Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rock Creek Road Maintenance

Awarded
Federal
Submission Closed
Solicitation #
127EAX26Q0014

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
Transportation and Economic Corridors - Invitation to Bid - TND0025216 - Cold Milling, Asphalt Concrete Pavement and Other Work, 697:02 Hwy 35 - 18 Km E of Hwy 35 selective
Solicitation # TND0025216
Transportation and Economic Corridors is soliciting bids for project TND0025216, involving cold milling, asphalt concrete pavement, and related construction work on Hwy 35 in the Peace Region, specifically from kilometre 0.000 to 16.740. The scope of work includes the installation of 43,900 tonnes of asphalt concrete pavement (EPS Mix Type M1), 74,050 square metres of cold milling, 31 kilometres of milled rumble strips, and various culvert works including grouting and the installation of smooth wall steel pipe and culvert liners. The contract completion date is October 15, 2027. The contract will be awarded to the lowest priced compliant bidder. Bidders must possess a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or Certificate of Recognition Equivalency Letter (COREL) as a precondition for the award; a Small Employer Certificate of Recognition (SECOR) is not acceptable. Tenders must be submitted in an unprotected PDF format via email to [email hidden] by January 13, 2027, at 2:01:00 p.m. Each submission must include a digital bid bond equal to 10% of the tender amount. Payment is processed through Proper Invoices with a 28-day payment timeline and a 5% holdback. The contractor is required to implement a Quality Control Inspection Program (QCIP) and provide a one-year warranty for workmanship and a minimum two-year manufacturer's warranty for materials. There is no set-aside status for this solicitation.
Transportation and Economic Corridors

POSTED

about 13 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Carson National Forest is seeking contractors for road maintenance activities on the Tres Piedras Ranger District, with a focus on various improvements including drain dip construction, road and curve widening, road obliteration, new road construction, rip rap placement, road reconditioning, and culvert installation. The project involves excavation and compaction of native materials for drain dips and road widening to achieve total road widths of 12 feet. New road construction includes clearing, grubbing, and significant earthwork over 0.6 miles. Road reconditioning covers ditch, shoulder, and roadbed maintenance as well as surface aggregate upkeep. The culvert installation component requires placing a large arched corrugated metal pipe supported by uncompacted bedding material. This contract, titled "Rock Creek Road Maintenance," with solicitation number 127EAX26Q0014, is a total small business set-aside under NAICS code 237310 for highway, street, and bridge construction. Posted by the Department of Agriculture’s Southwest 7 USDA Forest Service office in Albuquerque, New Mexico, the work will be performed in Tres Piedras, New Mexico. Interested parties must respond by April 10, 2026. The primary point of contact for this opportunity is Troy A. McCullough, who can be reached via email. This project aims to enhance infrastructure reliability and safety in the forest district through targeted road maintenance and construction activities.

General Info

Carson National Forest seeks contractors for road maintenance and construction in Tres Piedras, New Mexico.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Tres Piedras, NM, 87577, USA

Set-Aside

SBA

Documents

4
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first76 pages · ifb
High
XLSX, High priority: read this first4 pages · schedule-of-items
High
PDF, High priority: read this first73 pages · rfq
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 4 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 7 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA

Full Description

Show more

Amendment 0001 - 3/12/2026


The Purpose of Amendment 0001 is to:
1. Correct the quote due date discrepancy. Quote Due Date is April 10th, 2026 at 1:00 pm Central Daylight Time.
2. Remove Scheduled Site visit date. Due to current weather conditions at project location, there will not be a scheduled site visit. Contractors can visit the location on their own.


The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger
District.  Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet.  New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.

More opportunities from Department Of Agriculture → Csa Southwest 7 Usda-Fs

Same awarding agency

NAICS: 212321
Federal
Bushy Knoll Pit Crush & Stockpile
Solicitation # 127EAX27Q0017
Solicitation 127EAX27Q0017 is a combined synopsis and solicitation for the Bushy Knoll Pit Crush and Stockpile project, issued by the USDA Forest Service CSA Southwest 7. This firm-fixed-price acquisition is a Small Business Set Aside - Total under NAICS code 212321, with a size standard of 500 employees. The project, located in Happy Jack, Arizona, involves the mobilization, surveying, clearing, drilling, material extraction, crushing, and stockpiling of aggregate material, as well as the construction of an access road. The contractor is responsible for providing all labor, equipment, and supplies, and must obtain all necessary permits from the Arizona Department of Environmental Quality. The period of performance is 180 calendar days, with work beginning within 10 days of the notice to proceed. Proposals are evaluated based on technical approach, past performance, and fair and reasonable pricing, with award granted to the highest technically rated proposal. Required submissions include a technical proposal with a work plan and site-specific safety plan, a price proposal, and a signed SF1442, all submitted as separate PDF documents. Key requirements include a bid guarantee of 20 percent of the bid price, compliance with the Davis-Bacon Act, and adherence to MSHA safety specifications. Performance is governed by Forest Service Supplemental Specifications and FP-24 standards, with a requirement for topographic surveys before, during, and after operations.
Construction Sand and Gravel Mining

POSTED

8 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS