Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Road Ecologist Design Services for “US Highway 36 Corridor, Safety For All”

Closed
RFP-206-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
General Environmental Consulting
Solicitation # port-of-houston-authority-1256317
The Port of Houston Authority is seeking an environmental consultant to provide technical expertise and field assistance to its Environmental Affairs Department on an as-needed basis. The scope of work includes environmental planning and permitting involving NEPA, the Clean Water Act, and the Rivers and Harbors Act, as well as conducting field studies, inspections, environmental site assessments, and asbestos and mold consulting. Additionally, the consultant will be responsible for developing and updating Spill Prevention, Control, and Countermeasure plans and ensuring compliance with the Lead and Copper Rule. This is a Request for Competitive Sealed Proposals for a contract with an initial two-year term. Proposals must be submitted via the Workday eProcurement system by November 11, 2026, at 11:00 a.m. The selection process is based on best value, with evaluation weights assigned to reputation and qualifications (35%), purchase price (30%), quality of goods and services (30%), and small business participation (5%). Respondents must provide fully burdened hourly labor rates that remain firm for the duration of the project, though laboratory costs are excluded. Required submissions include a proposal narrative limited to 15 pages, an appendix of resumes and certifications, a response form, and a conflict questionnaire. Awardees must adhere to strict confidentiality regarding pollutants and contaminants and comply with the Texas Public Information Act.
Port of Houston Authority

POSTED

about 6 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Boulder County Parks and Open Space Department, in partnership with the Community Planning and Permitting Department, is seeking proposals from qualified consultants to provide specialized expertise in Roadway Ecology for the North Foothills Bikeway Preliminary Design Process. The project involves designing a new, durable, multi-use bikeway within the US 36 corridor, which will be separated from the highway and accessible year-round. The initiative emphasizes a comprehensive Safety-for-All approach, integrating considerations for vehicles, cyclists, pedestrians, and wildlife, with a focus on minimizing ecological impacts and facilitating wildlife movement across the bikeway. The selected consultant will be responsible for identifying and recommending features and structures that support wildlife connectivity and mitigate habitat disruption during and after construction. The solicitation, titled "Road Ecologist Design Services for US Highway 36 Corridor, Safety For All," was posted on September 19, 2025, with a response deadline of October 15, 2025. The project budget ranges from $500,000 to $1,500,000, and the procurement process is managed by Boulder County’s Procurement Office. Interested firms are encouraged to submit their proposals through the county’s designated platform and may contact the procurement office via email for questions. Additionally, the county emphasizes its commitment to accessibility and equal opportunity, aligning with the Americans with Disabilities Act. The procurement process also includes a sustainability assessment, requiring vendors to demonstrate environmentally responsible practices and policies as part of their submission.

General Info

Place of Performance

CO, USA

Set-Aside

NONE

Documents

14

7-11 Evaluation Criteria

PDF, High priority: read this firstevaluation-criteria
High

Attachment F - Purchase Order Terms and Conditions

PDF, High priority: read this firstcontract-document
High

Exhibit A - Insurance Requirements: Road Ecologist Design Services

PDF, High priority: read this firstspecifications
High

IRFP 4038-24-2 North Boulder County Wildlife Crossings Study

PDF, High priority: read this firstrfp
High

North Foothills Bikeway Preliminary and Final Design RFP

PDF, High priority: read this firstrfp
High

RFP 206-25 Addendum #1

PDF, High priority: read this firstamendment
High

RFP-206-25 North Foothills Bikeway Roadway Ecology Services

PDF, High priority: read this firstrfp
High

RFP Pricing Proposal Template

PDF, High priority: read this firstrfp
High

US 36 Wildlife Crossings Assessment, Prioritization and Cost Estimation Study

PDF, High priority: read this firstspecifications
High

Boulder County Confidential and Sensitive Information Sharing Agreement

PDF, Low prioritynda
Low

Boulder County Services Sample Contract

DOCX, Low prioritycontract-document
Low

Boulder County Sustainability Questionnaire

PDF, Low priority5 pages · other
Low

Boulder County Vendor Information Form

PDF, Low priority1 page · other
Low

Eastern Slope and Plains Wildlife Prioritization Study

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Boulder County
Contacts1 person available
OfficeCO, USA
Organization / AgencyColorado → Boulder County
Office AddressCO, USA
Contacts
Boulder County Procurement

Full Description

Show more
The Boulder County Parks and Open Space (BCPOS) Department in collaboration with the Boulder County Community Planning and Permitting (CPP) Department is seeking proposals from qualified and experienced consultants to provide expertise in Roadway Ecology during the North Foothills Bikeway Preliminary Design Process (Bikeway). Currently, the Bikeway preliminary and subsequent final design process is commencing, with the objective of designing a new, hard-surfaced, multi-use bikeway within the US 36 corridor but separated from the highway, that can be maintained year-round. Boulder County is considering the US 36 corridor from the City of Boulder to the Town of Lyons as a Safety-for-All concept, which includes vehicles, bicyclists, pedestrians, and all types of wildlife. The objectives of incorporating Road Ecologist expertise are to mitigate or avoid impacts to wildlife movements, at both large and small scales, due to the eventual construction of the Bikeway. Additionally, the County is seeking expertise in facilitation of wildlife movement across the bikeway itself with recommended features and structures.
If you have any questions about the Boulder County procurement process, please email contact@example.gov.

[Americans with Disabilities Act and Equal Opportunity Notice](https://bouldercounty.gov/government/ada-eeo-notices/)

More opportunities from Colorado → Boulder County

Same awarding agency

NAICS: 541611
New
SLED
Grants Consultant for Public Health
Solicitation # PHI-005-26
Boulder County Public Health is seeking a qualified consultant for solicitation PHI-005-26 to support its public health funding strategy. The selected consultant will be responsible for identifying grant opportunities, developing high-quality and competitive grant applications, and creating reusable grant-development tools. The scope of work includes reviewing and enhancing existing applications, managing development timelines, and providing strategic input to maximize funding outcomes. The initial engagement is anticipated to last six months, with a maximum budget of 50,000 dollars and an option for extension based on performance and funding. The consultant is required to work on-site one day per week, with the remainder of the work performed remotely. The selection process will be conducted by a committee using a scoring matrix of 190 possible points, evaluating vendor qualifications, proposed methodology, and total cost. The contract is subject to federal grant compliance, including the U.S. Department of Treasury's Title VI regulations and the Davis-Bacon Act. Key requirements include adherence to Colorado accessibility standards for all work products and the provision of bid, performance, and payment bonds. Invoicing must be submitted by the 15th of each month with detailed itemization of labor and materials. Final payment is contingent upon the satisfactory completion of all work as determined by Boulder County Public Health.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Boulder Canyon Trail Repair Project
Solicitation # BID-326-26
Boulder County Parks and Open Space Department is soliciting proposals under solicitation BID-326-26 for the repair and reconstruction of a damaged segment of the Boulder Canyon Trail and its associated creekside slope protection wall. Located downstream of the intersection of HW 119 and Fourmile Canyon Drive, the project addresses significant scour that created a subsurface void beneath the trail surface and compromised the slope containment structure. The scope of work includes constructing a grouted boulder slope protection wall, restoring the trail approach to its pre-scour condition, reclaiming disturbed areas with native seed mixes, and ensuring the protection of two City of Boulder high pressure water lines. To maintain public access during construction, the contractor is required to operate a courtesy shuttle for pedestrians and cyclists. The project is expected to begin between December 2026 and January 2027. Award decisions will be based on the best value to the County and the determination of whether the firm is a responsible contractor via a Qualification Statement. Requirements include the submission of bid, performance, and payment bonds each equal to 100 percent of the proposed cost, as well as compliance with Davis-Bacon prevailing wage documentation and ADA standards. Technical specifications align with AASHTO, CDOT, and USDOT/FHWA guidelines. Final acceptance is contingent upon a joint inspection by the contractor and engineer and the completion of a deficiency punch list. Invoices must be submitted by the 15th of each month for work performed in the prior month.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS