Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Road Bond Paving - Minton Road And Waco Boulevard

Closed
24-0-2024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334290
New
DIBBS
INTERFACE UNIT, COMMUNI
Solicitation # SPE4A7-27-T-2289
Solicitation SPE4A7-27-T-2289 is a request for quotations issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of three interface units for communication equipment, identified by NSN 5895-01-739-0196. The requirement specifies parts from Watlow Electric Manufacturing Co (P/N 2292-6980 and PM6C1CJ-ARAAVWP). Delivery is required within 146 days after order, with a need ship date of April 1, 2027, and an original required delivery date of August 13, 2027. The items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the destination. Quality assurance follows MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for sample lots under MIL-STD-105/ASQ Z1.4. Administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing and payment. The solicitation incorporates several federal regulations, including the Buy American and Balance of Payments Program, DFARS cybersecurity reporting requirements, and prohibitions on covered telecommunications equipment. Award may consider the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 21 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves comprehensive roadway improvements along Minton Road from Malabar Road to Jupiter Boulevard and Waco Boulevard from Emerson Drive to Babcock Street within the City of Palm Bay, Florida. Key tasks include full depth reclamation (FDR) with 12 inches on Minton Road and 8 inches on Waco Boulevard, followed by paving with 3-inch and 2-inch layers of Type SP 12.5 asphalt, respectively. Construction encompasses all incidental work such as surface priming, minor concrete removal, utility adjustments, landscaping, sidewalk and curb repairs, drainage work, traffic signal loop installation, ADA compliance features, traffic control, and striping. Night-time paving is mandated for both streets to accommodate high traffic volumes, with daytime FDR operations and coordination for partial or full street closures, including detours and overtime inspection costs. The project also requires the use of specific paving equipment, such as shuttle buggies or Material Transfer Vehicles, and traffic rollers, ensuring minimal disruption to nearby school activities. The FDR mix design specifies the percentages of emulsion and cement, with provisions for additional millings if needed, which the City will supply and the contractor will haul. Resident notification via door hangers is mandatory prior to work commencement, and the contractor must document existing conditions through photos and videos. The scope covers a broad range of activities, including mobilization, erosion control, testing, pavement marking, signage, utility coordination, and adherence to FDOT-approved materials and specifications. The contract is managed by the City of Palm Bay, with a response deadline of March 5, 2024, and is posted under solicitation number 24-0-2024.

General Info

Agency

Florida → City of Palm Bay

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Palm Bay
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → City of Palm Bay
Office AddressN/A
Contacts
Susan Ziegler

Full Description

Show more
The project will consist of Full Depth Reclamation (FDR) and pavement treatment for Minton Road from Malabar Road to Jupiter Blvd and for Waco Blvd from Emerson Drive to Babcock Street within the City of Plam Bay. The roadway treatment shall include the following:
• 12” Full Depth Reclamation (FDR) for Minton Road • 8” Full Depth Reclamation (FDR) for Waco Blvd • 3” Type SP 12.5 Paving Minton • 2” Type SP 12.5 Paving Waco
Construction shall include all incidental work items to be performed as per the construction plans to include FDR operation, priming surface, paving, minor concrete removal, utility riser adjustments, spray herbicide, edge grading, sodding, sidewalk, curb repairs, minor drainage and inlet repair, traffic signal detection loops, ADA detectable warning matts, traffic control MOT, temporary striping and final thermoplastic striping and pay quantities provided for each shown in the bid documents. The selected contractor shall furnish and install all construction work identified on the plans and per the specifications identified herein.
Special condition of night-time construction work for both Minton Road and Waco Blvd required to perform the paving operation. Due to high traffic volume and safety for the public and workers, the paving operation will be performed at night from 8 pm to 6 am Monday through Friday. The FDR operation will be constructed during the daytime and City inspection staff will coordinate with the contractor on MOT detours for partial street closures along Waco Blvd for the FDR operation and full street closure for the Minton Road FDR operation. The bid shall include the cost for any over-time hours for inspections at night as part of the MOT bid item.
The paving operations on Minton Road and Waco Blvd shall include a shuttle buggy or Material Transfer Vehicle (MTV) and the paving operation will include a traffic roller or pneumatic asphalt roller. The contractor shall coordinate construction work to not impact Columbia Elementary School parent drop-off and pick-up operation.
For the FDR mix design, the percent of emulsion and cement for each street is shown below in the table. If the roadway requires additional millings due to deficient asphalt pavement thickness, the City shall provide the added millings. Contractor will be required to load truck and haul the millings to the project streets. Any needed millings for FDR roadway operation will be transported for the City’s available pile of millings location at the PW compound site.
Street % Emulsion % Cement 1 Waco Blvd 3.1% 1.6% 2 Minton Road 3.1% 1.6%
Contractor shall notify residents prior to start of work by placing door hangers on each home. The cost to produce and place hangers is the responsibility of contractor. Contractor shall also coordinate with inspection staff on any lane closures and MOT. Contractor shall video street and take photos of driveways in advance of any work.
While not intended to be an all-inclusive list, work generally includes the following items: mobilization, erosion control, testing of all items per FDOT requirements and bid specification, paving, millings transported to the site, shoulder restoration, edge grading, herbicide spraying, crown slope correction, minor drainage and inlet repair, temporary and final thermoplastic striping, pavement markings, reflective pavement markers, sodding, utility coordination/adjustment, traffic signal detection systems coordination, maintenance of traffic plan preparation/submittal/approval and coordination with City staff, maintenance of traffic notification, and regular progress meeting attendance. All materials to be furnished on the project shall be FDOT approved materials or from an approved FDOT mine. The selected contractor shall provide all material and shop submittals for review and approval to the City as part of the construction.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS