Robins RAPID Construction OTA Progressive Design Build Fiber Replacement

Open
FA8501-27-RAPID-CIRCUIT-F1-170129-OTAFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Air Force, 78th Civil Engineer Group, is seeking industry solutions under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework to replace Circuit F-01 from the Fowler Substation at Robins Air Force Base, Georgia. This project utilizes a Progressive Design-Build approach under the statutory authority of 10 U.S.C. 2808a via an Other Transaction Agreement (OTA). The scope of work involves the complete replacement of 15kV, 500MCM cabling, the removal and replacement of defective breakers and cable racks, the installation of new bell ends on conduits, and the pumping of manholes. The project is critical to preventing catastrophic infrastructure failure and ensuring continued airfield operations, with a planned construction magnitude estimated between $5 million and $10 million. The project is structured into two primary phases: Phase 1 focuses on preconstruction and collaborative design to reach a 65% design threshold and establish an open-book Guaranteed Maximum Price (GMP), while Phase 2 covers final design and full construction execution. The target timeline includes a six-month investigation and testing period, with the total replacement of Circuit F-01 targeted for completion within 14 months of the project start. Selection is based on a two-step, Qualifications-Based Selection (QBS) process. Step 1 evaluates written Solution Briefs focusing on past experience, team composition, and project approach, requiring a minimum of five years of relevant experience. Step 2 involves interactive pitch presentations and price evaluations for short-listed firms to determine the final best-value selection.

General Info

Air Force project to replace Circuit F-01 at Robins AFB via Progressive Design-Build.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Warner Robins, GA, 31098, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8501 Opl Contracting Afsc/pzio
Contacts2 people available
OfficeROBINS AFB, GA, 31098-1672, USA
Office AddressROBINS AFB, GA, 31098-1672, USA
Contacts

Full Description

Show more

FA8501-27-RAPID-CIRCUIT F1-170129-OTA


Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129


Description


The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a.


The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes.


This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a.


Purpose


The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia.


The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks.


Project Background and Existing Conditions


Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations.


The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties.



Project Areas


  1. Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO.   
  2. Phase 2 (Final Design & Construction Execution)

Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO.


  1. Project-Specific Objectives and Phasing

Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of
multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas.
 


OTA & RAPID Framework Approach


This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions.



Competitive Selection Process


Phase 1 Solution Brief Requirements


The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration.


Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement.


Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026.


Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page.  Email is the official form of submission for responses.   Surety letters may be attached without counting towards 5 page limit.  Page format should be 8.5 x 11.


The Solution Brief shall include:


  1. Cover Page
    • Company name
    • UEI
    • Mailing address
    • Primary point of contact
    • Email address and telephone number
    • Identification of this RAPID AOI


  1. Executive Summary, Team Composition, and Organization 

  • Summary of the respondent’s qualifications and anticipated delivery capability
  • Explanation of why the team is qualified for the anticipated requirement
  • The team’s understanding of the Robins Air Force Base operational environment
  • The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards).
  • The team’s proposed approach to Phase 1 collaboration and risk reduction
  • Identification of any material capability, staffing, access, bonding, or teaming assumptions.


  1. Past Relevant Construction Capability and Experience 

  • Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity.
  • Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards).  Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified.


  1. Financial Capacity and Bonding

  • A statement of financial capacity to perform the anticipated work
  • Current single-project and aggregate bonding capacity, if bonds are anticipated;
  • Name of surety
  • Any other information necessary to demonstrate capacity to perform the anticipated project.

  1. Construction Execution and Phasing Approach

  • Methodology for physical work execution
  • Utility outage coordination


Evaluation & Selection Criteria


The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder.  In accordance with PDB methodology, price will not be evaluated during the initial selection process.  Selection is based on qualifications, experience, and collaborative capabilities.   



Step 1: RAPID Phase 1 Equivalent


Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1.



Step 2: RAPID Phases 2 Equivalent


Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection.    



Step 1: Statement of Qualifications Evaluation Factors



Factor 1: Past Relevant Experience


  • Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity.
  • Focus: Historical performance in occupied facilities, managing congested site logistics,  complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards).  Note:  while  DoW experience is considered, it will not be a deciding factor in determining a firm more qualified.


Factor 2: Team Composition and Organization


  • Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily.


Factor 3: Project Approach and Understanding


  • Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction).  This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination).


Step 2: Pitch Presentation and Price Evaluation (Final Down-Select)


The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. 



Factor 1: Collaborative Capability and Cultural Fit


  • Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders.


Factor 2: Real-Time Problem-Solving and Risk Management


  • Focus: Capacity to identify, analyze, and mitigate complex project risks.  Evaluated based on response to real-time scenarios presented during the Q&A.


Factor 3: Innovative Design-Build Solutions


  • Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives.


Factor 4: Financial Capacity and Bonding


  • Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity.
  • Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement.


Final Selection and Award


Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder.  The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement.  


The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA.



Government Reservations


The Government reserves the right to:


  • Invite, not invite, or limit respondents advancing to later phases;
  • Conduct technical exchanges;
  • Request clarifications or supplemental information;
  • Negotiate with one or more respondents;
  • Modify, suspend, or cancel this Special Notice;
  • Issue additional notices or requests; and
  • Make no award.


Attachments


  1. UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY
  2. F1 Binder
  3. UHHZ170129 REV 22-02 base power grid F1
  4. REV 22-02 base power grid 0111
  5. REV 22-02 base power grid-Model F1 compact


Send all submissions to: contact@example.gov and contact@example.gov



Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization;


While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. Key requirements include replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades include the installation of raised flooring with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems, and upgrading lighting controls and ceiling fans. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be based on a best suited negotiate methodology, evaluating price reasonableness alongside non-cost factors such as past performance and corporate relevant experience. Offerors must provide two to four past performance questionnaires for projects valued at $1,000,000 or more completed within the last five years. Proposals are due by November 18, 2026, and must be submitted electronically to the Contracting Officer. The contractor is required to provide payment and performance bonds, and personnel must adhere to strict security and safety protocols, including background checks and registration of vehicles on the federal facility.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000, managed by NAVFAC Mid-Atlantic, is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as paving, drainage, and utility repairs. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, bid, payment, and performance bonds may be required, with bid bonds set at 20 percent of the proposal amount. The contract is subject to the Davis-Bacon Act and Buy American requirements. Contractors must adhere to strict quality control frameworks, including a three-phase control system, and provide detailed closeout documentation such as O&M manuals and a 20-year warranty on roofing labor and materials. Invoicing is to be processed monthly via Wide Area WorkFlow with required NAVFAC certifications.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope includes comprehensive site preparations, underground stormwater retention, utilities, landscaping, and parking. An additional option for the P1016 facility involves a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB certifications. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and sitework. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work encompasses architectural repairs, including drywall replacement, painting, ceiling tile and drywall ceiling repair, and flooring installation, as well as electrical repairs and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing where more stringent. The project has a total period of performance of 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit a single lump sum proposal by November 17, 2026, including a detailed cost breakdown, a project timeline, and a 90-day bid guarantee. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Required certifications include a valid Massachusetts Contractor's License, a Wage Rate Certification, and proof of insurance naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a specific 20-year manufacturer warranty required for LVP flooring.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion, including sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work requires the contractor to provide all labor, materials, and supervision to perform drywall installation, joint finishing, and painting, while managing the temporary removal and re-installation of HVAC equipment, water heaters, and furnaces. All work must be completed in a manner that ensures occupied-building protection and maintains required fire resistance and equipment clearances. The project is subject to the Davis Bacon Act, specifically wage determination OR20260100, Modification 1, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, a detailed project timeline, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value within ten days of award, as well as general liability insurance with a minimum of one million dollars per occurrence and three million dollars general aggregate. Final acceptance by CSD is contingent upon the successful testing of all restored mechanical, plumbing, electrical, and life-safety systems, the removal of debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → FA8501 Opl Contracting Afsc/pzio

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS