Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Riverbend Water System Improvements GMP 1

Active
6aad5bb71a0be96dfd9d8dffState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Riverbend Water System Improvements GMP 1 project, managed by The Haskell Company for the Riverbend Water Resource District, is currently seeking bids for various raw water intake and transmission components. The scope of work includes environmental controls, survey and layout, clearing and grubbing, site grading, tunnel excavation support, and cofferdam installation, as well as early material procurement for pipes and valves. All proposals and technical inquiries must be submitted electronically through the BuildingConnected platform by October 30, 2026, at 2:00 PM Central Time. A non-mandatory pre-proposal meeting and site visit will take place on October 13, 2026, starting at 9:00 AM at the Hilton Garden Inn Texarkana Convention Center, followed by a visit to the project site at Wright Patman Lake. This project is funded in part by the Texas Water Development Board, requiring compliance with all applicable federal and state regulations. There is a strong emphasis on the participation of DBE, MBE, WBE, and HUB certified businesses to ensure diverse opportunities in the performance of these contracts.

General Info

Haskell seeks bids for Riverbend Water System improvements by October 30, 2026.

Agency

Texas → Riverbend Water Resource District (RWRD)View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Frisco, TX, 75034, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Riverbend Water Resource District (RWRD)
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → Riverbend Water Resource District (RWRD)
View Agency Profile
Office AddressN/A

Full Description

Show more
This project will be bid through the Haskell Company's Building Connected site. See below link to Building Connected for all documents and information. Response Due 10/30/2026 for this advertisement are for GMP #1. Contract documents, procurement packages, and addenda will be available through “BuildingConnected”. See Project Link Below: The Haskell Company Public Plan Room Questions and Requests for Information All questions regarding the technical, managerial, or contractual requirements of this procurement shall be submitted electronically through “BuildingConnected”. CMAR Contact Information: The Haskell Company Ryan Aldrich, Preconstruction Manager ryan.aldrich@haskell.com 2591 Dallas Parkway, Suite 600 Frisco, Texas 75034 Sealed proposals will be received until: Date: October 30, 2026 Time: 2:00 PM Central Time Proposals received after the deadline stated will not be considered. Location/Submission Method: “BuildingConnected” Bid Packages Included with GMP #1 are as follows: #G1-01-A RAW WATER INTAKE SWPPP/ENVIRONMENTAL CONTROLS #G1-01-D RAW WATER INTAKE SURVEY & LAYOUT #G1-02-B RAW WATER INTAKE CLEARING & GRUBBING INCL DISPOSAL #G1-31-A RAW WATER INTAKE SITE GRADING & ACCESS ROAD #G1-31-B RAW WATER INTAKE TUNNEL & EXCAVATION SUPPORT SYSTEMS (SHAFT) #G1-31-C RAW WATER INTAKE COFFERDAM & PORTAL WALL #G1-33-A-P* RAW WATER TRANSMISSION RWT PIPE EARLY PROCUREMENT (MATERIAL ONLY) #G1-33-B-P* RAW WATER TRANSMISSION RWT VALVES EARLY PROCUREMENT (MATERIAL ONLY) KEY: #G1 = GMP1 / 01 = DIVISION OF WORK / A= SUB PACKAGE / P* = MATERIAL PROCUREMENT ONLY Pre-Proposal Meeting: Attendance is non-mandatory but highly encouraged. The Pre-Proposal Meeting will be conducted on Tuesday October 13, 2026, at 9:00 a.m. local time at the Hilton Garden Inn Texarkana Convention Center, 4610 Cowhorn Creek Road, Texarkana, TX 75503 A project presentation and refreshments will be held from 9:00am to 11:00, followed by a site visit to the GMP #1 project location from 12:00 PM to 1:00PM. The site location is on Wright Patman Lake at the intersection of Poor Boy Road & Cotton Ford Road. https://maps.app.goo.gl/ZzaYy8khQnzdjxjg6 Equal Opportunity and TWDB Funding Requirements: This Project is expected to be funded, in whole or in part, by financial assistance from the Texas Water Development Board (TWDB) . Neither the State of Texas nor any of its departments, agencies, or employees is or will be a party to this solicitation or any resulting contract. Procurement and contracting activities shall comply with all applicable federal, state, and TWDB requirements. The CMAR and Riverbend Water Resource District encourage participation by Disadvantaged Business Enterprises (DBEs), Minority Business Enterprises (MBEs), Women Business Enterprises (WBEs), small businesses, and historically underutilized businesses (HUBs) . Firms are encouraged to take all necessary affirmative steps to ensure that such businesses are afforded the maximum practicable opportunity to participate in the performance of contracts financed as a whole or in part with TWDB assistance. The Riverbend Water Resource District and The Haskell Company reserve the right to reject any or all proposals and to waive informalities or irregularities in the procurement process to the extent permitted by law.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional construction requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project also encompasses critical civil and site work, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS