Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Road Maintenance and Traffic Control

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Bly, OR, 97622, USA

Set-Aside

SBA

Documents

This scope was carved out of 12363N26Q4181.

The full solicitation package (17 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs maintenance on forest roads and traffic control for prime contractors on US Forest Service logging operations. Utilizes graders and excavators for road maintenance and deploys traffic control signage and flagging equipment per the Traffic Control Plan and B6.33 Safety specifications. Delivers maintained road access and safe traffic flow during operations.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
S50236 Pavement Repairs at Various Locations at Hilo Harbor
Solicitation # S50236
The State of Hawaii Department of Transportation is soliciting bids for Project No. S50236, which involves providing all labor, materials, and equipment for as-needed asphalt pavement repairs at various locations within Hilo Harbor on the Island of Hawaii. The scope of work includes mobilization, replacing subbase, installing triaxial geogrids, and performing various types of repairs (Types A through F) ranging from 200 to 10,000 square yards. All work must adhere to the 2016 General Provisions for Construction Projects and specific material standards, including AASHTO M 332 for PG Binder and FHWA MUTCD guidelines for pavement markings. Permanent striping must be applied between seven and fourteen days after pavement completion. The contract is awarded to the lowest responsible bidder based on the total amount for comparison, with a five percent evaluation preference available for qualified Hawaii bidders. The initial term is twelve months from the Notice to Proceed, with the state holding the option to extend for two additional twelve-month periods, not to exceed a total of thirty-six months. Contractors must commence work within fourteen calendar days of notification. Required submissions include a surety bid bond, and the successful awardee must provide performance and labor and material payment bonds. Compliance with prevailing wage laws, apprenticeship program certifications, and strict harbor security protocols is mandatory. Proposals must be submitted electronically via HIE.PRO by the deadline of November 6, 2026.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Agriculture → Stewardship Contracting Branch Usda-Fs

Same awarding agency

NAICS: 113310
New
Federal
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon
Solicitation # 12363N26Q4181
Solicitation 12363N26Q4181 is a request for quotation for the Corral G-Z Integrated Resource Stewardship Contract within the Bly Ranger District of the Fremont-Winema National Forest in Oregon. This small business set-aside project utilizes a G to Z model to restore forest health and mitigate catastrophic wildfire risks by reverting stand density and species composition to historical ranges of variability. The scope of work includes professional forestry services such as harvest layout, timber marking, and cruising, as well as the commercial harvest and removal of approximately 191,379 tons of timber across 7,000 acres and fuels reduction on 17,000 acres. Specialized tasks include whole tree yarding, release cuts in whitebark pine stands, and the removal of encroaching conifers in meadows and old growth areas. The government will award a firm-fixed price contract based on a best-value tradeoff decision, evaluating technical approach, relevant past performance from the last three years, and benefits to the local community within 60 miles of Bly, Oregon. The period of performance extends from the date of award through November 1, 2031, with all work required to be complete by October 31, 2031. Contractors must adhere to strict technical specifications for aquatic resource protection, road maintenance, and traffic control, while implementing a quality control system where payments are tied to an acceptable quality level of 85 percent or higher. Quotes must be submitted as separate technical and price proposals by November 16, 2026.
Logging

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 113310
Federal
End of the World Long Term Stewardship
Solicitation # 12363N26R4016
Solicitation 12363N26R4016 is a Request for Proposal for the End of the World G-Z Long-Term IRSC, a stewardship project located on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest in Idaho. The primary objective is to improve stand health and reduce catastrophic wildfire risk by thinning overstocked stands across approximately 50,000 acres, with commercial treatment authorized for over 17,000 acres. A secondary goal is to ensure a steady supply of timber and forest products to local facilities. The project is executed under the stewardship contracting authority of Section 8205 of Public Law 113-79 and aligns with Secretarial Memo 1078-006. The scope of work includes mandatory base activities such as timber cutting, skidding, decking, and hauling, as well as road reconstruction and maintenance. Specific deliverables involve the removal of sawlog and nonsaw timber, reforestation, and erosion control. Technical requirements include adherence to the FP-24 Standard Specifications for roads and bridges, and the use of a Professional Forester for cruise design. The acquisition is unrestricted under NAICS code 113310, and proposals are evaluated based on technical approach, local community benefit, and past performance, with price serving as a secondary factor when technical proposals are substantially equal. Contractors must provide unit pricing for mandatory and optional work activities and are required to furnish performance and payment bonds within 10 days of award. A bid guarantee of 20 percent of the proposed price for mandatory reconstruction is required. Labor standards are governed by the Davis-Bacon Act, and the project includes specific environmental constraints such as riparian habitat conservation area buffers and old growth protection. Proposals must be submitted via email to Mark Phillipp and Matt Daigle by the deadline of November 18, 2026.
Logging

POSTED

9 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS