Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 21, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Robin's Ridge Drainage Improvements Project - ARPA

Closed
PD 23- 24.112State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes of 18 and 24 inches. Specialized requirements include trenchless crossings for 24-inch DIP sewers with associated launch and receiving shafts, the installation of standard and doghouse manholes up to 84 inches in diameter, and a CSO regulator fit out. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, and fine grading. Key project deliverables and requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Additionally, the project requires specific railroad insurance. All work must adhere to the provided technical drawings and project sheets.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system in accordance with the provided bid documents. Key deliverables include AC paving, pipe and fitting installation, traffic loops, and demolition, alongside specialized services such as jack and bore, cold planing, potholing, welding, and SWPPP compliance. This solicitation specifically targets certified HUBZone Small Business and Disadvantaged Business Enterprise partners, including DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The response deadline for this solicitation is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Robin's Ridge Drainage Improvements Project in Florida aims to construct a new storm sewer system along N. Oakfield Drive adjacent to West Florida High School to address flooding issues in the Robin’s Ridge Subdivision. The project involves reconstructing half of the roadway pavement to install an 18-24 inch storm sewer line on the east side of the road, extending approximately 800 linear feet from the FPL substation to the County Pond. Additionally, the work includes milling and resurfacing the remaining pavement, reconstructing four residential driveways, and repairing adjacent sidewalks. Utility conflicts have been surveyed, and the construction will also involve relocating and installing a 6-inch PVC water main with valves and service connections to ensure proper utility integration. The solicitation for this project, titled Robin's Ridge Drainage Improvements Project - ARPA, was posted on August 21, 2024, with a response deadline of September 20, 2024. The project is valued between $500,000 and $1,500,000 and is managed by the Florida Engineering organization under NAICS code 237110. Interested contractors can contact the primary point of contact, David Miller, via email or phone for further information. The project is part of a broader effort to improve stormwater management and infrastructure resilience within the community.

General Info

Documents

3
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Engineering
Contacts1 person available
OfficeN/A

Full Description

Show more
The purpose of the project is to construct a new storm sewer drainage system along N. Oakfield Drive adjacent to West Florida High School to alleviate flooding within the Robin’s Ridge Subdivision. The proposed improvements will include reconstruction of half of the roadway pavement to install the 18”-24” storm line on the east side of the road from the FPL substation to the County Pond approximately 800 LF in length. Milling and Resurfacing of the remaining pavement will be required as well as reconstruction of four residential driveways and adjacent sidewalk. Utility conflicts have been surveyed and construction will include relocation and installation of a 6” PVC water main with valves and service connections

More opportunities from Florida → Engineering

Same awarding agency

NAICS: 237310
New
SLED
Woodbine Road North Widening Project
Solicitation # 26-054
The Woodbine Road North Widening Project, solicitation number 26-054, is a federally funded infrastructure initiative managed by the Santa Rosa County Board of County Commissioners. The project involves the widening and reconstruction of Woodbine Road from Vinewood Lane to the Santa Rosa Sports Complex, transforming it into a four-lane divided roadway. The comprehensive scope of work includes the installation of sidewalks, traffic signals, signing, pavement markings, drainage infrastructure, and a stormwater management pond. Additionally, the roadway contractor is responsible for utility relocations, specifically adjustments to the Pace Water System. All construction must adhere to Florida Department of Transportation standards, as well as Santa Rosa County and Pace Water System specifications. The contract allows for a construction duration of 1,080 calendar days, with a final completion deadline of 1,110 calendar days, and a projected notice to proceed in January 2027. Liquidated damages for delays are set at 7,442 dollars per day. Bidders are required to provide a bid bond or certified check for 5 percent of the base bid, and contracts exceeding 200,000 dollars require performance and payment bonds. The project is subject to several federal mandates, including the Build America, Buy America Act and the Davis-Bacon Act for prevailing wages. Award decisions are based on the best interest of Santa Rosa County, with strict disqualification criteria for collusion, conflicts of interest, or poor performance history.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
North Walton Sports Complex – Geotechnical Investigation Services
Solicitation # 07-27
The Walton County Board of County Commissioners is soliciting quotes from qualified geotechnical engineering firms to conduct a subsurface investigation for the proposed North Walton Sports Complex in DeFuniak Springs, Florida. Located at Parcel ID 25-3N-19-19070-001-9040, the project site will be developed into an outdoor sports park featuring athletic fields, high-mast lighting, amenity buildings, parking areas, and pedestrian pathways. The scope of work requires the performance of eight structural soil borings to a minimum depth of 30 feet to evaluate soil, bedrock, and groundwater conditions. The selected consultant must perform laboratory testing using the AASHTO / Unified Soil Classification System and provide a final Geotechnical Engineering Report signed and sealed by a Professional Engineer licensed in the State of Florida. This report will provide critical data on seasonal high water table elevations and recommendations for site preparation, earthworks, and structural foundation design. The contract will be awarded to the lowest-priced responsive and responsible vendor. Interested firms must submit their proposals electronically via the OpenGov portal, ensuring that technical submittals and cost proposals are uploaded as separate documents. Required submission materials include a separate cost proposal, a vendor questionnaire detailing lead time and quote validity, and two professional references for similar work. The response deadline is November 16, 2026, at 12:00 pm Central, although the County reserves the right to close the solicitation early upon receipt of a sufficient number of timely and responsive quotes. New vendors are required to provide a W-9 and a completed ACH form upon award.
Engineering Services

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 541330
New
SLED
RFQ# RS-27-05 Construction Engineering and Inspection Services for Orange Drive (SW 92 Avenue to SW 67 Avenue)
Solicitation # RFQ# RS-27-05
The Town of Davie is soliciting qualifications for Construction Engineering and Inspection (CEI) services for the Orange Drive Pedestrian Improvements Project, located between SW 67 Avenue and SW 92 Avenue. This CCNA solicitation seeks a consultant to provide a lump sum not to exceed cost for CEI services and liaison support with various governmental agencies, including the Town Building and Engineering Divisions and Broward County. The estimated budget for these services is 178,972 USD, with a total performance period of 300 days, which includes the construction duration and a 30-day closeout period for Local Agency Program (LAP) requirements. Key deliverables include performing construction quality control inspections, conducting bi-weekly progress meetings, and coordinating with the Engineer of Record and other stakeholders. Proposals must be submitted electronically via the OpenGov portal by 2:00 pm on November 17, 2026. Evaluation is points-based, focusing on firm and key staff qualifications (40 percent), project experience and approach (30 percent), and technical capabilities regarding workload and budget management (30 percent). Key personnel must demonstrate specific FDOT/LAP CEI experience. The contract mandates strict compliance with federal and state regulations, including the Build America Buy America Act, Davis-Bacon labor standards, OSHA safety requirements, and various LAP federal-aid terms. Additionally, the selected vendor must adhere to affirmative socioeconomic steps for subcontracting and grant the Town a royalty-free license for data produced during the contract.
Engineering Services

POSTED

3 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
SLED
Continuing Construction Services – Water Resources Repair and Rehabilitation
Solicitation # RFQ- 27 - 001
The City of St. Petersburg, Florida, is soliciting Statements of Qualifications through RFQ-27-001 for Continuing Construction Services focused on Water Resources Repair and Rehabilitation. The scope of work is divided into four primary categories: SAN Annual Pipe Repair and Replacement, SAN Annual CIPP Lining and Manhole Rehabilitation, Lift Station Rehabilitation, and Potable and Reclaimed Water Main Repair and Replacement, as well as unscheduled repairs. The City intends to award contracts to multiple qualified vendors based on their technical expertise and project approach. All work must comply with City, State, and Federal standards, with specific adherence to Florida Department of Environmental Protection requirements for projects receiving non-City funding. The resulting agreement will be a Blanket Purchase Agreement with an initial three-year term and a possible two-year renewal option, utilizing a Field Order system for specific work assignments. Selected contractors must provide performance and payment bonds and adhere to strict submission guidelines via the OpenGov portal, including a 10-page limit per work category for the Statement of Qualifications. Evaluation criteria emphasize the firm's qualifications, key personnel, and reference projects. Additionally, the City encourages the utilization of small, minority, women, and veteran-owned business enterprises and requires contractors to grant the City first priority for services during public emergency disasters.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS