitudinal analysis of waste characteristics, and the extraction of data from Microsoft Access databases. A key component of the engagement is the translation of complex technical findings into actionable insights through data visualization, strategic storytelling, and high-quality reports for both technical and non-technical audiences. The selection process is based on a weighted evaluation of project team qualifications and research and analytical capabilities, with a strong emphasis on equity-centered analysis and the ability to manage multiple projects in an on-call environment. Awarded consultants must adhere to strict compliance standards, including mandatory WMBE inclusion plans for contracts over $343,000, adherence to the Americans with Disabilities Act and WCAG accessibility guidelines, and compliance with Seattle's Equal Benefits and minimum wage ordinances. The contract is governed by a template that incorporates FAR Part 31 for allowable overhead costs and requires specific insurance coverages, including Commercial General Liability and Worker's Compensation. Work is assigned via individual work assignments, each with its own defined schedule and deliverables.
Seattle Public Utilities

POSTED

about 17 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541620
New
SLED
BIG WAVE NEW BRIDGE
Solicitation # 2027-RFP - Big Wave Bridge-00211
The County of San Mateo, through the Planning and Building department, is soliciting proposals for a qualified consultant to secure resource agency and encroachment permits for the construction of the Big Wave New Bridge. Located at 386 Airport Street in Half Moon Bay, the bridge will span a wetland drainage area between a Big Wave parcel to the north and a County-owned parcel to the south to ensure pedestrian path continuity toward the Princeton area. This project is conducted under the conditions of approval for Planning Permit PLN2013-00451. It is important to note that the actual construction of the bridge and the application for the building permit are explicitly excluded from the consultant's scope of work. The contract has a term of one year, with an anticipated award date of November 24, 2026. Proposals must be submitted via the eProcurement portal by November 16, 2026, and must be divided into a technical proposal and a separate fee proposal. Award selection is based on a points-based scoring method where firm qualifications, project approach, proposed schedule, and price are each weighted at 25 percent. The County provides a procurement preference for local businesses and non-profits. All communications regarding the RFP must be handled through the authorized contact persons, Camille Leung and Amy Tang, or the eProcurement portal.
Planning and Building

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Tahoe Conservancy

Same awarding agency

NAICS: 237990
SLED
South Tahoe Greenway Shared-Use Trail (Greenway) Project Modifications
Solicitation # 2006112070
The California Tahoe Conservancy is implementing modifications to the Dennis T. Machida Memorial Greenway, specifically focusing on the northern 1/3 mile of Phase 3 known as the Greenway-Van Sickle Connector in South Lake Tahoe. This project, identified by solicitation number 2006112070, involves refining the trail alignment between Chonokis Road and the Greenway terminus, adjusting boardwalk widths and footings, and substituting mitigation measure CUL-1. These changes are designed to ensure compliance with the Americans with Disabilities Act (ADA) and are intended to be constructed concurrently with the Van Sickle Bi-State Park Safety and Equitable Access Improvements Project to maximize efficiency. The project is governed by the California Environmental Quality Act (CEQA), with a Notice of Determination issued on June 18, 2026, stating that the project will not have a significant environmental impact. Compliance is managed through a Mitigation Monitoring and Reporting Plan that includes protections for raptor and migratory bird nests, sensitive plants, and wildlife. Additionally, the project adheres to TRPA Code section 61.3.7 for old growth protection and requires archaeological monitoring during ground-disturbing activities to protect historical and tribal cultural resources. Scott Cecchi serves as the Project Manager for the California Tahoe Conservancy.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Van Sickle Bi-State Park Safety and Equitable Access Improvements Project
Solicitation # 2009042033
The Van Sickle Bi-State Park Safety and Equitable Access Improvements Project, managed by the California Tahoe Conservancy and the Department of General Services, focuses on enhancing accessibility and infrastructure within a 15-acre area of the park in South Lake Tahoe, El Dorado County. This phase three project involves the construction of approximately 0.4 to 0.5 miles of Class 1 paved shared-use trails and unpaved hiking trails to connect the California day-use area to the park entrance and the state line monument. Additional deliverables include a new entrance plaza, two picnic areas with amenities, and the paving and upgrading of an unpaved parking lot to include stormwater facilities and snow storage for winter operations. All improvements must align with the Conservancy's 2018 ADA Self-Evaluation and Transition Plan to ensure equitable pedestrian and bicycle access. The project is subject to strict environmental and cultural compliance measures under CEQA and TRPA regulations. Key requirements include the implementation of a Stormwater Pollution Prevention Plan (SWPPP) and an Invasive Species Prevention and Management Plan featuring clean-equipment protocols to prevent the spread of noxious weeds. Biological protections require pre-construction nesting bird surveys from March to August and protocol-level special-status plant surveys by qualified botanists. Furthermore, archaeological surveys must be conducted by a qualified archaeologist and a member of the Washoe Tribe. In the event of a cultural discovery, work must cease within 100 feet of the find until the Conservancy and the Washoe Tribe provide direction for protection or preservation.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS