Upper Mill Creek Dam Temporary Fish Ladder Extension Project

Forecast
5A52CR00256State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Upper Mill Creek Dam Temporary Fish Ladder Extension Project aims to restore critical passage for special status salmonids by constructing a temporary extension to an existing fish ladder that has been compromised by undermining. The solution involves installing three new fish ladder cells using a custom-fabricated steel tubing frame wrapped with chain-link fencing, designed to conform to the natural contours of the streambed. This structure will be stabilized by ballasting it with native rock sourced from onsite stockpiles relocated after the 2024/2025 high flow events. Once filled with rock, a steel plate will be secured over the top to form a unified, flood-resistant base, upon which wooden fish ladder panels will be mounted. These wooden components are engineered to detach during high flow events to prevent structural damage and will be reinstalled once water levels recede, ensuring the system remains functional and adaptable to dynamic stream conditions. The project is being managed by the Regional Water Quality Control Board, Region 5 - Redding, under the oversight of Senior Environmental Scientists Lynn Coster and Adam McKannay. All work will be performed manually to minimize disturbance to the surrounding environment, and the temporary nature of the structure reflects a designed balance between immediate ecological needs and long-term resilience. The use of locally sourced materials and a detachable wooden panel system reduces environmental impact while allowing for seasonal maintenance and flood recovery. The project is forecasted with a posted date of June 18, 2026, and will be implemented in California, specifically in the vicinity of Upper Mill Creek.

General Info

Temporary fish ladder extension using steel, rock ballast, and detachable wood panels to restore salmon passage in Upper Mill Creek.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Adam McKannaySenior Environmental Scientist

Full Description

Show more
The Project will construct a temporary extension of an existing fish ladder that is currently undermined and unable to pass critical runs of special status salmonids. Three more fish ladder cells will be created using a temporary structure that will be installed by hand. The extension will consist of a steel tubing frame with chain-link fencing attached between the frame members, custom fabricated to fit the streambed and designed to be held in place using native rock as ballast. Once it’s full of rock, a steel plate will be placed over the top of the frame to create a single solid object that can handle flood flow events. Wooden fish ladder panels will be placed on top of the steel plate to complete the work. The wooden fish ladder cells will be designed to break away from the steel plate during flooding events and replaced when flows reduce. The rock ballast used for this project will be taken from onsite stockpiles that were removed from the canal following the high flow events of 2024/2025.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS