Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Lake Morena Park Parking Lot ADA Improvements

Forecast
Lake Morena Park Parking Lot ADA Improvements-NOE_signedState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at Lake Morena Park in Campo, California, involves ADA accessibility improvements to enhance access to the ranger office and museum, focusing on the installation of an ADA-compliant parking space and a concrete pathway connecting the parking lot to the buildings. The existing porch will be extended to match the elevation of the door thresholds, ensuring barrier-free entry in compliance with the Americans with Disabilities Act. The work is classified as a minor public improvement under California Environmental Quality Act (CEQA) categorical exemptions Sections 15301, 15303, and 15304, indicating minimal environmental impact and no need for an environmental review beyond the exemption. The project site is located at 2550 Lake Morena Drive, with inspection and acceptance occurring on-site upon completion of construction. The County of San Diego, through its Department of Parks and Recreation, is the procuring agency and responsible for oversight, with Lorrie Bradley, Senior Environmental Planner, serving as the primary point of contact. There is no publicly available contract value, solicitation number, defined period of performance, or detailed payment or invoicing instructions in the documentation. No federal contract clauses from the FAR are applicable or included, as the project is administered at the state and local level under CEQA. No certifications, socioeconomic data, contract types, or evaluation criteria for contractors have been disclosed, and no formal contract documents, attachments, or delivery terms are present, suggesting this is a planned or forecasted improvement rather than an active solicitation with competitive bidding. The project requires no hazardous material handling, does not affect historical resources or sensitive habitats, and is intended to provide compliance-driven infrastructure upgrades with no expansion of facility use.

General Info

ADA-accessible upgrades at Lake Morena Park including parking, pathway, and porch extension to meet federal standards.

Agency

California → San Diego County

Place of Performance

Buckman Springs Road, CA, 91906

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County
Office AddressN/A
Contacts
Lorrie BradleySenior Environmental Planner

Full Description

Show more
Add ADA accessible parking and pathway to ranger office. Extend existing porch to achieve same elevation as door thresholds to ranger office and museum.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
RFB No. 27-0017 Carver Lake Park - Phase 1
Solicitation # 27-0017
The Columbus Consolidated Government is soliciting bids for the Carver Lake Park Phase 1 project in Columbus, Georgia. The scope of work involves comprehensive site improvements, including demolition, clearing, grubbing, earthwork, and grading. Key deliverables include the construction of access drives, parking areas with permeable pavers, concrete sidewalks, curb and gutter, and a 10-foot-wide multi-use trail. The project also encompasses the development of playground and pavilion areas, improvements to the existing splash pad, fencing, site signage, landscaping, and associated storm drainage and utility improvements. The contract will be awarded to the responsive and responsible bidder submitting the lowest base bid. Qualified bidders must be licensed contractors in the State of Georgia, maintain a permanent place of business, and demonstrate sufficient financial resources and construction experience. The project requires substantial completion within 550 consecutive calendar days, with final payment readiness by 580 days. Successful bidders must provide performance and payment bonds totaling 100 percent of the contract amount. The project mandates strict adherence to various federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and the Anti-Kickback Act, while emphasizing a preference for qualified local labor and businesses.
Columbus Consolidated Government

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Cheshire Park Adaptive Turf Field
Solicitation # 2627-03
The Town of Cheshire is soliciting competitive bids for the Cheshire Park Adaptive Turf Field project (ITB #2627-03) in Connecticut. This project utilizes the AIA Document A101-2017 Standard Agreement and requires a lump sum base bid, with optional alternates for field lighting, a scoreboard, dugout shelters, a batting cage, and a turf groomer. Sealed bids must be submitted in opaque envelopes—including one original, one copy, and one electronic copy on a USB drive—to the Department of Public Works and Engineering by 11:00 AM on December 1, 2026. Bids must be signed by a principal officer or owner and include a bid bond or certified check for 5% of the bid amount for contracts exceeding $50,000. The scope of work involves comprehensive site development, including grading, utilities, and sediment and erosion controls, supported by geotechnical and topsoil analysis. Technical requirements include a 25-year warranty on light levels and strict adherence to IESNA RP-6-22 for illumination measurements. Contractors must comply with prevailing wage laws, the Americans with Disabilities Act, and state set-aside requirements for minority and women-owned businesses. Quality control is rigorous, requiring specific handling and storage of coated reinforcing steel and mandatory field density testing. Project administration is overseen by the Town Engineer and the Director of Public Works, with payments processed using EJCDC Form No. C-620.
DAS Procurement

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Three Lakes Park Stream Restoration
Solicitation # 26-3028-11EAR
The Three Lakes Park Stream Restoration project, solicitation number 26-3028-11EAR, is an invitation for bids to restore approximately 1,520 linear feet of an unnamed tributary to Upham Brook in Henrico County, Virginia. The project utilizes a Priority 2 restoration approach, which involves constructing a new bankfull channel within a newly excavated lower floodplain bench, designed as a low sinuosity C3/C3b type channel. Key technical requirements include the installation of wood and rock structures for grade control, the planting of native vegetation to stabilize banks, and adherence to the 2024 General VPDES Permit for Discharges of Stormwater from Construction Activities. The contractor must possess a Virginia Contractor’s License Class A and be a registered contractor in the Commonwealth of Virginia. The contract is a unit price agreement with a performance period of 365 calendar days from the written Notice to Proceed. Bids must be submitted via the ProcureWare portal by 3:00 PM on December 16, 2026, and must include a bid bond, cashier's check, or certified check for 5% of the Total Unit Price Base Bid. Award will be granted to the lowest responsive and responsible bidder. Required documentation includes a bid signature sheet, business category classification, and Virginia State Corporation Commission registration. A non-mandatory pre-bid meeting and site visit are scheduled for December 2, 2026, at the Purchasing Division Office.
Henrico County

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS