This Solicitation opportunity from Georgia was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ROCK SPRING RESURFACING PROJECT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Lamar County Board of Commissioners is soliciting sealed bids for the 2026 Rock Springs Resurfacing Project, identified as solicitation PE-77070-NONST-2027-000000006. This project is funded through 2026 LMIG and SPLOST funds and involves extensive road work across three primary locations: Rock Springs Road (0.99 mi), Chappell Mill Road (3.23 mi), and High Falls Road (2.62 mi). The scope of work includes the installation of turn lanes at four specific sites, asphalt patching, shoulder widening, resurfacing, and striping. Specific material requirements include 335 tons of asphalt patching, 2,217 tons of 19mm asphalt shoulder paving, 3,750 tons of OGI, and 5,954 tons of 9.5mm resurfacing. All construction must adhere to the current editions of the Georgia Department of Transportation (GDOT) Standard and Supplemental Specifications for the Construction of Transportation Systems, as well as all applicable GDOT Standards and Details. Interested bidders must submit sealed bids to the office of the Chairman in the Lamar County Administration Building by 2:00 p.m. on September 4, 2026, at which time bids will be opened and read publicly. Bid documents, including plans and specifications, are available by appointment at the county office or via email request, with digital access provided through the Engineer's FTP site. No documents will be provided via mail.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project will be funded with 2026 LMIG and SPLOST funds. Construction includes Turn Lane Installations at 4 separate locations as outlined in different plan sets, Asphalt Patching, Shoulder Widening and Resurfacing on Rock Springs Road (0.99 mi), Chappell Mill Road (3.23mi) and High Falls Road (2.62 mi) within Lamar County. The work will include construction of turn lanes at Rock Springs Road at Chappell Mill Road (Site #1), Rock Springs Church (Site #2), Rock Springs Church Road at High Falls (Site # 3), Chappell Mill Road at Rock Springs Church entrance (Site # 4), with 335 tons of asphalt patching, 2,217 tons of 19mm asphalt shoulder paving, 3,750 tons of OGI, and 5,954 tons of 9.5mm resurfacing (Rock Springs, Chappell Mill and High Falls Roads) and striping. All work shall conform to the Georgia Department of Transportation's (GDOT) Standard Specifications Construction of Transportation Systems, Current Edition; GDOT's Supplemental Specifications Construction of Transportation Systems, Current Edition; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions.
Bid Documents may be obtained at the County Office Location by appointment. Proposers are encouraged to request Bid Documents via email. All proposers requesting plans and bid documents will be emailed bid documents and/or granted access to the Engineer's FTP site containing digital copies of plans, specifications, and addenda. No documents will be mailed. Request for Bid Documents and any questions regarding the project or to schedule an appointment to pick-
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
