Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roads, Trails, and Infrastructure Repairs at Lake Red Rock, Saylorville Lake, and Coralville Lake, Iowa- Sources Sought for Potential Blanket Purchase Agreement (BPA)

Closed
W912EK26LAKESFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in about 2 months

General Info

Agency

Department Of Defense → W07V Endist Rock IslandView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Maxwell, IA, 50161, USA

Set-Aside

NONE

Documents

(1)

Sources Sought for Roads, Trails, and Infrastructure Repair in Iowa Lakes

PDFsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-5001, USA
Organization / Agency
Department Of Defense → W07V Endist Rock Island
View Agency Profile
Office AddressROCK ISLAND, IL, 61299-5001, USA
Contacts
Stanley L. Bolton
Ryan R. Larrison

Full Description

Show more

This is a SOURCES SOUGHT and is for informational/market research purposes only. 


THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. 


The U.S. Army Corps of Engineers, Rock Island District, is seeking businesses that has the capabilities to support construction requirement for road, trail, and infrastructure repairs at Lake Red Rock, Coralville Lake, and Saylorville Lake in Iowa and would be interested in being issued a BPA or awarded a contract (MATOC) as part of a pool of contractors to do work at either location.


The Government welcomes industry input in the best way to support this critical requirement for a sustained period, at the highest standard, and for a reasonable price. While still being able to allow for competitive fair opportunity to all interested parties.


Please read the full work description.


NAICS CODE: 237310 Highway, Street, and Bridge Construction


SIZE STANDARD: $45 Million


PSC: Z2QA – Repairs or alteration of restoration of real property (Public or Private)


This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. NO AWARD will be made from this Sources Sought Notice. This is NOT a request for proposals, quotes or invitation for bid. The sole purpose of this notice is to identify potential System for Award Management (SAM) Database registered businesses that are interested in and capable of performing this work.


Companies interested in participating in a BPA or MATOC for this requirement in accordance with the Scope of Work (SOW) must provide documentation to Contract Specialist, Stanley L. Bolton at stanley.l.bolton@usace.army.mil no later than the closing date of this sources sought.


Responses must contain the following documents:


  1. Cover letter with company name, address, UEI code, Cage, Code, Point of Contact (POC) name, POC direct phone number, POC address.
  2. Capability Statement providing information demonstrating the company’s ability to perform construction projects like the requirement.
  3. Past Performance that shows history of current and/or previous contracts for similar construction projects.

See below a condensed scope of the potential work required:


Description of Work:


Coralville Lake  requirement includes, but is not limited to: removal of existing aggregate base, preparation of existing aggregate base, preparation of existing bituminous surfacing/aggregate base for use as new base course, compacted aggregate base, asphalt pavement patching, compacted Portland cement or fly ash modified base course, asphalt cement concrete (ACC) pavement milling, asphalt crack/joint sealing, Portland cement concrete (PCC) pavement milling, concrete crack/joint sealing, concrete curb and gutter, ACC pavement demolition and removal, PCC pavement demolition and removal, trail section replacement, Hot Mix Asphalt (HMA) binder course, HMA surface course, removal of existing pavement marking, pavement marking, compacted aggregate shoulders, topsoil shoulders, fill, excavation/cut, emulsified asphalt slurry seal, bituminous fog coat, cable guardrail, steel-backed timber guardrail, steel beam guardrail, PCC sidewalks, PCC pavements and slabs, early high strength concrete, geotextile, install Government furnished corrugated metal pipe (CMP) and CMP aprons, steel reinforcement, detectable warning panels, bollards, site restoration, seeding, and incidental related work.



Lake Red Rock requirement includes, but is not limited to, removal of existing aggregate base, preparation of existing aggregate base, compacted Portland cement or fly ash modified base course, new compacted aggregate base, compacted aggregate shoulders, topsoil placement, fill, excavation/cut, asphalt pavement patching, asphalt cement concrete (ACC) milling, asphalt crack/joint sealing, ACC pavement demolition and removal, saw cut asphalt, trail section replacement, bituminous fog coat, hot mix asphalt (HMA) binder course, HMA surface course, Portland cement concrete (PCC) milling, concrete crack/joint sealing, PCC pavement and curb and gutter demolition and removal, steel reinforcement, concrete curb and gutter, concrete pavements and slabs, PCC sidewalks, synthetic fiber reinforcement, seeding, geotextile, pavement marking, steel-backed timber guardrail installation, detectable warning panels, site restoration, and related incidental work.



Saylorville lake requirement includes, but is not limited to, removal of existing aggregate base, preparation of existing aggregate base, compacted Portland cement or fly ash modified base course, new compacted aggregate base, compacted aggregate shoulders, topsoil placement, fill, excavation/cut, asphalt pavement patching, asphalt cement concrete (ACC) milling, asphalt crack/joint sealing, ACC pavement demolition and removal, saw cut asphalt, trail section replacement, bituminous fog coat, hot mix asphalt (HMA) binder course, HMA surface course, Portland cement concrete (PCC) milling, concrete crack/joint sealing, PCC pavement and curb and gutter demolition and removal, steel reinforcement, concrete curb and gutter, concrete pavements and slabs, PCC sidewalks, synthetic fiber reinforcement, seeding, geotextile, pavement marking, steel-backed timber guardrail installation, detectable warning panels, site restoration, and related incidental work.

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 237110
New
Federal
88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION
Solicitation # W912EK26BA017
The US Army Corps of Engineers Rock Island District is soliciting competitive 8(a) bids under FAR Part 14 for water infrastructure improvements at the 88th RD US Army Reserve Center in Arlington Heights, Illinois. This firm-fixed-price construction project involves a comprehensive scope of work including demolition, directional drilling, and the installation of new water service and main lines. The base bid covers the provision of gate valves, vaults, meters, fire hydrants, and chlorination testing, as well as HMA patching, concrete sidewalk repair, and site restoration. Two additional options are included: Option A focuses on a new water connection to the Village of Arlington Heights watermain and the capping of existing connections, while Option B includes similar connection work along with the investigation of existing storm sewers under Central Road. The project is designated under NAICS code 237110 and requires a 270-day completion period. Bidders must submit all proposals electronically via the PIEE Solicitation Module by September 16, 2026, as emailed or hard copy bids will not be accepted. Key requirements include the submission of a Contractor Quality Control plan within seven calendar days of the Notice to Proceed and adherence to Davis-Bacon Act wage standards. Performance and payment bonds are required at 100 percent of the original contract price. Payment will be administered through the Resident Management System (RMS), and the project incorporates strict quality standards, including a three-phase control system and compliance with ASTM D3740 and E329 for soil and construction inspection.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS