Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Roadway and Drainage Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This State funded Director's Order project, managed by Caltrans District 6 in the Fresno/Bakersfield area, involves critical roadway and drainage repairs on State Route 166 in Maricopa, California. The project addresses roadway cracking and settlement approximately 100 to 200 feet in length and 3 to 4 inches in depth caused by subsidence. To remediate these issues, the scope of work includes excavating and removing a section of roadway measuring 200 feet long, 40 feet wide, and 5 to 12 feet deep, as recommended by geotechnical engineering. To improve drainage and prevent future issues, the project includes the installation of a 24-inch reinforced concrete pipe. This effort is identified under solicitation number 06-1J380 and was posted on September 23, 2026. The project has been designated as a CEQA Class 1 Categorical Exemption, with a Notice of Exemption filed on September 22, 2026. Shane Gunn, Senior Environmental Scientist, serves as the primary point of contact for this initiative.

General Info

Caltrans District 6 roadway and drainage repairs on State Route 166 in Maricopa.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

State Route 166 and Pentland Road, Maricopa, CA, 93252

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Shane GunnSenior Environmental Scientist

Full Description

Show more
This State funded Director's Order project will repair a section of road on State Route 166 that is cracking due to subsidence. Cracking and settlement of approximately 100-200 feet in length and 3 to 4 inches in depth was observed along the roadway center. Geotechnical engineering's recommendation was to excavate and remove approximately 5 to 12 feet down, 200 feet long and 40 feet wide of roadway. Hydraulics recommended installing 24" reinforced concrete pipe to help with drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS