Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Robinswood Playground

Closed
26078State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is an Invitation for Bid issued by the National Park Service Denver Service Center for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. This Small Business Set-Aside project is a Firm-Fixed-Price contract with an estimated magnitude between $1 million and $5 million. The scope of work involves repairing and extending a seawall damaged by Hurricane Ian, specifically requiring selective demolition, the installation of weatherable rigid vinyl and FRP composite sheet pile walls, and comprehensive site restoration including soil backfilling, sodding, and the installation of limestone riprap. All work must be completed within a mandatory performance period of 259 calendar days, starting within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—including technical approach, schedule, and management approach—are significantly more important than price. Bids are due by November 6, 2026, and must be submitted via email. Contractors are required to provide a Job Site Safety Manager, a written Quality Control plan, and must adhere to the Archaeological Resources Protection Act of 1979 to protect soil deposits. Compliance with the Davis-Bacon Act and specific environmental standards, such as the use of biodegradable packaging and recycled materials, is mandatory. Payment requests must be processed electronically through the Invoice Processing Platform System following a seven-day draft review by the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 16 hours ago

DEADLINE

in 24 days
NAICS: 237990
New
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation project, managed by the US Army Corps of Engineers Huntington District, is a comprehensive modernization effort designed to extend the facility's operational life by 50 years. Located on the Kanawha River in West Virginia, the scope of work involves the complete replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation or replacement of 1930s-era hoist machinery and failing primary power feeders and electrical distribution systems. Critical structural repairs include the full replacement of the Tainter gate post-tensioned anchorage system due to active stress corrosion cracking, proactive replacement of the main lock miter gate anchorage, and the replacement of worn wire ropes and delaminating sheaves for the main lock emergency gate machinery. This project is currently in the market research phase, with an Industry Day event scheduled for November 2, 2026, to gather industry feedback on constructability, logistics, and risk. Technical requirements are stringent, specifying ASTM A709 Grade 50 F2 for fracture critical members and requiring straight-beam ultrasonic inspection for plates 1/2 inch or larger. Contractors must adhere to strict site access protocols, including the use of designated hauling routes and the installation of 6-foot chain link fencing in public areas. Coordination with AEP Hydropower is essential due to the project's impact on navigation and power distribution. Interested prime and subcontractors are encouraged to register via the provided portal and follow updates on SAM.gov.
W072 Endist Huntington

POSTED

about 16 hours ago

DEADLINE

in 19 days
NAICS: 237990
New
SLED
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Solicitation # OSU-260081
The Ohio State University is soliciting bids for Project OSU-260081, the Fuel Tank and Dispensing Infrastructure Replacement, located at 2578 Kenny Road in Columbus, Ohio. This general contract, with an estimated value of $1,627,730, involves the removal and replacement of three underground storage tanks and comprehensive improvements to related infrastructure, including dispensers, concrete, and canopies. The scope of work is divided into general requirements, facility construction—which includes contaminated soil and groundwater removal—and facility services covering fuel storage and electrical power systems. The project requires strict adherence to the 2024 Ohio Building Code, Ohio State DOT paving standards, and NFPA 70 electrical labeling requirements. Bids must be submitted electronically via BidExpress by October 15, 2026, at 2:00 p.m. EST. The contract will be awarded to the lowest responsive and responsible bidder. Key requirements include a 5.0% EDGE participation goal, compliance with prevailing wage rates, and the provision of bid, performance, and payment bonds. Once the Notice to Proceed is issued, the contractor has 92 consecutive days to reach substantial completion, with an anticipated construction start date in August 2027. Bidders must also provide detailed qualifications, including a five-year history of regulatory compliance regarding EPA, OSHA, and prevailing wage laws.
The Ohio State University

POSTED

1 day ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The City of Bellevue is soliciting bids for the Robinswood Playground project in Washington, with an estimated budget ranging from 970,000 to 1,030,000 dollars. The scope of work includes the demolition and removal of existing playground equipment, clearing and grading, and the installation of two new playgrounds tailored for 2-5 year olds and 5-12 year olds. These installations will feature engineered wood fiber mulch and artificial turf safety surfacing, adhering to ASTM F1487, CPSC, and ADAAG safety standards. Additional infrastructure improvements include a prefabricated steel shelter, concrete and asphalt paving, a portable restroom enclosure, ornamental planting, and modifications to the existing irrigation system. The project also requires domestic water line extensions and significant drainage improvements, as geotechnical studies indicate the site is not conducive for onsite stormwater infiltration. Critical project constraints include the protection of a Category IV wetland and the implementation of a Construction Stormwater Pollution Prevention Plan to manage 12,518 square feet of land disturbance. Contractors must meet specific insurance requirements for general liability, automobile, workers compensation, professional, and pollution liability. The procurement process includes several addenda modifying technical specifications for concrete, asphalt, and surfacing, as well as updated bid proposal forms. Bids for this solicitation are due by October 8, 2026, and must include the required Affidavit of Equal Opportunity and Title VI Compliance from the prime contractor.

General Info

Bellevue seeks bids for Robinswood Playground construction, budgeted $970k-$1.03M, due October 8, 2026.

Documents

16

Appendix B - Insurance Requirements (City of Bellevue)

PDF, High priority: read this firstspecifications
High

Appendix E - Construction Stormwater Pollution Prevention Plan (CSWPPP) - Robinswood Park Playground

PDF, High priority: read this firstspecifications
High

Appendix F - Prefabricated Shelter Calculations

PDF, High priority: read this firstspecifications
High

Appendix H - Playground Manufacturer's Drawings (Robinswood Playground)

PDF, High priority: read this firstspecifications
High

Bid No. 26078 - Robinswood Playground Project Manual

PDF, High priority: read this firstitb
High

ITB #26078 - Robinswood Playground Addendum #2

PDF, High priority: read this firstamendment
High

Robinswood Park Playground Geotechnical Engineering Study

PDF, High priority: read this firstspecifications
High

Robinswood Playground - Appendix I Wetland Survey

PDF, High priority: read this firstspecifications
High

Robinswood Playground ITB 26027 Q&A #3

PDF, High priority: read this firstq-and-a
High

Robinswood Playground - Prefabricated Shelter Drawings

PDF, High priority: read this firstspecifications
High

Robinswood Playground TIB #26078 Addendum 1

PDF, High priority: read this firstamendment
High

Appendix A - Not Used

PDF, Low priorityother
Low

Appendix D - Not Used

PDF, Low priorityother
Low

ITB# 26078 Robinswood Park - Q&A No 1

PDF, Low priorityq-and-a
Low

Office Depot Pre-Bid Meeting Attendance List

PDF, Low priorityattendance-list
Low

Robbinswood Playground ITB 26027 Q&A #2

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bellevue
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Bellevue
Office AddressN/A

Full Description

Show more
Work contemplated to be performed under this contract is as follows: Demolition and removal of existing playground equipment, clearing and grading, new connections to existing stormwater pipes, domestic water line extension, new 2-5 year old playground installation with engineered wood fiber mulch and artificial turf safety surfacing, new 5-12 year old playground installation with engineered wood fiber mulch, artificial turf safety surfacing, and drainage improvements, prefabricated steel shelter installation, concrete and asphalt paving, portable restroom enclosure, new ornamental planting, modifications to and expansion of an existing irrigation system. Engineer's Estimate Range $970,000 - $1,030,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS