Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Road Rehabilitation On South Dr. Martin Luther King Jr. Boulevard From Casa Loma To State Route 58

Closed
20260722070State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 10 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The project involves comprehensive road rehabilitation along South Dr. Martin Luther King Jr. Boulevard in Bakersfield, California, from Casa Loma to State Route 58, with work encompassing cold planing 36,504 square yards of existing asphalt, placing 5,165 tons of Hot Mix Asphalt Type A, and installing 23,986 linear feet of thermoplastic striping and 3,545 square feet of pavement markings. Concrete work includes curbs, gutters, and a bus stop pad, alongside adjustments to manholes and storm drains to grade, and the installation of 76 inductive loop detectors for traffic monitoring. The scope also requires developing a water supply, implementing temporary traffic control, and preparing a water pollution control program, with all work governed by the 2025 California Department of Transportation Standard Specifications and custom Special Provisions issued on July 14, 2026. These modifications include updated definitions for key contract terms, electronic signature requirements for submittals, and revised certifications for Disadvantaged Business Enterprise and Small Business participation. All materials must comply with Caltrans testing standards, including gradation, asphalt binder content, and aggregate quality, with acceptance determined solely by the Department’s random sampling at the paver mat, windrow, or plant, and disputes resolved exclusively using Department-retained samples. The contract is administered by the County of Kern through its Public Works Department, with bids submitted in sealed physical envelopes by the August 12, 2026, deadline to a designated location, and no electronic submissions permitted. Bidders must include a bid bond, subcontractor list, non-collusion declaration, certifications, and the County’s Bidders List, with all documents properly bound and sequentially numbered. The bid package references addenda distributed exclusively via the PlanetBids portal, and contractors are obligated to incorporate all addenda into their proposals to avoid rejection. The contract enforces strict organizational conflict of interest rules, prohibiting firms involved in the engineering phase from bidding, and imposes a requirement for contractor registration with the California Department of Industrial Relations. Site conditions are the contractor's responsibility to verify independently, with no recourse for unanticipated subsurface conditions unless they involve undisclosed County-owned utilities. Retention may be substituted with escrowed securities, and payment terms are undefined beyond general compliance and audit rights. No contract value is specified in the bid schedule, as pricing fields remain blank, and no formal evaluation factors, award methodology, or contract

General Info

Road rehab on MLK Blvd in Bakersfield with asphalt, striping, concrete, traffic loops, and pollution controls.

Place of Performance

Bakersfield, CA, 93307, USA

Set-Aside

NONE

Documents

5

Bid Form for Contract No. 25053 - Road Rehabilitation on South Dr. Martin Luther King Jr. Boulevard

PDF, High priority: read this firstbid-form
High

Contract No. 25053 Special Provisions for Road Rehabilitation on South Dr. Martin Luther King Jr. Boulevard

PDF, High priority: read this firstspecial-provisions
High

Kern County Road Rehabilitation Plans Contract 25053

PDF, High priority: read this firstplans
High

Notice to Bidders Contract No. 25053 - Road Rehabilitation South Dr. Martin Luther King Jr. Blvd

PDF, High priority: read this firstnotice-to-bidders
High

Contract 25053 Bid Envelope Label

PDF, Low prioritybid-envelope-label
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Kern
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → County of Kern
Office AddressN/A
Contacts
Public Works Contracts Group

Full Description

Show more
Bid #25053: The project consists of road rehabilitation on South Dr. Martin Luther King Jr. Boulevard from Casa Loma to State Route 58. The work includes, but is not limited to, developing a water supply, temporary traffic control, preparing a water pollution control program, clearing and grubbing, roadway excavation, and finishing the roadway. Major work items involve cold planing 36,504 SQYD of existing asphalt pavement, placing 5,165 tons of Hot Mix Asphalt (Type A), and installing 23,986 LF of thermoplastic traffic stripe and 3,545 SQFT of pavement markings. The project also includes concrete work for curbs, gutters, and a bus stop pad, adjusting manholes and storm drains to grade, and installing 76 inductive loop detectors.

More opportunities from California → County of Kern

Same awarding agency

NAICS: 237310
SLED
Road Rehabilitation On Rosamond Boulevard From State Route 14 To Union Pacific Railroad
Solicitation # 26008
Solicitation 26008 is a construction contract issued by the County of Kern, California, for the road rehabilitation of Rosamond Boulevard from State Route 14 to the Union Pacific Railroad in Bakersfield. The scope of work includes cold planing existing asphalt, paving with hot mix asphalt, and constructing concrete curbs and stamped concrete. Additional requirements involve installing traffic control devices, such as delineators, inductive loop detectors, and lane separation systems, as well as adjusting storm drain manholes and water valves. Due to high traffic volumes, all construction must be performed at night between 7:00 p.m. and 6:00 a.m., with noise levels restricted to 86 dBA at 50 feet. The project must be completed within 45 working days of the contract approval date and must adhere to the 2025 Caltrans Standard Specifications. The contract is federally funded and subject to the Davis-Bacon Act, Buy America requirements, and various non-discrimination statutes, including the Civil Rights Act of 1964 and the Rehabilitation Act of 1973. Bidders must provide a performance and payment bond each for 100 percent of the contract price and submit a comprehensive bid package including a subcontractor list, non-collusion declaration, and EEO certification. Award is based on the identification of the low bid, considering both base and alternate bid prices. Quality assurance for hot mix asphalt is managed through independent, random sampling and testing conducted by the Department and the Kern County Material Lab.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in about 15 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS