Grossmont College Storm Drain Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Grossmont College Storm Drain Repair Project, managed by the Grossmont-Cuyamaca Community College District, involves the replacement of a failed storm drainpipe and a degraded concrete drainage ditch in El Cajon, California. Located in the southeastern corner of the campus between Grossmont College Drive and State Route 125, the project focuses on restoring the site to pre-failure conditions. The scope of work includes excavating the site, removing approximately 1,130 cubic yards of sediment, installing a new pipe within the slope, and backfilling with imported soil and removed sediment. All structures will be replaced in-kind with no new permanent features. The project is subject to strict environmental and regulatory requirements, including the procurement of permits from the California Department of Fish and Wildlife and the Regional Water Quality Control Board. To protect biological resources, specifically inland scrub oaks and Nuttall's oaks, the project mandates oak tree avoidance and the use of a qualified biologist to monitor the installation of temporary construction fencing and silt fencing. Land disturbances must occur outside the bird breeding season, specifically between September 16 and January 14. Following construction, the site must be restored and revegetated according to a detailed plan, featuring a 120-day plant establishment period followed by up to five years of maintenance and monitoring to ensure successful habitat rehabilitation.

General Info

Grossmont College to repair storm drain in El Cajon, California, with procurement set for June 2026.

Agency

California → Grossmont-Cuyamaca Community College District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Grossmont College Drive and Admin Drive, El Cajon, CA, 92020

Set-Aside

NONE

Documents

(1)

Grossmont College Storm Drain Repair Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Grossmont-Cuyamaca Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Grossmont-Cuyamaca Community College District
Office AddressN/A
Contacts
Angelo PellegriniAssociate Vice Chancellor

Full Description

Show more
The project consists of the replacement of a failed storm drainpipe and restoration of the surrounding site to pre-failure conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS