Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Connecticut was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roadway Stabilization and Reconstruction Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Buckinghamshire Highways Professional Services Open Framework - Framework 2 of the 3 Complementary Highways Frameworks
Solicitation # BC/0002081
The Buckinghamshire Highways Professional Services Open Framework is a procurement by Buckinghamshire Council to establish a collective of high-performing contractors and consultants dedicated to maintaining a safe, resilient, and carbon-neutral highway network. Conducted under Section 49 of the Procurement Act 2023, this open framework scheme has a maximum total duration of eight years. The scope is divided into three discrete lots: Lot A for Commercial, Project and Procurement Support (estimated £525,000); Lot B for Scheme Design and Technical Support (estimated £2,237,500); and Lot C for Flood Schemes (estimated £520,000). The total estimated value of the framework is £3,282,500 excluding VAT. The Council intends to appoint a maximum of four suppliers per lot. The award process is conducted in two stages, beginning with a Pre-Qualification Questionnaire (PSQ) to assess legal capacity and technical ability, followed by an Invitation to Tender (ITT) for shortlisted suppliers. The final selection is based on the most advantageous tender, evaluated through a weighted scoring system consisting of 50% price and 50% quality. Quality assessments focus on technical capability, service delivery, the NEC4 Delivery Model, innovation, social value, and environmental impact. Successful bidders must maintain specific insurance levels, including £20m for Employer’s and Public Liability and £5m for Professional Indemnity. Performance is monitored via five core Key Performance Indicators (KPIs) and additional call-off specific metrics. There is no set-aside status for this procurement.
Buckinghamshire Council

POSTED

about 10 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This subcontract for the Connecticut DAS Procurement agency involves the primary engineering design for the stabilization and reconstruction of Poverty Hollow Road. The selected professional must develop reconstruction plans to restore two-lane traffic according to state scenic roadway standards and design specific stabilization measures for a river gorge area. The scope of work requires the use of hydraulic modeling software and geotechnical analysis tools to deliver final engineering design plans, specifications, and construction administration. Qualified candidates must hold a Connecticut Professional Engineer license to perform these services. The project is categorized under NAICS code 541330, with the response deadline set for September 9, 2026. Interested parties can find further details through the CTSource Bid Board.

General Info

CT licensed engineer to design Poverty Hollow Road reconstruction by September 9, 2026.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

This scope was carved out of 38482.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design & Engineering for Poverty Hollow Road Stabilization and Reconstruction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 11 days
  • Road Safety Audit and Scheme Design ServicesOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs primary engineering design for the stabilization and reconstruction of Poverty Hollow Road for prime contractors on Connecticut DAS Procurement projects. Designs stabilization measures for a river gorge area and develops reconstruction plans to restore two-lane traffic per state scenic roadway standards. Uses geotechnical analysis tools and hydraulic modeling software. Requires Connecticut PE license. Delivers final engineering design plans, specifications, and construction administration.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project (State Project No. 128-158), which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail along the north side of Tariffville Road, extending over the Farmington River bridge to Curtiss and Pattison Parks. The scope includes the installation of a boardwalk section within the Farmington River riparian corridor and wetlands. This project is funded via the Transportation Alternatives Program and administered by the Connecticut Department of Transportation. Key technical requirements include adherence to CTDOT Standard Specifications, the use of reinforced Portland concrete for bin walls with a minimum compressive strength of 3,000 psi, and the implementation of soil erosion and sediment control measures. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons of controlled materials disposal. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced. Bidders must provide a CTDOT Contractor Prequalification Certificate, bid security, a non-collusion affidavit, and a hold harmless and indemnification agreement. All contractors and subcontractors must comply with prevailing wage requirements and federal, state, and municipal laws. The DBE participation goal for this contract is zero percent. Bids must be submitted physically to the Director of Finance in Simsbury, CT, by November 24, 2026, at 2:00 PM; no fax or email submissions are permitted. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS