Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Road Rehabilitation on South Dr. Martin Luther King Jr. Boulevard

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Kern County Public Works is implementing a road rehabilitation project, identified as Contract No. 25053, located on South Dr. Martin Luther King Jr. Boulevard from Casa Loma Drive to State Route 58 in Bakersfield, California. The primary objective of the project is the construction of a new paved shoulder and general road improvements. The scope of work includes cold planing asphalt concrete, paving with hot mix asphalt and concrete, constructing a bus pad and survey monument encasements, installing inductive loop detectors, and applying thermoplastic traffic stripes and pavement markings. All activities must comply with the Americans with Disabilities Act and the California Fair Housing Act. The project was approved by the Kern County Board of Supervisors on July 14, 2026, and is categorized as exempt under Section 15301(c) of the State CEQA Guidelines as it involves the maintenance and repair of a public road. Administrative oversight is managed by the Kern County Public Works Department, with key personnel including Planner Jose Cisneros, Public Works Manager Yolanda Alcantar, and Director Joshua Champlin. Financial tracking for the project is associated with JV Ledger Account 6050, Cost Center 1786CC, Fund 1348FD, and Spend Category 1101SC. The project is classified under NAICS code 237310.

General Info

Kern County road rehabilitation on S. MLK Blvd, Bakersfield, featuring paving and infrastructure.

Agency

California → Kern County

Place of Performance

South Dr. Martin Luther King Jr. Blvd from Casa Loma Dr to SR 58, Bakersfield, CA, 93307

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts

Full Description

Show more
Kern County Public Works proposes a road rehabilitation project on South Dr. Martin Luther King Jr. Boulevard, from Casa Loma Drive to State Route 58. The work to be performed consists, in general, of the construction of paving hot mix asphalt, cold planing asphalt concrete, constructing survey monument encasements, constructing a bus pad, installing inductive loop detectors, and painting thermoplastic traffic stripes and pavement markings.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

3 days ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS