Roadwork-Supply&Install 1 SMOOTH WALL STEEL PIPE CULVERT by boring HWY 41 near Wakaw TL length 40 m
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Ministry of Highways is seeking a contractor for the supply and installation of one 750 mm diameter smooth wall steel pipe culvert on Highway 41, approximately 8.2 km southwest of the Highway 2 junction near Wakaw, Saskatchewan. The project involves using the boring method to install a culvert with a total length of 40 meters and a wall thickness of 12.7 mm. The contractor is responsible for providing all necessary materials, including borrow material, topsoil, geotextiles, riprap, seeding, and erosion control blankets. Work is expected to commence as early as November 2026, with a targeted completion date of February 28, 2027. This procurement will feature a shortened advertising period, and all initial quantities and project details remain subject to change. Bidders are required to provide a deposit equal to 5 percent of their total bid. Inquiries regarding the project should be directed to the provided government email address with the specific project reference H26125.
General Info
Place of Performance
SK, CANSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Estimated quantities of materials (subject to change):The following quantities are initial design estimates and are subject to change in the issued tender documents. • Proposed Culvert: o 1 – 750 mm x 40 m Smooth Wall Steel Pipe (SWSP) Culvert o 12.7 mm wall thickness• Random Riprap Type I – 35 m3• Random Riprap Type II – 35 m3• Supply and Install Silt Fence – 150 m• Supply and Install Erosion Control Blanket – 900 m2• Seeding – 900 m2The contractor will be responsible for supplying borrow material (250 m3), topsoil (15 m3), geotextiles, riprap, culvert markers, and seeding and erosion control materials to replace the culvert.Deposit with each Tender - 5% of total bidDeputy Minister of Highways Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing [email protected] within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities.
Similar Contracts
Same NAICS industry code
More opportunities from Saskatchewan Public Sector → Highways
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
