Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Riprap Lining and Outfall Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26-422DNR-MINES-B-54946.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AML 2409 Kickapoo Valley Coal Dam

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 15 documents on the prime contractFrom AML 2409 Kickapoo Valley Coal Dam
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → MINESMINERALS422 - Office of Mines and Minerals
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs riprap for prime contractors on IDNR dam reclamation projects. Places and grades riprap stone to prevent erosion in the emergency spillway swale and the outfall chute per IDOT Standard Specifications. Delivers a riprap-lined emergency spillway swale and outfall chute.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Illinois → MINESMINERALS422 - Office of Mines and Minerals

Same awarding agency

NAICS: 237990
New
SLED
AML 2409 Kickapoo Valley Coal Dam
Solicitation # 26-422DNR-MINES-B-54946
Solicitation 26-422DNR-MINES-B-54946 is an Invitation for Bid issued by the Illinois Department of Natural Resources, Office of Mines and Minerals, for the reclamation of the Kickapoo Valley Coal Company Dam located in Peoria County, Illinois. The scope of work involves clearing and earthwork to reclaim an existing dam and modify the Landfill Entrance Dam. Key deliverables include the construction of a concrete pipe principal spillway, a riprap lined emergency spillway swale, a riprap lined outfall chute, the replacement of the dam crest roadway, the construction of a haul road dam, and the establishment of a wetland with a perimeter walking trail. All work must adhere to strict quality standards, including ASTM C361 and ASTM C969-24, with zero allowable leakage permitted during a 24-hour test period for the box culvert installation. The contract will be awarded to the lowest priced responsive and responsible bidder. Bidders must submit pricing via the Quote Items Tab on BidBuy and provide several required documents, including a Vendor Disclosure, Offer to the State of Illinois, BEP Utilization Plan, a 5% bid bond, and a PLA Contractor and Subcontractor Letter of Assent. A performance bond is required from the awarded vendor prior to contract execution. The project mandates compliance with prevailing wage laws and the Buy America preference for infrastructure materials. There is no specified set-aside status for this solicitation.
Other Heavy and Civil Engineering Construction

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS