Riverbank Army Ammunition Plant Specific Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aemetis Carbon Capture project involves the drilling of a stratigraphic test well, identified as Aemetis Riverbank #1, located at the Riverbank pad within the northeast quadrant of the Riverbank Army Ammunition Plant in Stanislaus County, California. Approved by the California Department of Conservation Geologic Energy Management Division, the primary objective is to deepen the well from the existing conductor to collect subsurface geology data. This data will be used to evaluate the site's feasibility for future carbon storage, though any subsequent storage activities will require separate permitting through the EPA’s Class VI UIC program. The project is classified as light industrial activity by the City of Riverbank and is consistent with current zoning. Well construction and drilling operations are expected to last approximately two months. The project will utilize existing gravel access roads and a well pad, with the only permanent onsite facility following completion being the wellhead. To mitigate environmental impacts, a 24-foot-high sound barrier wall will be implemented to protect nearby residences from noise. Water for operations will be sourced from existing wells within the Riverbank Industrial Complex, and an estimated 280 tons of tailings will be disposed of at a nearby non-hazardous waste landfill. The project is subject to CEQA compliance, with an adopted Mitigation Monitoring and Reporting Plan and specific mitigation measures made a condition of approval.

General Info

Aemetis will drill a test well in California to evaluate carbon storage feasibility.

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

Riverbank, CA

Set-Aside

NONE

Documents

(1)

NOD 713372 Aemetis Carbon Capture Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts3 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Maggie HarringtonAssociate Governmental Program Analyst
Joshua MannDirector of Community Development

Full Description

Show more
The proposed vertical well (Aemetis Riverbank #1) will be a stratigraphic test well to collect data on subsurface geology. This project includes only the completion of the initial well to provide data that will help determine whether the site is a feasible location for future carbon storage and to plan for that storage. The objective is to deepen the well from shoe of the existing conductor. The well would be drilled at the Riverbank pad located in the northeast quadrant of the Riverbank Army Ammunition Plant (RAAP) property. If the site is determined to be suitable, permitting of any future carbon storage activity will be a separate activity, principally through EPA’s Class VI UIC program. Well construction and drilling activities will last approximately two months. A gravel access road and well pad already exist at the site, and no additional road construction is necessary. The well conductor has also already been installed. Additional temporary facilities include moving a drill rig to the well pad, generators, trailers for the well site crew, and a closed loop mud system. The only permanent onsite facilities after drilling operations are complete will be the wellhead (in addition to the already existing well pad and gravel access road). Noise reduction during drilling will include the use of a 24-foot-high sound barrier wall to protect the single residence to the north of the site. Nine standard 53-foot-long 18 wheelers will deliver the necessary rig equipment and drill pipe/casing to the site. The equipment is designed to stand on its own. Rig setup will require two days. Four to six fluid storage tanks will be delivered and remain at the site for water and mud storage during drilling operations. An additional two roll-off storage tanks will be delivered and remain at the site for tailings storage. Three RV-type trailers will remain at the site throughout the construction for on-site personnel offices. Daily traffic to and from the site will include approximately 15 standard pickup trucks per day for personnel working shifts on the rig (10-mile route), two to four standard pickup trucks per day for tool and other maintenance services (30-mile route). On average, one mud delivery truck per day for 10 days will arrive on site (240-mile route). About sixteen trucks will be used to dispose of tailings with a 60-mile route for each truck. On average, seven cement trucks will arrive on site for well cementing operations over two days (160-mile route) when installing the surface casing. Water for activities at the site will be obtained from Riverbank Industrial Complex existing wells. A maximum one acre-foot of water (< 200,000 gallons) will be obtained for the well site operations. This water will be moved within the property by an 8,000-gallon water truck. All tailings material generated during drilling is estimated to be 280 tons and will be sent to solids disposal at a nearby non-hazardous waste landfill. The location is at the Riverbank Industrial Complex in the city of Riverbank, Stanislaus County, California. Section: 31, Township 2S, Range 10E, Mt. Diablo. It is in a field off of Claus Road and Kentucky Avenue, in the northeast corner of the Riverbank Industrial Complex. The environmental setting is described in detail in the EIR and Addendum. The project site is within the Riverbank Industrial Complex. There are no habitable structures within 300 feet of the well site. The site is surrounded by agricultural land to the north and east. To the west, at a distance of approximately 1,300 feet, there are residential areas. The City of Riverbank has indicated the construction and well drilling activities are considered light industrial activity. This falls within the current zoning and does not require a conditional use permit. The City of Riverbank has already issued a grading permit to construct the access road and well pad, and a noise permit to allow for 24-hour drilling operations. The project activity(s) being permitted by the California Geologic Energy Management Division (CalGEM) is within the scope of the Riverbank Army Ammunition Plant Specific Plan Addendum to the Environmental Impact Report. CalGEM, as the CEQA Responsible Agency, approved permit(s) for Aemetis Carbon Capture, Inc. to drill the well listed below, in Stanislaus County. API #: 0409920056 Well Name: Aemetis Riverbank CO2 1 Latitude : 37.72221400 Longitude : -120.91767400

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS